AdvM Call for Solutions - Expeditionary Additive Manufacturing (EAM) Systems
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The U.S. Army Aviation and Missile Command is seeking three Expeditionary Additive Manufacturing systems to be integrated at Fort Campbell, Fort Hood, and Fort Bragg. These systems must provide point-of-need manufacturing capabilities to convert digital technical data packages into structural, environmentally-grade components. The primary goal is to allow forward-deployed engineers to produce replacement parts, fixtures, and specialized tooling on-site, thereby reducing aircraft-on-ground status and overcoming supply chain delays for non-flight-safety-essential components. This solicitation, numbered PANRSA-26-P-0000040885, is issued under the Army Advanced Manufacturing Commercial Solutions Opening. Interested parties must submit questions by August 26, 2026, and the final response deadline is August 31, 2026. The project is managed by the Department of Defense through the Redstone Arsenal office, with primary points of contact being Melissa Jakes and Morgan McGee.
General Info
Agency
NAICS
Place of Performance
ALSet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The U.S. Army Aviation and Missile Command (AMCOM) is seeking innovative solutions consisting of three (3) Expeditionary Additive Manufacturing (EAM) Systems for immediate integration at Fort Campbell, Fort Hood, and Fort Bragg. These systems will provide an expeditionary, point-of-need manufacturing capability designed to immediately translate digital technical data packages (TDPs) into structural, environmentally-grade components within tactical maintenance environments.
Establishing expeditionary, point-of-need manufacturing capability at these installations is vital for empowering forward-deployed liaison engineers to manufacture immediate, structurally adequate replacement parts, fixtures, and specialized maintenance tooling on-site. Proactively deploying this capability is essential for overcoming extended supply chain lead times for low-demand, non-flight-safety-essential components, mitigating critical aviation readiness degradation, and significantly reducing prolonged aircraft-on-ground (AOG) status for simple component failures.
The full Call for Solutions document(.pdf), detailing the problem statement, required solution attributes, submission requirements, and evaluation phases, is available in the "Attachments" section below.
All questions regarding this Call must be submitted via email to Melissa Jakes at melissa.d.jakes.civ@army.mil and Morgan McGee at morgan.p.mcgee2.civ@army.mil. The deadline to submit questions for Phase 1 is Wednesday, 26 August 2026, at 12:00 PM Central Time.
The following shall be utilized in the email subject line: " Call for Solution – Advanced Manufacturing Expeditionary Additive Manufacturing (EAM) Systems’
This Call for Solution is issued under the Army Advanced Manufacturing (AdvM) Commercial Solutions Opening (CSO) which can be found at:
https://sam.gov/opp/e2f1410155dc4ba78c51fca8360875cf/review
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → W6QK Acc-Rsa
Same awarding agency
