This Solicitation opportunity from Florida was posted on September 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Addendum 2 BDC56-24-25 Bill Baggs Cape Florida Viewing Platform and Bulkhead Improvements

Closed
ITB-13847State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract pertains to the construction and improvement of the Bill Baggs Cape Florida Overwater Viewing Platform and Bulkhead, with a project scope that includes installing durable composite decking, railings, and pressure-treated lumber in accordance with specified standards. The work is scheduled for a base period of 180 days, extendable by an additional 180 days if an alternate scope doubling the work is awarded. The project is under the jurisdiction of Miami-Dade County, which requires the contractor to include permit costs in their bid, although major environmental permits such as DERM, USACE, and SFWMD have already been paid by the Florida Department of Environmental Protection and are not the contractor’s responsibility. Material specifications emphasize high-performance composite products like WearDeck or Trex, with strict deflection and structural criteria, and hardware must meet ASTM A316 standards. The contractor must sign and include the addendum with their bid, acknowledging receipt, or face potential rejection. The contract documentation references several key standards and permits but does not specify formal FAR clauses or detailed evaluation criteria within the addendum. Instead, it clarifies responsibilities regarding permits, permits fees, and material standards, and sets procedural requirements for bid submission. The project emphasizes compliance with local jurisdictional requirements, material quality, and timely completion, with the Florida Department of Environmental Protection serving as the primary administrative contact. Overall, the contract combines technical specifications, permit responsibilities, and procedural instructions to guide bidders in preparing compliant proposals for a federally funded construction project within a defined performance schedule.

General Info

Documents

1

BDC56-24/25 Addendum No. 2 - Bill Baggs Overwater Viewing Platform

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida Department of Environmental Protection (DEP)
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
September 9, 2025 NOTICE TO APPLICANTSADDENDUM NO. TWO (2) Bill Baggs - Overwater Viewing Platform and Bulkhead Improvements DEP BID NO. BDC56-24/25 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION. NOTICE It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid. _______________________________________Signature of Contractor and Date The following statements supersede & supplement the corresponding items in the specifications & drawings: 1. Question: On the attached Derm Permit it specifies the permit fee due is $28,750, is this required to be included in our proposal or was this paid? Answer: FDEP has already paid this fee. The contractor is not responsible for DERM fees. 2. Question: The USAC permit was attached. Is there a fee required to be paid by the contractor?Answer: There is no fee to be paid by contractor for USACE Permit. 3. Question: The SFWMD exemption was attached, just verifying there is no cost associated with this?Answer: There is no fee required to be paid by contractor for SFWMD permit.4. Question: We need to include the cost of building permits for Miami Dade county, does Key Biscayne have any jurisdiction on the property we need to be concerned with?Answer: No, Key Biscayne is not involved with the proposed project footprint. Miami-Dade County has jurisdiction for this project. 5. Question: The contract time is 180 days, The alternate doubles the amount of work required. Is there additional time going to be added should the Department award the alternate?Answer: An additional 180 days will be allowed if FDEP elects to award the alternate. 6. Question: The decking and rail boards call for composite solid planks. There are a lot of different manufacturers and material specifications, is there a specification or manufacturer that the material is to be based upon?Answer: Composite decking shall meet a maximum deflection criterion of L/360 for 100psf live load with joists spaced at 18” OC max. Material properties for composite railing members shall be a minimum of 1500 PSI bending stress and 65000 PSI modulus of elasticity. For railing install, locate top 2x6 rail snug against bottom of 2x8 rail cap. FDEP shall confirm color choice upon submittal and if decking and railing need to be of the same manufacturer for color consistency. Examples of acceptable products include: WearDeck, Trex. 7. Question: The Lumber is #1 SYP pressure treated, Is there a pressure treatment specification required?Answer: Pressure treatment is to meet the requirements of AWPA UC5B Standards for Southern Pine. 8. Question: The hardware is specified as Stainless Steel; do we have a grade of stainless required for the project?Answer: Hardware shall be ASTM A316 Stainless Steel. In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS