This Solicitation opportunity from Georgia was posted on November 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Advertisement for Bid

Closed
PE-33957-NONST-2026-000000016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours

AI Contract Overview

Show more

The project involves the construction and commissioning of a new Thermal Dryer Facility and a Final Effluent Water Pump Station at the Fitzgerald Creek Water Pollution Control Plant in Woodstock, Georgia. The scope includes building new structures, modifying existing facilities such as the Solids Electrical Building, Compressor Building, and Dewatering Buildings, and performing comprehensive site work encompassing civil, piping, stormwater management, electrical, structural, and instrumentation systems. The work is scheduled for substantial completion within approximately two years, with final completion around two years and two months from the start date, which is expected to follow the bid award. The contract requires adherence to Georgia state laws, including licensing and erosion control certifications, and mandates the use of bonds, affidavits, and certifications to ensure compliance and financial security. The procurement is managed by the Cherokee County Water and Sewerage Authority, with bids due by December 17, 2025, and a mandatory pre-bid conference scheduled for November 19, 2025. Bidders must purchase detailed contract documents from QuestCDN, register as planholders, and submit sealed bids in accordance with specified instructions. The contract emphasizes strict compliance with bonding requirements—such as a 5% bid bond, performance, and payment bonds—and mandates various certifications, including non-collusion, licensing, and immigration compliance. While the solicitation specifies performance timelines and site locations, it does not include detailed evaluation criteria, contract clauses, or pricing information in the provided documents. The work will be inspected and accepted at the project site, with oversight by the owner and engineer, but specific inspection procedures or quality standards are not detailed in the available materials.

Documents

1

Fitzgerald Creek WPCP Thermal Dryer Facility Advertisement for Bids

PDF, High priority: read this first4 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 33957 CHEROKEE PE-33957-NONST-2026-000000016 to PE-33957-NONST-2026-000000016.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Cherokee County Water And Sewerage Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
The Work is located at the Fitzgerald Creek Water Pollution Control Plant located at 260 Colemans Bluff Drive, Woodstock, GA 30188. The Work includes, but is not limited to, furnishing of the labor, materials, and equipment for the construction and start-up of the following: ¿ Construction of new Thermal Dryer Facility ¿ Construction of new Final Effluent Water Pump Station ¿ Modifications to existing Solids Electrical Building ¿ Modifications to existing Compressor Building ¿ Modifications to existing Dewatering Building No. 1 and No. 2 ¿ Associated site work, including site civil, site piping, stormwater control, and site electrical work ¿ Associated structural work for new and existing facilities ¿ Associated electrical and instrumentation and controls for new and existing facilities

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS