Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) Combined

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract targets comprehensive upgrades to the airfield infrastructure at the Port of Seattle, focusing on modernizing lighting systems by replacing circuits with low megger readings and installing energy-efficient LED fixtures and signage throughout the airfield. Parallel efforts will address deteriorating pavement and critical utilities to ensure operational safety and longevity. Wildlife hazard management is a key component, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs, and mitigation of ponding through regrading and new storm drainage systems to reduce bird activity and water accumulation. Additionally, failing flush fire hydrant access hatches will be replaced to improve emergency response access and compliance with safety standards. The project is forecasted under NAICS code 237990 and is managed by the Aviation Project Management Group, with Yanet Maldonado listed as the primary point of contact for inquiries.

General Info

Port of Seattle upgrades airfield lighting, pavement, utilities, and wildlife hazards to enhance safety and compliance by 2028.

Agency

Port of Seattle → Aviation Project Management Group

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPort of Seattle → Aviation Project Management Group
Contacts1 person available
OfficeN/A
Organization / Agency
Port of Seattle → Aviation Project Management Group
Office AddressN/A
Contacts
Yanet MaldonadoPort Contact

Full Description

Show more
Airfield Recircuiting – replace airfield lighting circuits with low megger readings; install LED lighting fixtures and signs Airfield Pavement and Utility Replacement – replace failing pavement and critical utilities Wildlife Hazard Management – remove turf edge dams along runways, taxiways and access roads; install anti-perching devices on airfield signs; mitigate ponding by regrading and installing storm drainage infrastructure Fire Hydrant Access Hatches Replacement – replace failing flush fire hydrant access hatches

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid by the U.S. Army Corps of Engineers Honolulu District, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 237990. Key requirements include adherence to USACE EM 385-1-1 safety standards, Davis-Bacon Act prevailing wages, and specific ASTM standards for stone materials. Awardees must provide a project manager, superintendent, quality control manager, and a site safety and health officer. The contract includes liquidated damages of 2,297 dollars per calendar day of delay and requires a bid guarantee as well as performance and payment bonds. Invoicing is conducted monthly, with a requirement to provide a breakdown of job pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
International
Port Repairs at Bella Bella facility British Columbia
Solicitation # T8080-260226
Transport Canada is soliciting offers under solicitation T8080-260226 for priority structural repairs at the Bella Bella Public Port Facility in British Columbia. The project aims to address critical deficiencies identified in the 2024 Routine Detailed Inspection by restoring the structural integrity of the approach and wharf head, replacing bearing piles, cross braces, mid-rails, and safety ladders, and reinstating pile cap connections. The objective is to mitigate urgent safety risks, ensure continued vessel access and community use, and extend the facility's functional service life. Field work is anticipated to begin in Fall 2026 and must be completed by December 1, 2026, with all final deliverables and close-out documentation due by December 31, 2026. The contract will be awarded based on a trade-off model considering the highest combined rating of technical merit and price, weighted at 60 percent and 40 percent respectively. To be compliant, offerors must meet all Mandatory Technical Criteria, including the provision of a detailed work plan and two marine repair client references from the last five years. Technical merit is further evaluated through point-rated criteria focusing on schedule alignment and resource allocation. The agreement is structured as an implied firm fixed price contract with a lump sum payment basis. The government retains sole responsibility for inspection and acceptance at the destination in the National Capital Region. Contractors must adhere to strict integrity and ethics requirements, including compliance with anti-forced labour regulations and international sanctions.
Department of Transport

POSTED

about 13 hours ago

DEADLINE

in 18 days
View Details