Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on April 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amtrak Rail Station Roof

Closed
S-73000-00016149State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 15 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract pertains to the removal and replacement of the roof membrane at the Amtrak Rail Station located in Salem, Oregon. The contractor is tasked with removing the existing worn membrane and disposing of it following industry standards, replacing any damaged or wet insulation, and installing a new membrane in accordance with manufacturer specifications to ensure waterproofing. Additionally, the existing parapet wall cap metal is to be removed carefully with the intent of reuse if possible. The project is a lump-sum firm fixed-price solicitation issued by the State of Oregon Department of Transportation (ODOT), expected to commence upon issuance of the Notice to Proceed, with substantial completion targeted by July 13, 2026, and final completion by August 5, 2026. All work is to be performed on-site at the Amtrak Rail Station, with inspections, acceptance, and final closeout managed by designated ODOT representatives. Contractual provisions are governed primarily by Oregon state-specific general conditions and supplemental conditions applicable to public improvement contracts, including required bonds such as performance and payment bonds, though no federal FAR clauses are included. The contract mandates compliance with multiple Oregon statutes and regulations regarding prevailing wages, nondiscrimination, subcontractor licensing, and sexual harassment policies. Insurance requirements specify commercial general and automobile liability coverage, including extended reporting periods and additional insured endorsements for ODOT and affiliated entities. Evaluation factors are centered on mandatory compliance with statutory and policy requirements rather than scored criteria. The project documentation includes exhibits covering bonds, general conditions, specifications, statement of work, and plans, which are submitted separately through the OregonBuys procurement portal. No pricing or cost data are provided in the solicitation materials, indicating the document is a template or draft solicitation, and proposals must be submitted electronically by May 14, 2026, to the specified point of contact at ODOT.

General Info

Roof membrane replacement at Salem Amtrak Station with reuse of parapet cap, completion by August 2026.

Agency

Oregon → Facilities

Place of Performance

Salem, OR, 97301, USA

Set-Aside

NONE

Documents

6

00016149 Exhibit 5 PVC Roofing Specifications

DOCX, High priority: read this firstspecifications
High

00016149 Exhibit 6 Statement of Work - Amtrak Train Station Roof Replacement

DOC, High priority: read this firstsow
High

Addendum 1 to ITB S-73000-00016149 Amtrak Rail Station Roof

DOCX, High priority: read this firstamendment
High

F421001 Salem Amtrak Train Station Roof Replacement Plans

PDF, High priority: read this firstplans
High

Invitation to Bid S-73000-00016149 Amtrak Rail Station Roof

DOCX, High priority: read this firstitb
High

Sample Public Improvement Contract for Amtrak Rail Station Roof PO-73000-000

DOCX, High priority: read this firstcontract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Facilities
Contacts2 people available
OfficeSalem, OR, 97301, USA
Organization / Agency
Oregon → Facilities
Office AddressSalem, OR, 97301, USA
Contacts
William DethloffPoint of Contact
David DethloffPurchaser

Interested Companies (13)

Daily Journal of Commerce
Currie Legacy Construction
C&R Homes and Construction ServicesSpokane, WA

See All 13 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Remove old worn out membrane and dispose of per industry standards. Replace any damaged or wet insulation and place new membrane material per MFG specifications and make waterproof. Remove existing parapet wall cap metal and reuse, if possible, contractor to take extra care to remove and reuse.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS