Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AMI/ AMR METER REPLACEMENT Project, PHASE V CITY PROJECT NO. 740-WTR

Closed
PW-NIB-740-WTRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the removal and replacement of approximately 1,659 existing water meters of various sizes, including 3/4”, 1”, 1-1/2”, 2”, and 4”, within the City of South Gate's water distribution system, specifically in Meter Cycle C-4. The project aims to upgrade these meters to advanced Automated Meter Reading (AMR) and Advanced Metering Infrastructure (AMI) systems to improve efficiency and accuracy. Optional work includes furnishing and replacing meter boxes and lids for smaller service connections, as well as repairing or replacing damaged meter box lids. Additionally, the contract covers the replacement of customer-side connectors and valves, along with up to two feet of piping, to ensure proper reconnection to existing infrastructure if necessary. The project is scheduled for bidding with a response deadline of November 20, 2025, and is managed under the City of South Gate, California, with a contract value estimated between 1.5 million and 3 million dollars. The solicitation is open to qualified contractors, with primary contact being Lorenzo Camargo, reachable via email or phone. The project emphasizes modernizing water metering systems to enhance operational efficiency and service reliability within the city's water infrastructure.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Monthly On-site Shredding Services NH26-004Open now, due in 195 days
  • Traffic Control and Lane Closure ServicesOpen now, due in 24 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of South Gate
Contacts1 person available
OfficeN/A

Full Description

Show more
The work consists of removing and replacing approximately 1,659 (3/4”,1”, 1-1/2”, 2”, and 4”) existing water meters in Meter Cycle C-4 of the City of South Gate Waterdistribution system with new Automated Meter Reading (AMR) and Advanced MeteringInfrastructure (AMI) based water meters. Meters of 4” and 6” are included as optional work.Other optional work includes furnishing and replacing meter boxes and lids for 3/4”, 1”, 1-1/2”,and 2” service connections, as well as damaged meter box lids for 3/4”, 1”, 1-1/2”, and 2” services,and Replace customer side connector and valve up to two feet of piping and reconnect to existingpiping including couplings, in case required.

More opportunities from California → City of South Gate

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS