Airfield Lighting Control & Electrical Infrastructure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the Peachtree City Airport Authority involves the installation of airfield lighting control panels and critical power infrastructure. The scope of work includes the installation of the Airfield Lighting Control Panel, Uninterruptible Power Supply systems, cabling, and equipment racks. A key technical requirement is the performance of bonding between MPPG and rack enclosures in strict accordance with FAA STD-019 and NEC 430.19(C) for SEF fans to ensure a fully powered and wired control system. The project falls under NAICS code 238210 and was posted on August 19, 2026, with a response deadline of September 17, 2026. The selected provider will act as a subcontractor to prime contractors to deliver the completed electrical infrastructure for the airport authority in Georgia.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
This scope was carved out of AP026-9100-36.
The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.
Air Traffic Control Tower Communications and Weather Station Package
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Georgia → Peachtree City Airport Authority
Same awarding agency
