AM26-7 CHURCH HILLS WATER ENHANCEMENT PIPELINE PROJECT PHASE III 2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The State of Utah Division of Purchasing, in coordination with the Division of Wildlife Resources, is soliciting bids for the installation of 24,000 feet of 2-inch fusible pipe with a minimum SDR 11 rating and 200 PSI pressure capacity, along with the fusing of the pipeline segments during installation. The contract will be awarded to the lowest cost per foot responsive and responsible vendor, with pricing guaranteed for the entire duration of the project. There is no mandatory site visit required, and the solicitation is structured to result in a single contract award based purely on cost efficiency. The project, titled AM26-7 CHURCH HILLS WATER ENHANCEMENT PIPELINE PROJECT PHASE III 2026, is identified by solicitation number AM27-7, with bids due by August 5, 2026. All proposals must be submitted through the official Utah procurement portal, and primary point of contact for inquiries is Albert Mosley at amosley@utah.gov.
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The purpose of this IFB is to enter into a contract to provide: installation of~24,000’ (4.54 miles) of 2” fusible pipe (SDR 11 minimum of 200 PSI), along with fusing the pipeline together upon installation. . Mandatory Site Visit:NO.
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost per foot.
Vendor must guarantee its pricing for duration of the project.