This Solicitation opportunity from Wisconsin was posted on June 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Aeration Blower/Air Piping Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Edgerton is seeking sealed bids by August 7, 2025, for the replacement of an aeration blower and associated air piping at its Wastewater Treatment Facility. The project involves removing the existing blower, which will be provided to the city for storage or use, and installing a new Aerzen hybrid blower on a widened concrete pad. The installation includes approximately 120 linear feet of 10-inch stainless steel air piping connecting the new blower to the aeration basins. After installation, the city’s contractors will handle electrical, instrumentation, and control upgrades to ensure the new equipment operates effectively, with start-up and adjustments to be completed by December 19, 2025. The city has already purchased the new blower, expected to arrive by October 31, 2025. Bid proposals must be submitted to Cedar Corporation, with a bid bond or certified check equal to 5% of the proposal amount, and are valid for 30 days post-submission. The city reserves the right to reject any or all bids and waive irregularities. The project’s estimated value ranges from $50,000 to $150,000, and detailed project information is available upon request. The contract aims to ensure a seamless upgrade of the aeration system to improve wastewater treatment operations at the facility.
General Info
Place of Performance
WI, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Water Retail ServicesOpen now
- Sector NOLA Water Treatment for HVACOpen now, due in 8 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The existing aeration blower No. 1 is to be removed and provided to the OWNER for their storage/use as they select/determine. This includes the control panel and related electrical connections. All control and electrical connections are to be terminated to allow future new connections to the new Aerzen aeration blower equipment. Installation of one new Aerzen hybrid blower and associated equipment is to follow the removal of the existing equipment. Approved shop drawings for the new equipment are available upon request for determining the required work scope. The concrete pad for the blower also needs to be widened. Following the installation of the new Aerzen aeration blower and associated equipment, the City/Other Contractors will complete the electrical/instrumentation/control upgrades for the project to attain operational level for the new equipment. Start-up operation of the new equipment is to be completed onsite with Aerzen representatives, electrical/control representatives and the CONTRACTOR representatives. Any adjustments/corrections/modifications are to be completed by the CONTRACTOR at this time. It is expected that this work is to be completed no later than December 19, 2025. Additional work scope with this blower replacement is the installation of approximately 120 LF of 10” 304 SS Schedule 10 above grade air piping from the new Aerzen blower to the existing aeration basins.
The city has purchased new Aerzen blower equipment and is expecting delivery to the WWTF by October 31, 2025. The sealed bid proposals are to be sent to Cedar Corporation, Attention Dave Sauer, P.E., 2820 Walton Commons West, Suite 142, Madison, WI 53718. Email: Sign up to see this detail. Additional detailed information for this project is available and can be requested by contacting Cedar Corporation at the above address. The bid proposals shall be accompanied by a certified check payable to the City of Edgerton equal to 5% of the proposal or a bid bond of a bonding company authorized to do business in the State of Wisconsin in an amount equal to 5% of the proposal. Proposals shall not be withdrawn for a period of 30 days after the date of opening. The City of Edgerton reserves the right to reject any or all of the proposals and to waive any information therein.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
