This Solicitation opportunity from Utah was posted on September 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
AM27-115 Holt Canyon Water Catchment Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Holt Canyon Water Catchment Project (AM27-115) is a solicitation by the Utah Division of Wildlife Resources, in conjunction with the United States Forest Service, for the installation of one 80,000-gallon water catchment and storage facility in Washington County, Utah. The project scope includes the construction of a catchment apron measuring at least 170 by 220 feet using 45 mil HDPE membrane, a corrugated steel ring storage tank with a concrete floor and metal roofing, and associated plumbing, including a 10-inch weather-resistant inlet pipe and a 12-inch overflow pipe. All work must be completed by April 30, 2027, though the agency encourages completion before winter to maximize moisture collection. The contract will be awarded to the lowest responsive and responsible bidder on a total project cost basis, covering all labor, equipment, materials, and mobilization. The performance period runs from October 10, 2026, to April 30, 2027, and vendors must guarantee pricing for the duration of the project. Payment consists of a single lump-sum final payment following a final inspection, with invoices due within 30 days of delivery. Contractors are required to maintain workers compensation and commercial general liability insurance with limits of 1 million dollars per occurrence and 3 million dollars aggregate. Compliance with E-Verify, anti-boycott certifications, and federal and state non-discrimination laws is mandatory.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The purpose of this IFB is to enter into a contract to provide: Installation of one (1) 80,000-gallon water catchment and storage facility .
Mandatory Site Visit: NO.
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost.
Length of Contract: October 10, 2026 – April 30, 2027 .
Vendor must guarantee its pricing for the duration of the project.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
