Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Minnesota was posted on May 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Apache Tower #87 Rehabilitation

Closed
2026-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Apache Tower #87 Rehabilitation contract involves comprehensive blasting and repainting of the interior wet, interior dry, and exterior surfaces of a 500,000-gallon spheroid water storage tank located in Minnesota. Work must be conducted between the notice to proceed date and significantly completed by October 15, 2026, with all activities governed by detailed project specifications and documented site conditions. The scope includes abrasive blasting, surface preparation, coating application using approved materials, installation of impervious ground containment, environmental compliance, and post-coating disinfection verified through bacterial testing per AWWA C652. Coatings must meet strict performance standards including a surface profile of 2.5–3.0 mil, passing NACE SP0188 holiday testing, and adhering to SSPC-PA1 and AWWA D102 guidelines. All materials must be delivered in original sealed containers, stored indoors under controlled conditions, and properly labeled with manufacturer data; expired or improperly handled materials must be removed immediately. Labor rates are determined by wage determinations for crafts such as painters, bricklayers, and carpenters with effective dates extending into 2026, and all work must comply with federal and state regulations including 40 CFR 50, 29 CFR 1926.62 and 1025 for lead exposure, and Minnesota Chapter 7011 for fugitive particulate control. Performance is site-specific with inspections conducted throughout the process by the Engineer and contractor, requiring 48-hour advance notice for all inspections and daily logging of environmental conditions, surface temperatures, dew points, and coating batch numbers. The contractor assumes full responsibility for site conditions, must obtain prior approval for all subcontractors, and is required to ensure all personnel wear visible photo identification and pass a personnel risk assessment including background verification. While no formal contract value is provided due to missing unit pricing, the solicitation allows for alternate bid items including full steel plate upper landing, LED light fixtures, and a tank mixer/SCADA panel, with awards based on lowest responsive and responsible bidder considerations alongside best value factors such as safety record, bonding capacity, financial resources, past performance, and availability of skilled labor. No specific payment office, COR/COTR contact details, or accounting codes are listed, and the contract relies on electronic submission through PublicPurchase.com by the June 10, 2026 deadline, with all proposals requiring adherence to format,

General Info

Apache Tower #87 Rehabilitation: blasting, repainting 500,000-gallon tower, completion by October 15, 2026.

Documents

12

Apache Tower 87 Rehab - Bid Form Supplement

XLSX, High priority: read this firstbid-form-supplement
High

Apache Tower 87 Rehab Elevated Water Storage Tank Rehabilitation Specifications

PDF, High priority: read this firstspecifications
High

Apache Tower 87 Rehab - General Terms and Conditions

PDF, High priority: read this firstgeneral-terms-and-conditions
High

Apache Tower 87 Rehab Proposal Form

DOCX, High priority: read this firstproposal-form
High

Apache Tower 87 Rehab - Water Tower Repainting Specification

PDF, High priority: read this firstspecifications
High

Authorization of Signature Documents

PDF, High priority: read this first4 pages · authorization-of-signature
High

COR-6 Contractor's Prevailing Wage Statement of Compliance

DOCX, High priority: read this firststatement-of-compliance
High

Exhibit B Responsible Contractor Bidder's Certification for RPU Apache Tower #87 Rehabilitation

DOCX, High priority: read this firstresponsible-contractor-certificate
High

Exhibit C - Prevailing Wage Rates Commercial - Olmsted County 55 Effective 12.22.2025

PDF, High priority: read this first9 pages · wage-determination
High

RFB 2026-06 Apache Tower #87 Rehabilitation Instructions to Bidders

PDF, High priority: read this firstrfb
High

RPU - 33 01 10 Water Storage Tank Disinfection Specifications

PDF, High priority: read this firstspecifications
High

COR 1 Workforce Participation Plan

XLSX, Low priority2 pages · workforce-participation-plan
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota → Rochester Public Utilities
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The tower rehabilitation work generally involves blasting and repainting of the interior wet, interior dry, and exterior portions of the 500,000 spheroid. Work is described in the Project Specifications and existing conditions are documented in the Photo Report. Awarded work is expected to be conducted between the notice to proceed date and significantly completed by October 15, 2026.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS