Alameda Seaplane Lagoon Ferry Terminal Electrification Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Water Emergency Transportation Authority is implementing the Alameda Seaplane Lagoon Ferry Terminal Electrification Project as part of its Rapid Electric Emission Free (REEF) Ferry Program. This initiative aims to transition the San Francisco Bay Ferry fleet to all-electric, zero-emission operation to comply with California Air Resources Board Commercial Harbor Craft regulations. The project focuses on electrifying the terminal in Alameda, California, to support battery-electric ferry vessels traveling between Alameda and Downtown San Francisco. The scope of work includes both waterside and landside improvements. Waterside enhancements involve replacing the existing passenger float with a new Universal Charging Float installed on the current pile system, which will house charging equipment and a battery energy storage system with a total capacity of 1,351 kWh. Landside and shoreside improvements consist of utility and electrical upgrades to deliver 12 kV medium-voltage power to the terminal via electrical feeders routed beneath the existing fixed pier and gangway. The project is designed to maintain the existing overwater footprint and capacity of the terminal while reducing greenhouse gas emissions and improving regional air quality.

General Info

WETA is electrifying the Alameda Seaplane Lagoon Ferry Terminal for zero-emission vessel charging.

Agency

California → Water Emergency Transportation Authority

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

1701 Ferry Point Road, Alameda, CA, 94501

Set-Aside

NONE

Documents

(1)

NOE Alameda Seaplane Lagoon Electrification Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Water Emergency Transportation Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California → Water Emergency Transportation Authority
Office AddressN/A
Contacts
Chad MasonCapital Planning Manager
Seamus MurphyExecutive Director

Full Description

Show more
The Water Emergency Transportation Authority (WETA), operating public ferry service as San Francisco Bay Ferry, is electrifying the Alameda Seaplane Lagoon Ferry Terminal to support reliable, zero-emission ferry service between Alameda and Downtown San Francisco. The Project is part of WETA’s Rapid Electric Emission Free (REEF) Ferry Program, a comprehensive initiative to transition the San Francisco Bay Ferry fleet to all-electric, zero-emission operation and to support WETA’s compliance with the California Air Resources Board (CARB) Commercial Harbor Craft (CHC) regulations. The Alameda Seaplane Lagoon Ferry Terminal is among the first terminals to be electrified under the REEF Program to serve the battery-electric ferry vessels currently under construction. The Project encompasses both waterside and landside/shoreside improvements at the existing terminal. On the waterside, the existing passenger float will be replaced in kind with a new Universal Charging Float (UCF) installed on the existing pile system, housing a battery energy storage system with a total of 1,351 kWh of storage capacity together with the charging equipment needed to charge battery-electric ferry vessels during passenger loading and unloading. On the landside and shoreside, the Project includes utility upgrades and electrical improvements to deliver medium-voltage (12 kV) power to the terminal, with electrical feeders routed beneath the existing fixed pier and gangway structure to connect to the UCF. The Project does not change the existing use, capacity, or overwater footprint of the terminal. The Project will benefit ferry passengers traveling between Alameda and San Francisco through continued, reliable service aboard quieter, cleaner electric vessels; the broader Bay Area through reduced greenhouse gas emissions and improved regional air quality; and WETA and its regulatory partners by advancing the agency’s transition to a zero-emission ferry fleet.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 14 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS