This Solicitation opportunity from Maryland was posted on February 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Anacostia II WWPS PLC Upgrades project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Washington Suburban Sanitary Commission (WSSC) is soliciting bids for upgrades to the Distributed Process Control System (DPCS) at the Anacostia #2 Wastewater Pump Station. This project, identified as the Anacostia II WWPS PLC Upgrades (Contract CP7725A24, Solicitation 98587), involves the replacement, modification, and installation of control system components, including new PLC panels, UPS systems, power panels, instrumentation, network cabling, and associated electrical and mechanical equipment. The upgrade aims to modernize infrastructure, ensure ongoing operational reliability, and integrate the station's pump controls with WSSC's current SCADA standards. The contract includes demolition, wiring, installation, and comprehensive testing activities, with emphasis on coordination among electrical, instrumentation, and control system disciplines. The work site is located in Maryland, with the WSSC Production Department managing procurement and contract administration. The contract is structured as an Invitation for Bid with a contract term of three years and an estimated value up to $2.5 million. Minority and small local business engagement is encouraged, with a subcontracting goal of 15% recommended. Contractors must comply with Maryland prevailing wage laws, including posting requirements, apprenticeship ratios, and wage reporting. The bid includes lump sum pricing items, contingent unit price items such as drop ceiling modifications, and a $100,000 contingency allowance subject to engineer authorization. Detailed bid plans and specifications are provided, including professionally certified electrical schematics and installation guidelines. Installation of acoustical tile ceilings is also specified in accordance with ASTM standards as part of the project scope where applicable. The solicitation sets firm deadlines for site visits, question submissions, and proposals, requires vendor registration in the WSSC Supplier Portal, and specifies administrative and technical points of contact. The award decision is principally cost-based, with no formally published evaluation factors beyond the total base bid amount, and no specific FAR clauses or federal acquisition data are included in the documents provided.
General Info
Place of Performance
MD, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (14)
See All 14 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
