Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 1, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, PA

Closed
W912DR-23-X-0TAPFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Renovo, PA, 17764, USA

Set-Aside

NONE

Documents

1

A.03.09+Draft+ALVIN+BUSH+Rock+Wall+Stabilization+Sketches.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Feb 9, 2023 to Feb 16, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts2 people available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA
Contacts
Trahon Battle
Ryan Fernandez

Full Description

Show more
This Sources Sought is not a Request for Proposal, Request for Quote, or Invitation for Bid. There is no commitment by the Government to issue a solicitation, make awards, or pay for respondent's expenditures made in response to this notice. Interested vendors are responsible for monitoring this notice for any subsequent amendments. All submissions become government property and will not be returned. Any solicitation issued as a result of this notice will be in a separate announcement. The U.S. Army Corps of Engineers (USACE), Baltimore District is considering a requirement for construction services for the Alvin Bush Dam Rock Wall Stabilization Project. The attached drawings are available for review. The anticipated magnitude of construction is between $10,000,000.00 and $25,000,000.00. The small business size standard is $45,000,000.00 for this NAICS. The purpose of this notice is to survey interest and obtain capability statements from industry. The jobsite is located at the Alvin Bush Dam on Kettle Creek in Clinton County, PA. The dam falls within the Susquehanna River Basin and is approximately 30 miles northwest of Lock Haven, PA. Kettle Creek joins the West Branch of the Susquehanna River at Westport, 15 river miles above Renovo and 112 river miles above the mouth of West Branch of the Susquehanna. PROJECT DESCRIPTION Original construction of the Alvin Bush Dam began in 1959 and was operationally completed in 1962. It is owned, operated, and maintained by the USACE Baltimore District. Primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The embankment is zoned with a maximum height of 165 ft. and length of 1,350 ft. The spillway was excavated into rock during original construction of the dam, is made of concrete and measures 250 ft. wide across the crest. An access bridge approximately 550 ft. downstream of the spillway crosses the spillway channel and is the only means of access to the project site during times of high discharge (a separate access road exists approximately 0.5 miles downstream but is inundated during high discharge or spillway flow). Bordering the top of the spillway excavation on the right side is Kettle Creek Road (State Route 4001). The existing walls along the spillway are made of concrete. However, the right wall was only lined to the immediate location of the existing weir, whereas the left side extends 80 ft. downstream of the access bridge. The rock face along the right wall of the spillway channel is deteriorated and has nearly eroded back to the state roadway. This is caused by erodible areas of the rock being weathered away and collapsing into the spillway channel. This process has also been accelerated by water runoff coming from the above roadway and down over the face of the spillway wall. Freeze/thaw conditions involving this runoff as well as groundwater seepage also acts as an accelerant. This progressive erosion has caused the exposed rockface to migrate towards the edge of the roadway, threatening to damage the shoulder, and furthermore undermine the road. Similar to the spillway area, the rock walls of the dam's primary outlet channel have deteriorated due to the erosion of weathered zones which results in the collapse of overlying blocks. Additionally, flow from the tunnel outlet erodes rock at the base of the channel downstream of the low concrete walls, allowing more fall in. In 1986, shotcrete was applied to the face of the walls approximately 60 ft. downstream in order to stabilize the walls. Some vertical rock bolts (believed to be shallow) were installed around the perimeter of the cut, along with slush grouting of the ground surface to limit infiltration. Chain link fencing, held in place by rock bolts into the face, covers the shotcrete area (installation date uncertain). This system however has currently failed, leading to further erosion and large rocks falling off the face of the walls, creating an unsafe environment. The main feature of work for this stabilization project includes the installation of anchored, reinforced concrete liner walls against the exposed rock faces at both the spillway and outlet channel. The concrete liner walls will be constructed to effectively protect the weak rock face from exposure and weathering and will restrain movement of localized areas of rock thereby maintaining the stability. Rock excavation by line drilling with 3-inch diameter holes at maximum 6-inch spacing will be required along the alignment of the new walls to allow the concrete to be placed uniformly along and directly against the finished rock face alignment. Rock anchors are required to increase the stability of both the proposed concrete liner wall, and bedrock blocks or wedges that have a potential of failing. To establish the rock anchor design, a non-traditional method was utilized due to the extended size (both length and height) of the concrete wall. The anchor type selected for this project is a high-strength (150 ksi) all-thread anchor bar with pre-assembled double-corrosion protection. The anchor holes will be drilled normal to the slope/wall at downward 4:1 batter. A minimum anchor hole diameter of 4-1/2" is needed to accommodate the design anchor sizes with corrosion protection. The anchor hole will be pressure tested and pre-grouted to assure watertightness prior to installation. After installation, the anchor will be single-stage grouted and tensioned once the required grout strength is achieved. The bearing plate is located within a concrete block-out, located one foot beneath the concrete wall surface. This anchor type and installation method reduces costs while providing adequate stability. The 45-foot wall height design requires 165 kips of individual anchor load, which is satisfied using a 1-3/4" dia. bar size, the 38-foot wall height design requires 142 kips of individual anchor load, which is satisfied using a 1-3/8" dia. bar anchor, the 32-foot wall height design requires 112.5 kips of individual anchor load, which is satisfied using a 1-1/4" dia. bar anchor. In addition to the main feature of work, additional features will be constructed as part of the total project scope of work. These additional features include installing a new concrete ditch along the edge of the state roadway adjacent to the top of the right wall of the spillway, installing a new concrete headwall to the end of an existing 18 in. pipe, constructing a permanent access road into the spillway, and constructing new stairs and a ladder to safely access the outlet channel. CAPABILITIES STATEMENT Vendors interested in the potential procurement shall submit a brief capabilities statement no longer than ten pages. The capabilities statement shall include the following. 1. Company name, address, point of contact, phone number, e-mail address, CAGE code, and UEI number. 2. Business size in relation to the NAICS, including small business category as applicable (e.g. woman-owned small business, service-disabled veteran-owned small business, etc.). 3. Narrative of a maximum of five relevant construction projects within the past ten years. Describe work performed as a prime or subcontractor, dollar value of the projects, and customer names. The following are considered relevant to this project. a. Ability to obtain all necessary project permits for this type of work; specifically related to the Pennsylvania Department of Environmental Protection National Pollution Discharge Elimination System (PADEP NPDES) Permit. b. Experience in the design of Erosion and Sediment Control Plans for the project in accordance with the PADEP Erosion and Sediment Control Program Manual 363-2134-008 and the preparation of the PAG-02 General Permit for Discharges of Stormwater Associated with Construction Activities NOI including a completed Stormwater Pollution Prevision Plan (SWPPP). c. Professional Engineer, licensed in the State of Pennsylvania, with experience in the submissions of the NPDES General Permit NOI with completed Erosion and Sediment Control Plans and the (SWPPP) package to the Clinton County Conservation District, PA. d. Experience with line drilling for rock excavation in preparation of the rock face for concrete placement, as well as general earth moving activities related to the excavation of rock materials. e. Experience with installation of the new concrete wall structural anchoring systems and the expertise in drilling, grouting, and tensioning said anchors. f. Experience with construction of large concrete walls including formwork, reinforcing, concrete mixing and placement in congested spaces, curing and finishing. g. Experience with coordination with PennDOT and experience in traffic control and the use of traffic control devices. Email capabilities statement to Ms. Trahon Battle, Contract Specialist at contact@example.gov and Mr. Ryan Fernandez, Contracting Officer at contact@example.gov no later than 12:00 PM Eastern Standard Time, February 16, 2023; reference Sources Sought W912DR-23-X-0TAP. Submissions will be shared with the Government project delivery team, but otherwise will be held in strict confidence. No feedback or evaluations will be provided to respondents regarding their submissions. If you have any questions, contact Ms. Trahon Battle by email.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
The Mid-Bay James Island Restoration Phase 2 is a firm fixed price construction project managed by the U.S. Army Corps of Engineers, Baltimore District. Located in Dorchester County, Maryland, this ecosystem restoration effort takes place in a remote area of the middle Chesapeake Bay accessible only by boat. The project has an estimated magnitude of construction between 150 million and 250 million dollars, with an anticipated period of performance of 1095 calendar days from the date of the Notice to Proceed. The scope of work involves three primary features: the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand; the excavation and stockpiling of approximately 650,000 cubic yards of sand from a local borrow area; and the installation of spillway structures for controlled water release. Key material requirements include various weights of armor stone ranging from 450 to 3300 pounds. The contractor is responsible for all labor, equipment, and transportation, and must maintain a Quality Control Manager on-site at all times. Administrative requirements include the submission of bids via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Award evaluations include a 10 percent price preference for HUBZone small business concerns. The contract mandates strict adherence to safety and environmental regulations, including EPA 40 CFR 112 for POL products and EM 385-1-1 for safety and health. Additionally, the contractor must conduct formal partnering sessions within 35 to 45 days of the award and provide necessary performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS