Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Health And Human Services was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amanda Gordon Replacement OSS System

Closed
75H70126Q00022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
IFB No. 27-004 Construction Services for Golden Isles Parkway Force Main Extension
Solicitation # 27-004
The Brunswick-Glynn County Water and Sewer Commission is soliciting sealed bids for IFB No. 27-004 to provide construction services for the Golden Isles Parkway Force Main Extension in Glynn County, Georgia. The project requires the installation of approximately 2,500 linear feet of 8-inch HDPE DR11 sewer force main, including associated valves and fittings, and the abandonment of approximately 65 linear feet of 6-inch HDPE force main. The scope of work encompasses all necessary labor, materials, and equipment, including traffic control, bypass pumping, clearing, grubbing, grassing, erosion and sedimentation control, and final testing and disinfection. The contract is a fixed-firm price not-to-exceed agreement and will be awarded to the lowest responsive and responsible bidder. Bids must be submitted by 12:00 PM EST on October 13, 2026, and must include a bid guarantee of at least 5 percent of the bid amount. The successful contractor must provide performance and payment bonds for 100 percent of the total contract price. The project timeline requires substantial completion within 45 calendar days of the notice to proceed, with final completion occurring within 60 calendar days. Compliance with E-Verify, Equal Employment Opportunity laws, and the drug-free workplace certification is mandatory.
Brunswick-glynn County Joint Water & Sewer Commiss

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. The project requires comprehensive drainage, underdrain, inlet, pipe, and downspout work, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements include the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation specifically encourages participation from small business concerns, including minority, woman-owned, disadvantaged, HUBZone, and veteran-owned businesses, who may also form consortiums to handle larger bid items. Bids are due by 4:00 P.M. on September 17, 2026. Interested parties must submit a response indicating their intent to bid to the primary contact, Jonah Leith. The project falls under NAICS code 237110, focusing on professional civil engineering construction.
Harbel, Inc.

POSTED

about 15 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 15 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Amanda Gordon Replacement OSS System contract, solicited under number 75H70126Q00022, is a small business set-aside for the design and construction of an on-site sewage system at a residential site in Port Hadlock, Washington. The work involves excavation, trenching, backfilling, and installation of a low-pressure dosed gravel drainfield and pressurized chamber drainfield, including a 1000-gallon septic tank, PVC piping, lift stations, inspection ports, and associated utilities, all in strict compliance with ASTM standards, Washington Administrative Code, and Indian Health Service Technical Provisions. Performance is mandated to be completed within 30 calendar days from the Notice to Proceed, with a strict 10-day start window, and contractors must possess a valid septic installer license. The contract is awarded on a Lowest Price Technically Acceptable basis, with price being the sole discriminating factor after mandatory compliance with SF-1442 completion, accurate pricing in Section B, and submission of a current installer license. All invoices must be processed electronically through the Department of Treasury Invoice Processing Platform, and payments are remitted by the Portland Area Indian Health Service. The contract includes extensive compliance requirements tied to federal regulations and tribal governance, including Buy American provisions with Alternate I, sustainable materials under deviation, and specific obligations under Indian Preference and Native American Graves Protection and Repatriation Act provisions. Contractors must adhere to strict safety protocols, submit a formal Accident Prevention Plan, follow reservation-specific rules regarding vehicle access and speed limits, and ensure all personnel wear government-approved non-metallic ID badges. Subcontracting is tightly controlled, forbidding entities on SAM’s exclusions list and requiring specialty subcontractors to be licensed or manufacturer-supervised. Materials removed during work become the contractor’s property but cannot be stored or sold on-site, and all equipment must be clearly marked and parked in designated zones. A mandatory preconstruction conference and weekly payroll submissions using WH347 forms are required, along with final release of claims forms and as-built documentation. The estimated contract value falls between $25,000 and $100,000, with no bid, payment, or performance bonds required unless the award exceeds $35,000, and there are no option periods. All proposals must be submitted as a single PDF via email by the May 21, 2026 deadline, and no hard copies are accepted.

General Info

Government contract for Amanda Gordon OSS system replacement, small business set-aside, due May 21, 2026.

Agency

Department Of Health And Human Services → Division Of Engineering Svcs - SeattleView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Port Hadlock, WA, 98339, USA

Set-Aside

SBA

Documents

(10)

2-Aerial+View.pdf

PDF

1-Statement+of+Work.docx

DOCX

Indian+Health+Service+Buy+Indian+Act+Indian+Economic+Enterprise+Representation+Form.pdf

PDF

4-County+Approved+Septic+Design.pdf

PDF

3-Technical+Provisions.pdf

PDF

A11++Pre-Solicitation+SAM+notice+DRAFT.pdf

PDF

5-Measurement+and+Payment.docx

DOCX

A10++Sources+Sought+Template.pdf

PDF

6-US+DOL+WD+WA20260085+Dated+1-2-2026.pdf

PDF

B01++75H70126Q00022.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Health And Human Services → Division Of Engineering Svcs - Seattle
Contacts2 people available
OfficeSEATTLE, WA, 98121, USA
Organization / Agency
Department Of Health And Human Services → Division Of Engineering Svcs - Seattle
View Agency Profile
Office AddressSEATTLE, WA, 98121, USA

Full Description

Show more

Amanda Gordon Replacement OSS System

More opportunities from Department Of Health And Human Services → Division Of Engineering Svcs - Seattle

Same awarding agency

NAICS: 237110
Federal
Teresa Thurston Replacement OSS
Solicitation # 75J70126Q00033
The Department of Health and Human Services, Division of Engineering Services in Seattle, is soliciting quotes for the Teresa Thurston Replacement On-Site Septic System (OSS) project located in Lake Tapps, Washington. This firm-fixed-price construction contract is a 100% small business set-aside under NAICS 237110, with an estimated project magnitude between $25,000 and $100,000. The scope of work involves the installation of a replacement septic system, including the settling tank, pump tank, effluent pump and controls, transport line, and drainfield, as well as potential optional items for abandoning existing tanks. The project requires the contractor to be certified by Pierce County as a septic installer. The performance period requires work to commence within 10 calendar days of the notice to proceed, with full completion, including cleanup and approvals, within 30 calendar days. A project superintendent must be on-site at all times to oversee labor and safety compliance. Award will be based on the lowest total firm-fixed price and compliance with all terms and conditions. Payment will be processed electronically via the Department of Treasury Invoice Processing Platform, with final payment issued within 30 calendar days of receiving a proper invoice and a release of claims form. All work must adhere to Davis-Bacon wage determinations for residential construction in Pierce County and comply with Buy American requirements.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
Federal
J. Jenkins OSS (COW)
Solicitation # 75H70126Q00034
Solicitation 75H70126Q00034 is a firm fixed-price construction contract issued by the Department of Health and Human Services, Indian Health Service Division of Engineering Services, for the installation of a replacement individual on-site septic system in Castle Rock, Washington. The project is a total small business set-aside under NAICS 237110, with an estimated construction magnitude between 25,000 and 100,000 dollars. The scope of work includes the installation of a 1,050-gallon two-compartment concrete septic tank, 4-inch solid sewer pipe, underground cleanouts, a distribution box, and a gravity trench chamber drainfield, as well as the pumping and abandonment of the existing septic tank. The contractor is responsible for obtaining all necessary permits, including the Department of Ecology Notice of Intent, and must adhere to a 45-day period of performance following the notice to proceed. Award will be based on price and compliance with the terms and conditions of the request for quotes, with price serving as the discriminating factor. Eligible offerors must be registered in the System for Award Management and provide a completed SF1442 and price schedule by the September 21, 2026, deadline. Special preference is given to Indian Economic Enterprises under the Buy Indian Act, requiring specific self-certification and supporting documentation. The contract mandates compliance with Davis-Bacon wage determinations, OSHA trench safety regulations, and the use of domestic construction materials. Payment will be processed electronically via the Department of Treasury Invoice Processing Platform, with progress payments authorized and final payment issued within 30 calendar days of a properly executed final invoice and release of claims.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS