Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 2, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aerial Burn Sources Sought

Closed
PANMCC-20-P-0000-012031Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
Inchelium Forestry, Pre-Commercial thinning fall 2026, Gold Mt. 156
Solicitation # InchThinning2026.pdf
The Confederated Tribes of the Colville Reservation, through Colville Tribal Forestry, is soliciting proposals for pre-commercial thinning and mastication services for the Gold Mt. 156 project area, totaling 52 acres. The contractor is responsible for providing all labor, equipment, supervision, and safety measures to execute thinning based on tree vigor and species preference. Technical specifications include strict guidelines on stump height, slash treatment, and the preservation of trees with a diameter at breast height of 8 inches or greater, unless otherwise marked. Compliance is monitored by a Contracting Officer's Representative who performs inspections to identify missed cuts or problem areas. Bids must be submitted in sealed envelopes to the Inchelium Forestry Office by 4:30 P.M. on October 21, 2026. Required submission documents include an updated SAM.gov registration, proof of insurance, a completed work plan, and a debarment certification. The contract emphasizes Indian preference, requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin and the submission of a TERO compliance and utilization plan. Payment is structured with 80 percent of each completed pay item paid within ten working days of final approval, while 20 percent is withheld until all contract requirements are satisfactorily completed.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in about 17 hours
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 16 days
NAICS: 115310
New
SLED
San Poil Forest stocking Survey 2027
Solicitation # StockingSurvey2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for five stocking survey contracts (SP-01-SSUR-27 through SP-05-SSUR-27) to be performed on the Colville Indian Reservation. The scope of work covers approximately 1,443 acres and 2,241 plots across the .30 mile, Swawilla, Summit North, and Williams Flats areas. Contractors are required to conduct survival and stocking surveys, submitting a detailed work plan that includes estimated daily acreage and completion schedules. Performance is measured by a Contract Officer's Representative (COR) who inspects at least 20 percent of plots; an accuracy rate of 85 percent or greater is required for acceptance, while full payment is tied to an accuracy rate of 95 percent and above. A 20 percent holdback will be withheld from all payments until all contract requirements are fulfilled. Award evaluations are based on technical qualifications and price reasonableness, with a strong preference given to certified Indian preference eligible firms. Bidders must submit a comprehensive packet including a Debarment Form, Title ID Certification, Bid Evaluation Form, and a TERO Compliance and Utilization Form. Additionally, contractors must provide liability insurance and adhere to tribal Occupational Safety Health Administration (IOSHA) standards. Those utilizing subcontractors or employees must submit a contracting and training plan to the TERO office. Failure to meet quality standards requires the contractor to rework the affected unit at no cost to the Tribe within two days of notification.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 5 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 13 days
NAICS: 115310
New
SLED
San Poil Forest, 4 PreCommercial thinning contrats, 21 Mile area
Solicitation # SanpoilForest2026Oct29.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for four pre-commercial thinning contracts in the 21 Mile area. The project encompasses a total of 120.1 acres divided into four units: Unit A (56.3 acres), Unit B (38.4 acres), Unit C (41.5 acres), and Unit D (40.2 acres). The scope of work requires the identification and maintenance of crop trees while removing competing vegetation, adhering to strict specifications such as stump heights of less than five inches and the protection of boundary trees marked with orange or yellow stripes. Bids must be submitted via a locked drop-off box at the San Poil Forestry Office by October 29, 2026, at 4:00 P.M., with electronic submissions prohibited. Applicants must be registered in SAM.gov and possess a valid Trader License. The award process strongly prioritizes certified Indian preference firms, and contractors must ensure that at least 51 percent of their seasonal or project-based workforce is of Indian preference origin. Technical qualifications and reasonable pricing are key evaluation factors, and the Colville Tribal Forestry reserves the right to reject any bid. Contract administration includes oversight by a designated Contract Officer's Representative who will perform quality inspections. Payment is based on completed and accepted acreage, with 20 percent of each payment withheld until final approval and site cleanup are completed. Contractors must provide liability insurance and comply with the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation as administered by TOSHA. Additional requirements include TERO certification to avoid specific fees and the submission of a comprehensive employment and training plan.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 9 days
NAICS: 115310
New
SLED
On-Call Registered Professional Forester (RPF) Services
Solicitation # RFQ 202627-1
The Monterey Peninsula Regional Park District is soliciting qualifications under RFQ 202627-1 to establish a prequalified list of licensed Registered Professional Foresters (RPFs) for on-call services. The primary objective is to secure professional forestry expertise to manage the practice of forestry across the District's 13,000 acres of diverse landholdings, including sites such as the Frog Pond Wetland Preserve and Garland Ranch Regional Park. The scope of work involves supervising and training crews and contractors, approving prescriptions, and providing signed documentation and regulatory filings in compliance with the Professional Foresters Law. Prequalification is valid for up to five years, though it does not guarantee work; the District will select the most qualified RPF from the list for specific projects based on experience and availability, followed by a proposal and rate negotiation process. Applicants must submit a Statement of Qualifications via the OpenGov portal by November 2, 2026, which must include California RPF license numbers, resumes, and at least three public agency references. The evaluation is conducted on a pass/fail basis, and fee proposals are strictly prohibited during this initial phase. Selected consultants must operate as independent contractors and maintain comprehensive insurance coverage, including general liability, automobile liability, and professional liability of at least $1,000,000. Administrative terms include monthly invoicing with a 30-day payment cycle for non-disputed fees and a 10-day written notice period for termination for convenience by the District.
Planning & Conservation

