Adaptive Ramp Metering System Integration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract focuses on the integration and enhancement of adaptive traffic control algorithms within the Caltrans EA 1Q720 system. The primary objective of the project is to optimize traffic flow on I-680 through the implementation of an Adaptive Ramp Metering System. Managed by Caltrans District 4 in the Bay Area/Oakland region, the project falls under NAICS code 541330 for engineering services. The opportunity was posted on September 17, 2025, and is aimed at improving transportation efficiency through advanced algorithmic control.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of 0Q960NOE.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Interstate 680 Coordinated Adaptive Ramp Metering Project
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
