AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) Combined
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Airfield 2029 All Projects combined forecast issued by the Port of Seattle encompasses a wide range of critical infrastructure improvements and safety enhancements. The scope of work includes airfield recircuiting to address low megger readings through the replacement of lighting circuits and the installation of new LED fixtures and signage. Additionally, the project involves the replacement of failing pavement and critical utilities, as well as the installation of new flush fire hydrant access hatches. A significant portion of the contract is dedicated to wildlife hazard management to improve airfield safety. These efforts include the removal of turf edge dams along runways, taxiways, and access roads, the installation of anti-perching devices on signs, and the mitigation of ponding through regrading and the implementation of storm drainage infrastructure. This comprehensive set of projects aims to modernize airfield systems and reduce operational hazards.
General Info
Agency
Place of Performance
Not specifiedSet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