POSTED

about 16 hours ago

DEADLINE

in 13 days

General Info

NAICS

115310 - Support Activities for Forestry

Place of Performance

GA, 31314, USA

Set-Aside

SBA

Documents

1

Aerial+Burn+Sources+Sought.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Stewart
Contacts2 people available
OfficeFORT STEWART, GA, 31314-3324, USA
Office AddressFORT STEWART, GA, 31314-3324, USA

Full Description

Show more
SOURCES SOUGHT NOTICE CONTROL NUMBER: PANMCC-20-P0000-012031 THIS IS A Sources Sought Notice ONLY. The U.S. Government desires to procure a Fully Contractor-Operated and Maintained Exclusion Use Helicopter to Support Government Natural Resources Mission on a small business set-aside basis, provided 2 or more qualified small businesses respond to this sources sought synopsis with information sufficient to support a set-aside. Be advised that the U.S. Government will not be able to set aside this requirement if 2 or more small businesses do not respond with information to support the set-aside. We encourage all small business concerns, in all socioeconomic categories (including, 8(a) Business Development Program, Small Disadvantage Business, Historically Underutilized Business Zone, Service-Disabled Veteran-Owned, Women-Owned Small Business concerns), to identify their capabilities in meeting the requirement at a fair market price. This notice is issued solely for information and planning purposes - it does not constitute a Request for Quote (RFQ)/Invitation for Bid (IFB)/Request for Proposal (RFP) or a promise to issue an RFQ, IFB or RFP in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids or proposals at this time and will not accept unsolicited proposals in response to this sources sought notice. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Submittals will not be returned to the responder. Not responding to this notice does not preclude participation in any future RFQ or IFB or RFP, if any is issued. If a solicitation is released, it will be synopsized on the Governmentwide Point of Entry. It is the responsibility of potential offerors to monitor the Governmentwide Point of Entry for additional information pertaining to this requirement. The anticipated NAICS code(s) is: 115310, size standard $8 million. A need is anticipated for a Fully Contractor-Operated and Maintained Exclusion Use Helicopter to Support Government Natural Resources Mission which is currently being fulfilled through current contract # W9124M-18-D-0003. Attached are the draft Performance Work Statement (PWS) and Performance Requirements Summary (PRS). Key Tasks 1. Government personnel will determine helicopter mission, start and stopping times for ignition, grid spacing, and other parameters. Pilot shall decide if conditions are safe for the proposed flight. Pilot and aircraft shall be available on a one-hour notice or at the time specified by the government. 2. The pilot and the government personnel will confer on the mission to settle logistics, method of operation and other details. 3. Flight time for contractor payment purposes shall be determined by the engine hour meter. The pilot and government personnel will record and initial start and stop times to the nearest 1/10th hour on a form sheet. The start time shall be when the helicopter takes off from WAAF. Stop time will be when the helicopter has landed. Time shall be recorded to the nearest 1/10th hour on a form sheet initialed or signed by the pilot and the government employee. The original flight ticket will be supplied to the COR and payment will be invoiced in accordance to the original flight tickets. 4. Government personnel will be responsible for selection of the burning site, coordination with the military (except Marne Radio and/or Wright Tower) and other users of the site, delineating the burning site by pre-burning or other means, informing the pilot where to position the helicopter for the first run, and the spacing required between subsequent flight lines. The pilot is responsible for maintaining the specified distance between flight lines. The pilot (Contractor) is not responsible for fires that escape from the burn site to the undesignated areas. 5. Government personnel may ride in passenger seats to help navigate, make course corrections while aiding the pilot in staying on flight lines, observing wildfires and similar duties. 6. Flights shall be terminated at any time by the pilot when weather conditions or mechanical conditions are unsafe. Flights shall be terminated by government personnel when weather conditions adversely affect the prescribed burn, when military use restricts the airspace, when the prescribed burn endangers other ground areas or users of the burning site or when government personnel deem the flight unsafe or no longer necessary. 7. Flights may be made for government personnel to check the progress of burns, to assess the damage of previous burns, or to check wildfires on or within the GFC Cooperative Firefighting Area adjacent to Fort Stewart. Flight time will be in accordance with paragraph 5.4 above except burning attachments will not normally be used. 8. Contractor shall be required to complete forms listed below and secure written approval through WAAF Base Operations or Hunter Army Airfield before 1 December each year (telephone: WAAF: 912-435-3065 Hunter Army Airfield: 912-315-5110) to conduct flights on Ft. Stewart/HAAF: 8.1 DA Form 2400 (Certificate of Insurance) 8.2 DA Form 2401 (Civil Aircraft Landing Permit) 8.3 DA Form 2402 (Hold Harmless Agreement) 9. The FIRB is responsible for submitting and canceling flight plans with WAAF or relay to Wright Tower/Marne Radio to alert Air Traffic Control of proposed departure times. 10. Pilot will establish radio communications with Air Traffic Control (Wright Tower or Marne Radio) prior to departure from the area. (Telephone contact may be made with Air Traffic Control at 435-3065.) 11. Pilot will have a discrete beacon code permanently assigned by Wright Air Traffic Control and squawk code prior to departure to allow rapid identification. 12. Contractor will be expected to comply with FS Regulation 95-1(Aviation General Provisions and Local Flying Rules). 13. Government personnel and pilot shall wear PPE to include Nomex clothing and flight helmet during all prescribed burning and fire suppression operations. 14. Quality Assurance Inspection will be performed on all equipment as determined by the government COR. List other key criteria that are critical for capability, without which the small business concern is not capable. 1. A pilot and/or alternate with a minimum of 1500 hours helicopter experience with 500 hours of air taxi experience (FAR Part 135), 500 hours of aerial application (FAR Part 137); and at least 100 hours of PSD experience. The helicopter must pass an annual FAR Part 135 inspection. Not more than three pilots (one primary and two alternates) will be used each year (1 August - 31 July). The Contractor must provide pilots log books to verify experience prior to any flights conducted by the pilot. All pilots must be approved by the COR prior to any changes in personnel. 2. One helicopter equivalent to or above a Bell 206L Long Ranger with: Minimum 4- place passenger/pilot seating, minimum of one single turbine engine with a minimum of 640 shaft horsepower and must be capable of carrying a Premo MK III PSD machine, eight extra boxes of plastic spheres for ignition operations, and pilot with two government employees on a burning flight or carry pilot plus up to four government personnel on an inspection flight. 3. Alternate pilot if primary pilot cannot fly for any reason for an expected 24-hour period or longer. The alternate pilot shall be onsite and ready to fly within 24 hours after the primary pilot becomes unavailable. The alternate pilot shall remain on duty until the primary pilot returns. Access to a replacement helicopter if primary helicopter cannot fly due to maintenance or repair problems for an expected 24-hour period or longer. The replacement aircraft should be ready to use within 24 hours after the primary helicopter becomes unserviceable. The replacement helicopter shall remain in service until the primary helicopter returns to duty. 4. On board, dash-mounted radio for the pilot to communicate with WAAF Control Tower and/or Marne Radio at frequencies 126.25 MHz and 127.35 MHz and/or HAAF Tower, 124.975 mhz, HAAF BASOPS: 126.2 respectively. Contractor must comply with Marne Radio and/or Wright Tower requirements, i.e., notification when entering or leaving Fort Stewart air space, stops for fueling, etc. Notification on the Forestry radio net is not acceptable, except in emergencies or aircraft radio failure. Two fully operational Premo MK III PSD machines, one in the helicopter with one spare in case of mechanical failure and sufficient ethylene glycol to inject 300,000 balls. (Government will furnish PSD balls). The PSD machines should be identical. Special Elements 1. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and any other items or non-personal services necessary to perform aerial prescribed burning on Fort Stewart/Hunter Army Airfield, Georgia, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract. 2. The Contractor shall utilize a PSD ignition system compatible with the aircraft to prescribed burn ranges and timberland on Fort Stewart. The PSD system will ignite ground fuel on a grid system with spots located from 30 to 100 feet apart as prescribed by the aerial Firing Boss at the prescribed burning site. 3. The Contractor shall be responsible for igniting the grid pattern with an accuracy of +/-20% at a ground speed of 60 M.P.H. with ground winds 20 M.P.H. or less. 4. The contractor may occasionally be required to operate on Townsend Bombing Range or Fort Jackson, SC, 1-5 days a year for prescribed burning or wildfire reconnaissance. The helicopter will return to MidCoast Regional Airport at Wright Army Airfield (WAAF) at the end of each day. 5. The contractor shall develop, implement and maintain a system to inspect their services and equipment to ensure compliance with PWS requirements, and applicable laws and regulations. It shall specify tasks or equipment to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, and the titles of the individuals who will perform the inspections. 6. The contractor shall keep records on-site of all inspections and maintenance conducted by the Contractor and any necessary corrective action taken. These documents shall be available for inspection by the Government during the term of the contract. In response to this sources sought, please provide: 1. Name of the firm, point of contact, phone number, email address, DUNS number, CAGE code, a statement regarding small business status (including small business type(s)/certifications(s) such as SDB, 8(a), HUBZone, SDVOSB, WOSB, etc.) and the corresponding NAICS code. 2. Identify whether your firm is interested in competing for this requirement as a prime contractor or not. Identify subcontracting, joint ventures or teaming arrangement that will be pursued, if any. 3. Identify what percentage of work will be performed by the small business prime contractor and all similarly situated entity subcontractors. Note: A similarly situated entity subcontractor is a small business concern subcontractor that is a participant of the same SBA program that qualified the prime contractor as an eligible offeror and awardee of the contract. 4. Identify type(s)/certifications(s) such as SDB, 8(a), HUBZone, SDVOSB, WOSB, etc.) of the proposed subcontractors because the National Defense Authorization Act of 2013 amended in 2016 deems work done by similarly situated entities not to be subcontracted work for purposes of complying with the limitations on subcontracting requirement. 5. Information in sufficient detail regarding previous experience (indicate whether as a prime contractor or subcontractor) on similar requirements (include size, scope, complexity, timeframe, government or commercial), lead time for implementation, pertinent certifications, etc., that will facilitate making a capability determination. 6. Information to help determine if the requirement is commercially available, including pricing information, basis for the pricing information (e.g., market pricing, catalog pricing), delivery schedules, customary terms and conditions, warranties, etc. 7. Identify how the Army can best structure these contract requirements to facilitate competition by and among small business concerns. 8. Identify any condition or action that may be having the effect of unnecessarily restricting competition with respect to this acquisition. Please contact the MICC Advocate for Competition, Scott Kukes, at scott.d.kukes.civ@mail.mil or 210-466-2269, if you believe that this action is unreasonably restricting competition. Include the subject of the acquisition, this announcement, and the MICC POC information from the FedBizOpps notice. Provide the specific aspects that unreasonably restrict competition and the rationale for such conclusion. 9. Recommendations to improve the approach/specifications/draft PWS/PRS to acquiring the identified items/services.

More opportunities from Department Of Defense → W6QM Micc-Ft Stewart

Same awarding agency

NAICS: 562920
New
Federal
Recycling Services
Solicitation # W9124M27QA005
Solicitation W9124M-27-Q-A005 is a firm fixed price request for proposals for recycling services at Fort Stewart and Hunter Army Airfield, Georgia. This acquisition is set aside 100 percent for 8(a) small business concerns under NAICS code 562920. The contractor will be responsible for collecting recyclable materials from containers, processing and preparing materials for resale in local markets, and maintaining government furnished property, including the quarterly cleaning and repair of 25 percent of all containers. The period of performance begins with a one month phase in period from April 1, 2027, to April 30, 2027, followed by a base period and four one year option periods, extending the total performance through March 31, 2032. Award will be granted to the responsible offeror meeting all specifications who provides the lowest evaluated price. Evaluation is based on three factors: technical capability, past performance, and price. To be eligible, offerors must receive an acceptable rating for technical capability, which includes their approach to scheduled and unscheduled events, a 48 hour vehicle replacement strategy, and a verified equipment inventory. Past performance requires three relevant recycling references from the last three years. Offers are due by November 16, 2026, at 1:00 PM EST and must be submitted electronically via the Procurement Integrated Enterprise Environment portal. All offerors must be registered in the System for Award Management database to be eligible for award.
Materials Recovery Facilities

POSTED

6 days ago

DEADLINE

in 27 days
View Details
NAICS: 238330
Federal
IDIQ Flooring
Solicitation # W9124M26BA004
Solicitation W9124M26BA004 is a Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by the Department of Defense, specifically the W6QM Micc-Ft Stewart. This 8(a) Competitive set-aside under NAICS 238330 is for the removal and installation of various floor coverings, including carpet, resilient flooring, ceramic tile, and special epoxy coatings, at Fort Stewart and Hunter Army Airfield. The project magnitude is estimated between 5 million and 19 million dollars, with a performance period consisting of a base year from November 16, 2026, to November 15, 2027, and four subsequent option years extending through November 15, 2031. Bids will be evaluated solely on price and price-related factors. To be considered responsive, bidders must be active in SAM.gov, provide a bid guarantee of 20 percent of the bid price or 3 million dollars, and submit a properly signed sealed bid package. The contract mandates strict adherence to quality standards, including ASTM and TCNA guidelines, and requires prior approval of samples by the Contracting Officer. Special requirements include the use of the Wide Area WorkFlow system for invoicing, compliance with the Davis-Bacon Act for labor standards, and adherence to ADA and ABA accessibility guidelines. Additionally, the contractor must follow specific hazardous waste protocols for asbestos-containing materials and ensure all materials are delivered and stored in undamaged condition.
Flooring Contractors

POSTED

12 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS