Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

AMI Hardware Supply

Open
State & Local
Response DeadlineDue in 12 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Gridley Electric Department involves the supply of AMI hardware, specifically electric meters and communications network equipment. The contractor is responsible for manufacturing and delivering AMI-compatible meters, network collectors, and repeaters that adhere to a 15-year life requirement and a synchronization standard of plus or minus 10 seconds. Deliverables include the shipped hardware and corresponding meter attribute files. The project requires strict adherence to various security and technical standards, including NERC CIP 002-011 and 014, FIPS 140-2, NIST SP 800-53, and the ISO/IEC 27000 Series. Performance will take place in Gridley, California, under NAICS code 334418. There is no specified set-aside status for this contract.

General Info

Contract for AMI hardware supply and delivery for City of Gridley Electric Department.

Documents

This scope was carved out of 20261124047.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Advanced Metering Infrastructure (AMI)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 12 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Advanced Metering Infrastructure (AMI)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Gridley Electric Department
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies electric meters and communications network equipment for prime contractors on City of Gridley Electric Department AMI projects. Manufactures and delivers AMI-compatible electric meters, network collectors, and repeaters meeting 15-year life requirements and ± 10 second synchronization standards. Must comply with NERC CIP 002-011 & 014, FIPS 140-2, NIST SP 800-53, and ISO/IEC 27000 Series. Delivers shipped hardware and meter attribute files.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Gridley Electric Department

Same awarding agency

NAICS: 221122
New
SLED
Advanced Metering Infrastructure (AMI)
Solicitation # 20261124047
The City of Gridley Electric Department is soliciting proposals for a new Advanced Metering Infrastructure (AMI) system to serve approximately 3,050 electric meters and 2,300 water meters in Gridley, California. The selected supplier will be responsible for system design, network equipment installation, SaaS turn-up, system integration with Tyler, testing, and end-user training. Key technical requirements include AES256 encryption, support for various Home Area Network (HAN) protocols, and compliance with the UL 2735 safety standard for electric utility meters. The project involves a targeted 18-month deployment starting with a project kick-off in April 2027, featuring a phased rollout that includes an Initial System Acceptance Test (ISAT) and a Final System Acceptance Test (FSAT). The estimated total one-time cost for the project is $402,218. Proposals will be evaluated by a cross-departmental team using a weighted scoring system, with the level of perceived risk accounting for 30% of the evaluation. Suppliers must provide comprehensive documentation, including a wireless propagation study, a project schedule, and a Statement of Work. All meters must feature specific factory markings, including serial numbers, barcodes, and the NSF 61 mark. There is no specified set-aside status for this solicitation. Proposals must be submitted via email to Ryan Carlson and Rick Schmidt by the December 7, 2026, deadline.
Electric Power Distribution

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS