This Solicitation opportunity from Ohio was posted on December 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Alum Creek State Park removal and installation of siding on the pole barn
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Ohio Department of Natural Resources is soliciting bids for the removal and installation of siding on a pole barn located at Alum Creek State Park in Delaware, Ohio. The project involves a single-story building approximately 35 by 55 feet, currently clad with metal siding covered by T1-11 wood siding. The scope includes removing all existing siding and gutters, wrapping and replacing fascia boards with new aluminum soffits, reinstalling gutters, installing new dark gray metal siding and white trim and soffits, removing and siding over windows, and carefully handling and reinstalling any electrical fixtures. The contractor is responsible for thorough site cleanup and debris removal, with a completion deadline of April 1, 2026. Equipment used on-site must be clean to prevent invasive species introduction, and any timber matting must be new. Bids will be evaluated based on the lowest total cost calculated from unit prices and estimated quantities; incomplete bids may be disqualified. The State applies specific preferences during evaluation, including Buy American, Buy Ohio, and Veteran-Friendly Business preferences, which adjust scoring by certain percentages to incentivize local and veteran-owned businesses, with detailed eligibility requirements. Interested bidders are encouraged to schedule a site visit by appointment between December 22, 2025, and January 19, 2026, to familiarize themselves with the site, as failure to visit will not justify contract release. The contract encourages sustainability practices such as energy efficiency, use of recycled materials, and reducing environmental impact, reflecting ODNR’s commitment to environmentally responsible procurement.
General Info
Place of Performance
Set-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- FRSMP277009/JLM-Lighting Phase 2Open now, due in 11 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
All equipment used on-site shall be free of sediment and debris from off-site to minimize the introduction of invasive species. Any timber matting used shall be new. Previously used matting will not be permitted.Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsivePreferences. The State will apply all preferences pursuant to Ohio Administrative Code 123:5-1-06.Following the initial evaluation and scoring, all Proposals will be considered for preferences. Preferences will be calculated at a rate of five percent (5%) for the first preference and two percent (2%) each for the second and third preferences. The preferences shall be combined and applied as a total percentage of the original Proposal to determine the score for evaluation purposes.Preferences will only be applied if there is at least one Offeror that does not qualify for that particular preference. For purposes of qualifying for a preference, an Offeror failing to complete the certification for each preference will be deemed as not qualifying for that preference.(a) For the Buy American preference, if any Offeror offers a product that is not a domestic source end product, the State will add the applicable percentage of the total available points to the total score of each Offeror offering a domestic source end product.(b) For the Buy Ohio preference, if any Offeror is a Buy Ohio Offeror claiming the preference, the State will add the applicable percentage of the total available points to each Buy Ohio Offeror’s total score.(c) If claiming the preferences in (a) and (b) based on the product(s) offered, an Offeror is only eligible to receive the preference if the cost of the product(s) offered exceeds 50% of the total offered cost for products and services. A Buy Ohio Offeror is also eligible to receive the Buy Ohio preference based on its significant economic presence in Ohio or a border state.(d) For the Veteran-Friendly Business preference, the State will add the applicable percentage of the total available points to any certified veteran-friendly business Offeror’s total score.Site Visit & Point of ContactPrior to submitting a bid response, offerors are encouraged to visit the park.Site visits available by appointment only 12/22/2025 through 1/19/2026. To schedule an appointment, contact: Shawn Bailey +1 (•••) •••-••••Sign up to see this detail.Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Sustainability: ODNR desires to further its commitment to sustainability through encouraging our vendors to adopt this business philosophy. Improving energy efficiency helps control rising energy costs, reduces environmental footprints, and increases the value and competitiveness of vendors. This means getting the most out of energy, water, materials and resources used in their business. Sustainable concepts and practices vendors should consider: Develop a plan for sustainability, select energy efficient products, explore renewable energy services, understanding efficient water solutions, reducing your organizations carbon footprint, utilize green suppliers/vendors, recycling and resource recovery, use of recycled products, reuse on-site materials, consider cost and value of sustainable options.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
