Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Advertisement for Bid

Open
PE-33957-NONST-2027-000000022State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cherokee County Water and Sewerage Authority is soliciting bids for the State Route 20 Widening Water Main Relocation project, located between Union Hill Road and East Cherokee Drive in Georgia. The scope of work involves the construction and relocation of water mains, including the installation of 11,360 linear feet of 36-inch, 1,400 linear feet of 20-inch, 15,500 linear feet of 12-inch, and 20,200 linear feet of 8-inch Ductile Iron Pipe. Additionally, the contractor is responsible for installing water services, removing existing water mains, and providing an initial record drawing survey. The project allows for a maximum of 960 calendar days for substantial completion and a total of 1,640 consecutive calendar days for final completion. The contract will be awarded to the apparent low bidder who meets the minimum qualifications. Bidders must submit sealed bids by December 17, 2026, at 10:00 A.M. local time to the Authority Board Room in Canton, Georgia. Required bid documentation includes the furnished bid form and a completed Contractor Qualification Statement and Questionnaire; any subcontractor performing more than 20 percent of the work must also submit a qualification statement. The successful bidder must provide performance and payment bonds upon execution of the agreement. There is no specified set-aside status for this solicitation.

General Info

Bids for the State Route 20 water main relocation project in Georgia.

Documents

1
PDF, High priority: read this firstifb
High

Read the document

Due in 28 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 28 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Cherokee County Water and Sewerage Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
The principal items of construction are the following:
11,360 LF - 36" DIP Water Main 1,400 LF - 20" DIP Water Main 15,500 LF - 12" DIP Water Main 20,200 LF - 8" DIP Water Main

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Georgia → Cherokee County Water and Sewerage Authority

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS