Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on December 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Addendum 3 BDC09-25/26 O'Leno State Park - Boardwalk Replacement

Closed
BDC09-25-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423710
New
Federal
Exterior Cipher Locks and Exit Hardware Retrofit, Hawaii
Solicitation # W912CN27QA0100001
Solicitation W912CN27QA0100001 is a supply acquisition with incidental installation services for the retrofit of exterior cipher locks and exit hardware at Building 768, Schofield Barracks, Hawaii. The project requires the installation of 17 fully operational cipher locks and exit devices, including the provision of master override keys, control keys, and comprehensive documentation such as programming guides, O&M manuals, and as-built drawings. All hardware must be SFIC-compatible and meet UL/GSA certifications, with installations performed by GSA-certified lock technicians to ensure compliance with DoD physical security and NFPA 101 Life Safety standards. The contractor must complete all work, including testing and key-control turnover, within 30 calendar days of award. This acquisition is a Small Business Set Aside - Total. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation method, awarding the contract to the responsible small-business offeror who is determined technically acceptable and offers the lowest evaluated price. Technical acceptability is based on the offeror's ability to meet salient characteristics, provide manufacturer-authorized installation personnel, and commit to a two-year warranty on hardware and workmanship. Invoicing and payment will be processed through the Wide Area WorkFlow (WAWF) system.
0413 Aq Hq Contract Augmented

POSTED

2 days ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract pertains to the replacement of boardwalks at O'Leno State Park, Florida, with a focus on minimal ground disturbance and environmental sensitivity. Scheduled for completion by December 10, 2025, the project involves installing 12 helical piles with verified 8-kip compression capacity, using certified CHANCE installers who must monitor torque readings during installation. All ground-contact fasteners and structural fasteners for decks and railings are mandated to be made of 316 stainless steel to ensure corrosion resistance, with specific allowances for hot-dip galvanized materials on certain non-ground-contact components. The construction approach emphasizes a top-down methodology to limit soil and vegetation disturbance, with daily erosion control monitoring required to protect the environment. The project also involves evaluating and replacing damaged existing piles, with procedures for unforeseen damage or subsurface obstructions requiring RFIs for engineer review and potential adjustments. Environmental and archaeological considerations are integral, requiring strict adherence to protocols for protected species and artifact discovery, with work restrictions on weekends and holidays unless pre-approved. Certification of helical pile installers is mandatory to maintain warranties and code compliance. The contract emphasizes compliance with procurement standards such as Buy American and documentation requirements, although specific details on procurement or packaging are not provided. The project documentation highlights the importance of signed addenda in bid submissions, with the Florida Department of Environmental Protection serving as the overseeing agency. Inspection and acceptance will occur on-site, with the government responsible for evaluating compliance based on field observations, torque verification, and environmental safeguards. Overall, the contract underscores technical precision, environmental stewardship, and procedural compliance as key elements of successful project delivery.

General Info

Documents

1
PDF, High priority: read this first4 pages · amendment
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Commercial Kitchen Equipment & SuppliesOpen now, due in 53 days
  • General Maintenance Supplies and Tooling SupplierOpen now, due in 5 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida Department of Environmental Protection (DEP)
Contacts1 person available
OfficeN/A

Full Description

Show more
December 10, 2025 NOTICE TO APPLICANTSADDENDUM NO. THREE (3) O'Leno State Park - Boardwalk ReplacementDEP BID NO. BDC09-25-26 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION. NOTICEIt will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid._______________________________________Signature of Contractor and Date The following statements supersede & supplement the corresponding items in the specifications & drawings:1. Question: Regarding the 12 helical piles, what testing or verification methods are required to confirm the 8-kip compression capacity, and who will bear the cost if the depths exceed the estimates? Answer: Verification of the pile installation will be required through monitoring the torque meter readings. Installation of the CHANCE piles will need to occur using their torque meter and converting the value to a compressive capacity. Submit RFI for depth deviations. 2. Question: Given the park's remote location and river access restrictions, what limits on equipment, like no heavy machinery in wetland, or work hours are there that might require phased or manual work and extend the schedule?Answer: Trail will accommodate UTV (Utility Terrain Vehicle) and equipment needs to stay on trail. Site visit recommended. 3. Question: Can we disturb the ground around the boardwalk, or does the project need to be built from the top down without any ground impact?Answer: Ground disturbance must be minimized during construction. A top-down approach should be implemented; however, there will be areas where disturbance will occur such as at locations where framing members touch or are located below the grade line. 4. Question: If existing wooden piles are found to be damaged and need replacement, how will the Department compensate the contractor?Answer: Submit RFI and engineer will evaluate. 5. Question: What criteria will be used to determine if existing piles need to be replaced?Answer: Piles split or rotted or those damaged at the beam connection locations will need to be evaluated by the engineer. 6. Question: Framing Plan Repair Notes, 5, on sheet S202.1, states that all connectors, plates, fasteners, and washers are to be hot-dipped galvanized or 316 stainless. There's a wide range in costs between the two. Can the department clarify which one to use to ensure accurate and comparable bids?Answer: Regardless of location, all bolts, nuts, washers, etc. at Boardwalks #3, #4 and #5 are to be 316 SS, see note in box on sheets S202.2 and S202.3. At Boardwalks #1, #2 and #6 bolts, nuts, washers, etc. may be hot-dip galv. (HDG) if not in contact with the ground. Those in contact with the ground are to be 316 SS. All screw fasteners securing deck boards and railing caps are to be 316 SS. Other fasteners, screws, nails, etc. are also to be 316 SS. 7. Question: Framing Plan Repair Notes, 5, on sheet S202.1, states that bolts and fasteners that make contact with the ground are to be stainless. Can you clarify if this means 304 or 316 stainless? There's a big cost difference and clarifying this would help ensure bids are comparable.Answer: All bolts, nuts, washers, fasteners, etc. in contact with the ground are to be 316 SS. 8. Question: If additional damage to areas not called out on the plans is discovered and needs repair, how will the contractor be compensated for the work?Answer: Submit RFI. Engineer and FDEP will evaluate. 9. Question: Given that many helical pile manufacturers like CHANCE require certified installers through their training programs which show a solid understanding of installation per Hubbell/CHANCE guidelines, does the project require proof of certification for the contractor or subcontractors? And what happens if non-certified personnel install the piles, potentially voiding warranties or failing code inspections?Answer: Certified CHANCE installers or approved equal will be required for this project. 10. Question: The addendum notes uncertain pile depths due to limited soil information. What liabilities does the contractor assume if underground voids like caves or sinkholes, or other unforeseen obstructions, require depths far exceeding the 20-foot estimate, leading to extra pile extensions, equipment, or redesign costs not covered in the base bid? Answer: Submit RFI. Design team will evaluate. 11. Question: What level of erosion control monitoring will be required, given the environmental sensitivity of the work area? Answer: Ideally, this work will be performed in the dry season when the possibility of erosion and flooding is minimized. Monitoring of the erosion control will need to be performed daily by the contractor. 12. Question: There are unknowns with the existing wood structure. If it's discovered that repairs not called out on the plans are needed, how will the contractor be compensated and what criteria will be used to determine repair needs?Answer: Submit RFI. Design team will evaluate. 13. Question: What level of archaeological monitoring is required? Will someone need to be onsite at all times, and is this the contractor's responsibility?Answer: Refer to “Instructions to Bidders” document and DHR letter. 14. Question: If artifacts or remains are found, will this be treated as a compensable delay or force majeure?Answer: Refer to “Instructions to Bidders” document. 15. Question: Can vegetation around the boardwalks be cleared to access the structure? Answer: Ground disturbance must be minimized during construction. A top-down approach should be implemented. 16. Question: If a protected species is identified or discovered during construction, resulting in a stop-work order, what are the protocols, and will FDEP cover the costs for delays, environmental surveys, relocation, and so on? Answer: Refer to “Instructions to Bidders” document. 17. Question: Will Mill Certifications be required as part of this project? If so, for what items? Answer: Not required. 18. Question: Will any procurement requirements such as Buy American or Buy America, be a part of this project?Answer: Refer to “Instructions to Bidders” document. 19. Question: Will steel/iron need to be produced in the United Sates? If so, what level of documentation will be required to verify?Answer: Refer to “Instructions to Bidders” document. 20. Question: Are there any work restrictions? Time, weekends, holidays, events? Answer: Holidays and events need preapproval. Weekends need advance scheduling with the Park. In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS