Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Advanced Metering Infrastructure (AMI) System and Installation Services

Open
2026-RFP-0143State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Pasadena, through its Water and Power Department (PWP), is soliciting proposals for a comprehensive Advanced Metering Infrastructure (AMI) system and associated installation services for its electric and water utilities. The project aims to modernize metering operations by implementing a vendor-hosted AMI headend system and Field Area Network (FAN), including the deployment of electric meters and water endpoints. The selected vendor will be responsible for the full end-to-end solution, including installation, testing, commissioning, and integration with the City's existing Oracle Customer to Meter (C2M) and Oracle Meter Data Management (MDM) environments using REST API web services, CMEP files, or Multispeak. The procurement process requires a separate technical and price proposal, with the award based on total average points from evaluators. Key requirements include compliance with the Build America, Buy America Act for water-related funding, adherence to WCAG 2.1 Level AA and Section 508 accessibility standards for digital deliverables, and the provision of 50% performance and labor and materials bonds. Bidders must be registered in SAM.gov and provide a lump-sum price for all services. Proposals must be submitted electronically via the City's eProcurement Portal by December 11, 2026.

General Info

Pasadena seeks proposals for a comprehensive electric and water advanced metering infrastructure.

Documents

1
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Water & Power Department
Contacts2 people available
OfficePasadena, CA, 91101, USA
Office AddressPasadena, CA, 91101, USA
Contacts
Jirair KaprelianManagement Analyst IV
Antonio WatsonProject Manager

Interested Companies (3)

GriffithSanta Fe Springs, CA
Metron FarnierLouisville, CO
N/aboulder, CO

Full Description

Show more
The City of Pasadena is an ethnically diverse community of approximately 142,000 residents and the ninth-largest city in Los Angeles County. Pasadena covers approximately 22.5 square miles and is one of the primary cultural and economic centers of the San Gabriel Valley, with over 100,000 jobs across a wide range of industries. The City provides a full range of municipal services including police and fire protection, library services, parks and recreation, and street maintenance, and also provides sewer and solid waste services to residents and businesses. In addition, the City owns and operates a municipal electric public utility ("Electric System") and a municipal water public utility ("Water System"). Pasadena Water and Power ("PWP"), a department of the City, is responsible for both the Electric System and the Water System and provides water and electric services to virtually all customers within City limits, along with water service to certain customers outside City limits. PWP serves approximately 68,000 electric accounts and approximately 38,000 water accounts. PWP is responsible for billing services for electricity, water, sewer, and refuse utilities, as well as several key utility-related taxes. The majority of electric and water services provided by PWP are metered, and customer usage collected on a monthly or bi-monthly basis serves as the foundation for utility billing. Utility billing operations include field services (meter reading and service work), billing services (data upload and bill generation), and customer service and payment processing. In April 2022, the City launched and implemented a new Customer Information System ("CIS") to improve automation and modernize customer and operational technology. PWP selected the Oracle Customer to Meter ("C2M") solution, including a Meter Data Management System ("MDMS") hosted in the Oracle Cloud Infrastructure ("OCI") environment, to support the City's business objectives and long-term technology roadmap. Additional contracts were awarded for system implementation services, electronic bill payment and presentment services, and a customer self-service portal. The CIS environment provides improved access to customer usage and billing information, supports time-based and complex rates, and establishes the platform needed to manage increased data volumes associated with future AMI operations. With the CIS foundation in place, the City is moving forward with implementing an Advanced Metering Infrastructure ("AMI") system for both its water and electric utilities. AMI is intended to modernize metering operations and enable secure, reliable, two-way communication between PWP and customer meters. The data collected through AMI will support improved operational efficiency, enhanced customer service capabilities, better visibility into consumption patterns, and stronger analytics to support conservation and grid modernization initiatives. As part of its planning efforts, PWP previously completed an AMI Needs Assessment, Business Case, and Roadmap to collect key operational and technical requirements, establish realistic timelines, and identify organizational needs and gaps. Building on that foundation, the City conducted a successful procurement for AMI consulting and program management services, and a qualified firm is now under contract to support the City through procurement, implementation planning, governance, and organizational readiness. The purpose of this Request for Proposals is to procure an end-to-end AMI solution and associated installation services. The selected vendor will provide a vendor-hosted AMI headend system and AMI Field Area Network ("FAN"), supporting communications infrastructure, electric meters and water endpoints (including water meters and retrofit registers as applicable), and integration services to deliver billing and interval reads to the City's Oracle C2M and Oracle Meter Data Management environment in a timely manner. A separate meter data management system and customer portal are not within scope, as those capabilities are currently supported through Oracle MDM and the City's VertexOne MyMeter/WaterSmart suite. The selected vendor will also perform installation, testing, commissioning, training, and go-live support to implement AMI at scale and integrate with the City's operational and customer systems.
Addendum #1: Please use the See What Changed link to view all the changes made by this addendum.

Similar Contracts

Same NAICS industry code

NAICS: 541512
New
SLED
Cybersecurity Maturity Model Certification (CMMC) Program Services
Solicitation # 09112026
The University of Arkansas, Fayetteville (UAF) issued solicitation 09112026 for Cybersecurity Maturity Model Certification (CMMC) Program Services to secure a term contract for two years with two optional renewal years. The objective was to engage a qualified firm to provide cybersecurity advisory, architecture, engineering, and compliance services to mature the university's CMMC program. The scope focused on achieving compliance with CMMC Levels 1, 2, and 3 to protect Federal Contract Information (FCI) and Controlled Unclassified Information (CUI). Key deliverables included a compliance maturity roadmap, the design of a scalable security architecture, a continuous monitoring program, and assessment readiness support. The procurement process included several modifications, such as the addition of a 2 million dollar Professional Liability insurance requirement and extensions to the proposal deadline. Evaluation criteria were weighted toward the technical proposal (40 points), respondent qualifications (30 points), and cost (30 points). However, on October 19, 2026, the University of Arkansas, Fayetteville officially cancelled RFP 09112026 via Addendum 3. This cancellation was prompted by changes in federal guidance that necessitated a reassessment of the procurement scope, with the university intending to issue a new solicitation once requirements are clarified.
University of Arkansas Fayetteville (UAF)

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 541512
New
SLED
Integrated Roadway Management Platform
Solicitation # 2128-RFP
The City of Rock Hill, South Carolina, is soliciting proposals for a single, fully integrated roadway management platform to oversee approximately 205 centerline miles of roadway. The required system must integrate roadway imagery, pavement and asset assessment, maintenance and capital planning, and work order management into a common map and database. Key technical requirements include AI-powered distress condition scoring, automated detection of assets such as manholes and traffic signs, and the ability to collect data using ordinary vehicles via smartphones. The platform must also support remaining-service-life analysis, budget forecasting, and the direct generation of work orders from AI-detected defects or citizen reports. The contract will be awarded to the highest-scoring proposal based on a weighted evaluation system, with the heaviest weight placed on AI technology and pavement evaluation capabilities (30%), followed by company experience (20%), software functionality (20%), price (20%), and implementation and support (10%). Proposals must be submitted electronically via the e-Procurement Portal by December 10, 2026. The resulting agreement will feature monthly invoicing with a 30-day payment term, and the City reserves the right to hold up to 10% retainage until all deliverables are satisfactory. Vendors must maintain liability and workers' compensation insurance and certify compliance with various employment laws, including the South Carolina Code of Laws regarding unauthorized aliens.
Project Management

POSTED

about 13 hours ago

DEADLINE

in 29 days
View Details
NAICS: 541512
New
SLED
FY27_EOPSS_ITS87_Artificial Intelligence Engineer
Solicitation # BD-27-1044-EPS17-OTIS-135351
The Executive Office of Public Safety and Security (EOPSS) is seeking a Cloud AI Engineer to support the enhancement and management of a system-wide criminal justice data platform. This role is focused on accelerating AI adoption and implementing enterprise-scale solutions to integrate data from courts, police departments, and custodial institutions. The engineer will be responsible for architecting retrieval-augmented generation (RAG) solutions using vector databases and embedding models, integrating Model Context Protocol (MCP) servers, and managing AWS infrastructure using Terraform and CloudFormation. Key security requirements include implementing AWS IAM and Snowflake Role-Based Access Control (RBAC). The engagement is a full-time position of 37.5 hours per week, running through June 30, 2027, with a maximum all-inclusive hourly vendor bill rate of $125. Candidates must possess at least 10 years of experience in AWS cloud and data solutions. While the primary location is Milford, Massachusetts, there is a preference for candidates residing in Massachusetts or those able to travel to Milford, Boston, or Middleborough. Selected candidates must complete CORI and DCJIS fingerprinting requirements in Chelsea, Massachusetts. This procurement is eligible for the Small Business Purchasing Program, and vendors may submit a maximum of eight resumes via the COMMBUYS portal.
Executive Office of Public Safety & Security

POSTED

about 14 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS