Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

Air Curtain Ash Rake

Active
W911S226U3431Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the supply of a new air curtain ash rake designed specifically for compatibility with Air Burners S327 Air Curtain units, with potential applications to Fire Box S Series models and various skid and trailer-mounted units, including military variants. The rake is constructed from high carbon steel with reinforced welds, and features a heavy gauge tubular steel handle. It is capable of withstanding continuous high temperatures ranging from 1,600 to 2,000 degrees Fahrenheit, with options for industrial high-temperature black oxide or heat-resistant coatings. The tool weighs between 12 and 18 pounds, depending on size, and is available in lengths from 6 to 8 feet with rake head widths between 12 and 16 inches. Functionally, the ash rake is intended for managing ash and unburned material during active combustion and for cleaning the burn chamber before and after operation. Design elements focus on operator safety, including extended handle length for maintaining distance from heat and debris, and reinforced construction to handle heavy debris loads. An optional ash clean-out implement with a blank steel faceplate can be provided for future customization. The contract includes delivery to Ft Hood, Texas, a standard warranty, and an operator/installation manual. This solicitation is a total small business set-aside under the Department of Defense, with responses due by June 19, 2026.

General Info

Supply of high-temp ash rake for Air Burners units, reinforced steel, 6-8 feet, delivery Ft Hood.

Agency

Department Of Defense → W6QM Micc-Ft Drum

NAICS

333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing View NAICS

Place of Performance

Fort Hood TX, NY, 76544

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Drum
Contacts1 person available
OfficeFORT DRUM, NY, 13602-5220, USA
Organization / Agency
Department Of Defense → W6QM Micc-Ft Drum
Office AddressFORT DRUM, NY, 13602-5220, USA

Full Description

Show more
2026 or 2027 new air curtain ash rake compatible for the Air Burners S327 Air Curtain. CONSTRUCTION: Material - High carbon steel rake head with reinforced welds; Handle -Heavy gauge steel tubular handle; Heat Rating - Suitable for continuous exposure to 1,600?2,000�F chamber temperatures; Finish - Industrial high temp black oxide or heat resistant coating. DIMENSIONS: Overall Length: 72?96 inches (6?8ft), Rake Head Width: 12?16 inches, Rake Head Thickness: 1/4in ? 3/8inplate steel, Handle Diameter: 1?1.25in WEIGHT: Approx. 12?18lbs, depending on length and head configuration. FUNCTIONAL USE - PRIMARY FUNCTIONS: Ash leveling during active burns, pulling unburned material toward the combustion zone, clearing burn chamber floor after shutdown, managing hot coals to maintain optimal burn efficiency, assisting with chamber clean out before next operational cycle. OPERATIONAL COMPATIBILITY -DESIGNED FOR USE WITH: Fire Box S Series (S111, S220, S327, S330, S460, etc.), Fire Box skid mounted and trailer mounted units, Air Curtain Destructor (ACD) military variants. SAFETY and COMPLIANCE - SAFETY FEATURES: Extended handle length for operator standoff distance, heat resistant construction to prevent tool failure, reinforced rake head to withstand heavy debris loads. Option - The optional ash clean-out implement with a blank 1in steel faceplate, for welding on a future connection supplied by the buyer. Final price shall include shipping to Ft Hood TX 76544, standard warranty applies, and operator/installation manual included.

Similar Contracts

NAICS: 333413
New
Canada
26-58018 Laboratory Wind Wall System, Amendment #2The National Research Council of Canada’s Aerospace Research Centre is seeking a turnkey Laboratory Wind Wall System designed to generate controlled, repeatable, and complex airflow conditions for free-flight testing of mid-size unmanned aircraft within their Drone and Flight Autonomy Laboratory (DFAL) at the Mirabel site. The Wind Wall must feature a 5 m by 5 m open-jet test section positioned 3 meters above ground, delivering uniform airflow with a maximum axial wind speed of 21–22 m/s and adjustable turbulence intensity ranging from 7% to 25%. It must support cold weather operation from -20°C to +30°C, function reliably in light rain or snow, and have a minimum operational lifespan of 20,000 hours. The system requires independent control of fan modules with precise speed adjustments, structural engineering compliant with Canadian codes, and a control software compatible with common operating systems that ensures secure data handling and synchronization. Additionally, the contract includes an option to expand the Wind Wall to 7 m by 7 m with design compatibility to the base system, maintaining the same bottom clearance and performance standards. The system must meet stringent safety, electrical, and environmental standards including IP ratings and CSA certification, and must be fully operational on delivery. The Offeror is responsible for design, manufacturing, delivery, on-site assembly at the NRC Mirabel location, and commissioning, alongside providing at least a one-year warranty, technical support, maintenance, and comprehensive documentation in both official languages, English and French, in compliance with Canadian regulations. All costs, including travel and delivery, are to be included in the proposal, with no additional reimbursement permitted unless pre-approved.
National Research Council of Canada

POSTED

1 day ago

DEADLINE

in 14 days
View Details