Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Annexation 709 – White Lane No. 9

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Bakersfield

Place of Performance

White Lane and South Union Avenue, Bakersfield, CA, 93307

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Bakersfield
Office AddressN/A
Contacts
Yazid AlawgareyAssistant Planner

Full Description

Show more
A Sewer Connection Feasibility Study entitled “Andrea Avenue – Unincorporated Area” was prepared by AM Consulting Engineers in February 2020 to address the needed improvements. Please refer to that document in Appendix A for specific project characteristics. A summary of Project activities is included herein. The proposed Project consists of connecting to the City of Bakersfield sewer system and annexing the Project Area to the City of Bakersfield. The Project Area is an unincorporated island surrounded by the City of Bakersfield. The City of Bakersfield collection system is very close to the Project Area and offers several potential connection points to convey sewer from the project area. Sewer that enters the City’s sewer collection system from the Project Area would flow to Wastewater Treatment Plant No. 2 located at 1700 E. Planz Road.This Project will involve the following components: 1.Installing approximately 620 feet of 4-inch service connection to houses and properties. 2.Installing approximately 440 feet of 6-inch PVC main. 3.Installing approximately 8250 feet of 8-inch PVC main. 4.Installing approximately 3490 feet of 10-inch PVC main. 5.Conducting approximately 26,900 square feet of trenching and surface restoration. 6.Installing approximately 35 4-inch-diameter manholes. 7.Installing sewer system connections at 279 residential dwellings, 236 commercial units,and 126 industrial units.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS