Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Alvarado 2nd Pipeline Extension

Forecast
2026-NOD-0058State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Diego plans to upgrade its water infrastructure by replacing approximately 3,235 linear feet of existing 24-inch diameter cement mortar lined and coated steel water main with new 16-inch diameter water main using a replace-in-place method. Additionally, around 2,730 linear feet of new 16-inch diameter water main will be installed via open trench construction, extending service to include associated water services, fire hydrants, valves, meters, curb ramps, paving, and other necessary appurtenances. Existing infrastructure will be decommissioned as part of the project, including approximately 406 linear feet of 24-inch diameter CMLCS and asbestos cement pipe, as well as 3,840 linear feet of 4-inch diameter PVC pipe currently serving the San Diego Surf Sports Park. To maintain service continuity, about 35 linear feet of new 4-inch diameter PVC pipe will be installed to reconnect the abandoned section to the upgraded system. The project builds upon prior environmental review under a Mitigated Negative Declaration adopted on November 30, 2011, for Citywide Pipelines Projects, which established the regulatory framework for similar infrastructure upgrades across the city. All work is anticipated to occur within San Diego, California, with Nader Naghavian, Associate Engineer at the City of San Diego, designated as the primary point of contact. The project was posted as a forecast on May 28, 2026, indicating planned procurement activity, though no solicitation number or set-aside details are currently available. The initiative aims to improve water system reliability, capacity, and compliance with modern standards while minimizing long-term maintenance needs.

General Info

San Diego upgrades water main with replace-in-place and trench methods, installs new pipes, decommissions old lines, improves reliability.

Agency

California → City of San Diego

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Nader NaghavianAssociate Engineer

Full Description

Show more
The Project proposes to replace-in-place approximately 3,235 linear feet (LF) (0.61 miles) of existing 24-rnch diameter cement mortar lined and coated steel (CMLCS) water mains with new 16-inch diameter water mains; install approximately 2,730 LF (0.52 miles) of new 16-inch diameter water main via open trench construction method, including all associated water services, fire hydrants, valves, water meters, curb ramps, paving and other appurtenances; abandon approximately 406 LF of 24-inch diameter CMLCS & asbestos cement (AC) water main; abandon approximately 3,840 LF of 4-inch diameter PVC water pipe currently servicing the San Diego Surf Sports Park located southeast of intersection of Via de la Valle and El Camino Real; and install approximately 35 LF of new 4-inch diameter PVC to reconnect the abandoned PVC pipe to the new 16-inch diameter water main. Description of Previous Action/Project: The City of San Diego previously prepared a Mitigated Negative Declaration for Citywide Pipelines Projects (Project No. 255100). The Mitigated Negative Declaration was adopted by the City of San Diego City Council on November 30, 2011 (Resolution No. 307122)

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, piping and fittings, traffic control, demolition, and preconstruction video services. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the project bid documents and specifications provided via the Inland Empire Utilities Agency bidding website.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS