Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on July 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ADA Door Replacement, Maquoketa Caves State Park, Jackson County, Iowa

Closed
26CRDPBRRICH-0001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Place of Performance

IA, USA

Set-Aside

NONE

Documents

5

26CRDPBRRICH-0001 ADA Door Replacement

PDF, High priority: read this first11 pages · rfq
High

26CRDPBRRICH-0001 ADA Door Replacement

PDF, High priority: read this first11 pages · rfq
High

Maquoketa Caves State Park ADA Door Replacement - Construction Documents

PDF, High priority: read this first5 pages · specifications
High

Maquoketa Caves State Park ADA Door Replacement Construction Documents

PDF, High priority: read this first5 pages · specifications
High

Project 26CRDPBRRICH-0001: Maquoketa Caves State Park Ada Door Replacement - Addendum

PDF, High priority: read this first1 page · amendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jul 24, 2025 to Aug 7, 2025. NAICS code changed from 561730 to 238350. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa Department of Natural Resources
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Verify actual locations and elevations with DNR Engineer. All work shall conform to and be performed in accordance with all applicable codes and ordinances. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specification, special provisions and contract. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work. It shall be the contractor's responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer. The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer. Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from available surveys and records and therefore their locations must be considered approximate only. It is possible there may be others, the existence of which is presently not known or shown. It is the contractor's responsibility to determine their existence and exact location and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay caused by such work. The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade. The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes. NO WORK FROM 12 NOON FRIDAYS, UNTIL THE FOLLOWING MONDAY. For bid package documentation, including bid proposal, please contact Ryland Richards at +1 (555) 000-0000 or contact@example.gov. BID CLOSING DATE AND TIME: 8/7/2025 AT 3:00 PM CST! *Bids must be submitted as per the General Information and Instructions to Bidders

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS