Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Air Traffic Control Tower (ATCT) Replacement

Closed
7915 27State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Hillsborough County Aviation Authority is seeking a qualified Design-Builder to replace the aging Air Traffic Control Tower (ATCT) at Tampa International Airport with a new blast-resistant facility located at Site 18C, an adjusted position approximately 40 feet west of the originally approved Site 18A, currently under FAA review. The project, funded through the Infrastructure Investment and Jobs Act, has a total budget of $150 million, covering design, permitting, construction, testing, and commissioning of the tower and associated base building, but explicitly excludes the FAA’s electronic and operational equipment, which the FAA will independently procure and install. The structure must conform to FAA Air Traffic Organization Terminal Facility Design Standards, be mission-focused rather than architecturally distinctive, and comply with all applicable federal and state regulations including ADA, FAA Advisory Circulars, TSA Security Directives, and Florida Department of Transportation standards. Construction is expected to align with the broader airport modernization effort, aiming for completion and crane removal by March 1, 2029, in advance of Airside D’s May 2029 opening. The solicitation operates under a cost-of-work basis with a not-to-exceed limit and requires submission of a Guaranteed Maximum Price after the design phase. The contractor must adhere to stringent procurement regulations including Buy American Act provisions for construction materials and steel, Davis-Bacon prevailing wage requirements, E-Verify employment verification, and compliance with anti-human trafficking and non-discrimination statutes. The Design-Builder must meet DBE participation goals and provide detailed documentation including team structure, key personnel resumes, project references, and DBE letters of intent. Quality control is mandatory, with the A/E firm held solely responsible for the accuracy and coordination of all design elements, subject to FAA oversight and potential independent constructability reviews. All invoices for basic services must include specific, non-vague descriptions, and reimbursable expenses require supporting documentation submitted in Excel format via a prescribed tracking form. Contract administration includes public records exposure, audit rights, and a term extending through construction warranty periods and claim resolutions. Proposals must be submitted electronically through the Authority’s procurement portal by July 29, 2026, and evaluated based on organizational structure, key personnel qualifications, cost control methodology, and prior project volume with the Authority, using a comparative scoring approach.

General Info

FAA and Tampa Airport replace aging control tower at Site 18C, completion by March 2029, funded by Infrastructure Act.

Place of Performance

FL, USA

Set-Aside

NONE

Documents

5

FAA Terminal Facilities Design Standard Version 2.4

PDF, High priority: read this firstspecifications
High

RFQ for Air Traffic Control Tower Replacement at Tampa International Airport

PDF, High priority: read this firstrfq
High

RFQ for Air Traffic Control Tower Replacement at Tampa International Airport

PDF, High priority: read this firstrfq
High

Exhibit_A_-_Conceptual_TPA_ATCT_Layout_Plan.pdf

PDF

Exhibit_C_-_TPA_ATCT_Construction_Animation,_April_2025_(MP4).mp4

MP4

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Planning and Development
Contacts2 people available
OfficeTampa, FL, 33614, USA
Office AddressTampa, FL, 33614, USA
Contacts
Richard CoudurierDirector, Planning & Design
April KellySenior Manager, Capital Programs & ITS

Interested Companies (60)

Suffolk ConstructionBoston, MA
Archer Western ConstructionHerndon, VA
Balfour BeattyOrlando, FL

See All 60 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The existing ATCT facility was constructed in the early 1970s and is in need of replacement. TPA's existing ATCT is operated, owned, and maintained by the Federal Aviation Administration (FAA). The FAA, in conjunction with the Authority, has determined that an acceptable location for the new ATCT is Site 18A, which is within an approximately 2-acre parcel located at the northwest quadrant of the Main Terminal complex. Since the FAA's approval, it has been determined that the ATCT location needs to be adjusted. The Authority has submitted an adjusted ATCT location to the FAA, which is approximately 40 feet west of Site 18A. The adjusted ATCT location is identified as Site 18C and is currently under review by the FAA. See Exhibit A, Conceptual Site Layout Plan, which represents the conceptual site layout plan for the ATCT facility and includes the new ATCT's adjusted location. The Project's location is currently under construction, featuring an elevated guideway for shuttle car service between the Main Terminal and the new Airside D. Construction is expected to be completed in February 2027. The Authority's goal is to complete the ATCT structure and remove the cranes by March 1, 2029, ahead of Airside D's May 2029 opening. The Authority and the FAA are in the process of finalizing an agreement whereby the Authority will contract for and manage the design and construction of the Project. The FAA will be included as a major stakeholder in all facets and approvals of the design and construction of the Project. The FAA will be responsible for the design, furnishing, installation, testing, and commissioning of all FAA required electronic and operational systems (FAA Equipment). Funding for this Project is provided through a contribution from the Infrastructure Investment and Jobs Act (IIJA).

More opportunities from Florida → Planning and Development

Same awarding agency

NAICS: 238220
SLED
Economy Parking Garage AC Replacement
Solicitation # 7630 26
The Hillsborough County Aviation Authority is soliciting bids for the Economy Parking Garage AC Replacement project at Tampa International Airport. The project involves replacing ten packaged air conditioning units that have exceeded their 15-year lifespan, specifically six units in the South Garage and four in the North Garage, serving elevator lobbies and machine rooms. The scope includes the demolition of existing units, ductwork, and louvers, followed by the installation of new equipment in accordance with manufacturer and FAA specifications. Work is to be performed in a phased construction schedule, with Phase 1 and Phase 2 each lasting 28 days, and overall substantial completion required within 112 calendar days of the Notice to Proceed. The contract will be awarded to the lowest responsible bidder based on lump sum bid amounts and a review of financial and professional qualifications. Bidders must submit all documentation through the online procurement portal by the deadline, including a bid bond, insurance certificates, and various certifications such as E-Verify, Non-Collusion, and Anti-Human Trafficking affidavits. The project includes a 40,000 dollar owner's allowance and requires strict adherence to Florida law, ADA compliance, and FAA regulations if federal grant funds are utilized. Contractors are responsible for all quality control, while the owner maintains the right to conduct inspections at manufacturing plants and the project site.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 1 month ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS