Aiken Science & Engineering Bldg Restroom Renovati
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract pertains to the complete renovation of all restrooms in the Science Building at the University of South Carolina Aiken. The scope includes replacement or upgrades of floors, lighting, sinks, mirrors, partitions, repairs to toilet carriers, and painting of walls. Due to existing plumbing fixture layouts, additional demolition and repair work will be necessary to ensure compliance with ADA accessibility requirements. The project is structured as a design-bid-build construction contract with an estimated construction cost between $450,000 and $500,000. It involves compliance with applicable codes including the International Building Code, plumbing and electrical codes, and relevant ASTM and NFPA standards. The project location is in South Carolina, and deliveries and construction work are to be performed on-site at the University’s Science Building. The contract incorporates AIA A201-2017 General Conditions as its framework and requires contractor adherence to quality assurance processes, field inspections, testing, and regulatory approvals including final acceptance and Certificate of Occupancy issued by the Office of State Engineer. Contract award is based primarily on a Lowest Price Technically Acceptable evaluation methodology, emphasizing bidder responsiveness and responsibility, with the Owner retaining some discretion to award in its best interests. Documentation requirements include comprehensive project closeout materials such as certified test reports, warranty documentation, and standardized AIA payment applications. Bids must be submitted physically, with strict deadlines and specified formats, prohibiting electronic bid submission. Special contract requirements mandate submission of key personnel within 5 days after contract award and compliance with employee screening protocols. Final payment is contingent on completion and acceptance of punch lists along with submission of all required documentation evidencing fulfillment of project obligations. The contract pricing structure involves a schedule of values incorporating labor, materials, overhead, and profit, though no specific line-item financial details are enclosed.
General Info
Place of Performance
SC, USASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
