Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 24, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Architect-Engineer (A/E) services for Construct Forward Area Refueling Point (FARP), Bldg 685

Awarded
FA441821B685FARPFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 14 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The 628th Contracting Squadron is seeking an Architect-Engineer firm to provide professional services for the construction of a Forward Area Refueling Point (FARP), Building 685, at Joint Base Charleston in North Charleston, South Carolina. The project involves the demolition of an existing 600 square foot facility and the design of a new 3,376 square foot single-story, sprinkler-equipped masonry building. The scope of work includes site evaluation, conceptual schemes, and the delivery of detailed drawings and specifications across two phases, ensuring compliance with DoD Unified Facilities Criteria and Antiterrorism Force Protection requirements. This is a total small business set-aside under NAICS 541330. Selection is based on the Brooks Act, prioritizing technical competence, specialized experience with masonry facilities, and past performance with the Department of Defense. Interested firms must be located within 250 miles of Joint Base Charleston. Submissions require an SF 330 with a 75-page limit, a cover letter identifying size status, and a maximum of five relevant projects completed since 2016. The most qualified firm will be selected to negotiate a single composite labor rate for the contract.

General Info

Contract Value

$152,668.59

NAICS

541330 - Engineering Services

Place of Performance

Charleston AFB, SC, 29404, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4418 628 Cons Pk
Contacts2 people available
OfficeJOINT BASE CHARLESTON, SC, 29404-5021, USA
Office AddressJOINT BASE CHARLESTON, SC, 29404-5021, USA

Full Description

Show more
SYNOPSIS For ARCHITECT-ENGINEER (A-E) SERVICES FOR CONSTRUCTION OF FORWARD AREA REFUELING POINT (FARP), B685 A. GENERAL INFORMATION. The 628th Contracting Squadron (CONS) desires to contract with an Architect-Engineer (A/E) firm in support of the Joint Base Charleston Design and Construction mission. We anticipate awarding an Architect-Engineer (A-E) contract for primary Architect-Engineer Services that will include constructing a 3,376 SF single story sprinkler equipped facility and demolition of the current 600 SF facility at Joint Base Charleston - Air Base (JBC-AB) located in North Charleston, SC. The contract awarded under this announcement is subject to an Organizational Conflict of Interest (OCI) Clause in accordance with 5352.209-9000. Concerns may be submitted directly to the Contract Specialist, Sheila Vickers, via email at sheila.vickers@us.af.mil and/or Contracting Officer, Michael Mesko at michael.mesko@us.af.mil prior to SF330 due date. General Submission Requirements: A cover letter must be submitted to accompany the SF330 that clearly identifies the Offeror�s size status (for NAICS 541330 with a size standard of $16.5M). A maximum of five (5) projects for the proposed team (including joint ventures and teaming partners) may be provided in section F. A �project� is defined as work performed at one site or a single installation. An Indefinite Delivery Contract (IDC) will not be considered a �project� for the purposes of evaluation. If the offeror provides a specific task order as a project, it should provide the base contract number and the task order number for reference purposes. If the offeror provides a site-specific contract as a project, it should provide the contract number for reference purposes. Project descriptions shall clearly define the extent of work completed, the extent of work performed by the team (i.e. disciplines and scope), extent of design completed by the proposed team (i.e. preparation of design-build package; 100% design; report, etc.), and dates of completion for design and construction. Clearly cite whether the experience is that of the prime (or joint venture), consultant or an individual for each project in Section F. Work cited that is experience of the prime (or joint venture) from an office other than that identified in Section C should be so labeled. Designs or studies completed before 2016 will not be considered. Projects for which designs or studies are not complete may be given lesser consideration than completed efforts. The SF 330 should have a total page limitation of 75 pages with Section H limited to twenty (20) pages. Each project in Section F is limited to two (2) pages; Part II is excluded from the 75 printed page limit. Double-sided sheets will count as two (2) pages. Page sheets of 11 inches X 17 inches will be counted as a single page. Tabs do not count against the page count limit, but information contained on divider tabs will not be evaluated. For all SF 330 sections, use no smaller than 11-point font. Questions regarding this Synopsis must be submitted via email to the Contracting Officer and Contract Specialist no later than 2:00 p.m., Eastern Standard Time (EST) on 3 Sep 21. Offerors shall submit electronic SF 330s to the Contracting Office no later than 4:00 p.m., Eastern Standard Time (EST) on 7 Sep 21. The Contracting Office will accept submissions via e-mail or DOD SAFE at https://safe.apps.mil. The method of submission will depend on the file size. In order to facilitate the sending and receiving of submissions via DoD Safe, offerors must first contact the Contract Specialist/Contracting Officer via email to request a DoD SAFE Drop-off. Once your email address is confirmed you will receive an email request to Drop-Off your files. Contractors are cautioned to request a DOD SAFE drop off password well in advance. The Government will not be responsible for interruptions in communications which cause delays. Late proposals will be processed in accordance with the provisions of FAR 52.215-1(c)(3), "Submission, modification, revision, and withdrawal of proposals." Contracting Officer: michael.mesko@us.af.mil Contract Specialist: sheila.vickers@us.af.mil LATE SUBMISSION OF SF-330s WILL NOT BE ACCEPTED. Personal visits and/or requests for discussion regarding this announcement WILL NOT BE ENTERTAINED. TEAMING PARTNERS: The prime firm shall provide a statement in the cover letter confirming executed teaming agreements are in place for all team members as part of the SF-330 submittal. The statement shall also list all team members. Contractor teaming arrangements are defined as a partnership or an agreement for a specific Government opportunity between a potential prime contractor and one or more companies that are potential subcontractors. Additionally, the firm selected as the most highly qualified for this A-E contract and issued a Request for Proposal will be required to submit and negotiate one composite labor rate per labor category/discipline, to be incorporated into the contract. Teaming partner rates will not be negotiated separately. AWARD PROCEDURES: This contract will be procured in accordance with the Selection of Architect-Engineers Act (40 U.S.C Sections 1101-1104, previously known as the �Brooks Act'), as implemented by FAR 36.6. A firm will be selected for negotiation based on demonstrated competence and qualifications for the required work, in accordance with the selection criteria identified below. The North American Industrial Classification System (NAICS) code is 541330, which has a size standard of $16,500,000. To receive award, contractors must be registered in the System for Award Management (SAM). Register via the SAM website at http://www.sam.gov. The firm selected as the most highly qualified will be issued an individual Request for Proposal to negotiate labor rates. INTERVIEWS: The evaluation board may conduct an interview with the highly qualified firm (by phone, in person, or in writing) during the final selection process. RFPs: The firm which is determined to be the most highly qualified will be issued a Request for Proposal (RFP) to submit composite labor rates covering a variety of engineering and engineering support labor categories. Only one set of composite rates per labor category will be negotiated. Most labor categories will include junior, mid-level, and senior rates. Separate rates for specific teaming or joint venture partners will not be negotiated. The firm selected as the most highly qualified, will be required to provide applicable teaming and/or JV agreements with their response to the RFP. QUESTIONS: A pre-proposal (pre-SF330 submission) conference will not be held. Questions and Government responses will be attached as a separate document. If applicable, responses will be incorporated into this Synopsis. B. DESCRIPTION OF WORK. This contract will support the award of Architect-Engineer (A-E) services specifically associated with constructing a 3,376 SF single story sprinkler-equipped facility consisting of concrete foundation, concrete floor slab, masonry-type exterior and sloped standing seam metal roof, including utilities: General Scope: Architect-Engineer (A/E) services are required to provide complete, detailed drawings, specifications, and cost estimates for �Project DKFX 1079989, CONSTRUCT FORWARD AREA REFUELING POINT (FARP), BLDG 685� at Joint Base Charleston - Air Base, South Carolina. The A/E design shall include but shall not be limited to the following major items of work, which are listed below in order to determine the general scope of the work involved. It shall be the responsibility of the A/E to visit the site to determine the actual amount of work and field conditions that will affect the finished product. The intent of this task order is to construct a 3,376 SF single story sprinkler equipped facility consisting of concrete foundation, concrete floor slab, masonry-type exterior and sloped standing seam metal roof, including utilities. Program includes the following rooms: maintenance space, custodian, office, storage, electrical, telecom, supply, toilet and locker room. Refer to attached FARP facility plans at Cannon Air Force Base for design precedent. The building will provide support to Air Mobility Command�s sole Air Force Special Operations Command (AFSOC) Forwarding Area Refueling Point personnel and equipment. Project will include demolition of the current 600 SF facility but shall remain operational during construction. In addition, facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01. General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01. All applicable land disturbance regulations (SWPPP, DHEC, etc.) are required. The new facility shall be in compliance with the Architectural Compatibility Plan. The project includes all necessary and required utilities, such as mechanical and electrical, and AT/FP measures. The design shall include but not be limited to: Site Evaluation. Investigate the site in sufficient detail to ensure that all major site parameters have been identified including soil conditions, environmental issues, and constraints and proximity to utilities and access roads. The A/E shall evaluate and program elements such as adjacency and traffic control. User Functional Requirements. The A/E shall identify, confirm, or validate User requirements to ensure all requirements have been identified and all viable options for satisfying those requirements have been sufficiently evaluated. Document all correspondence and record all meetings and include these in the final design report(s). Initial Concept Schemes. Provide one conceptual scheme (general site and floor plans, elevations and perspective) for Government review. Project Requirements and Parameters. Establish project parameters such as project and facility footprints, roof shape and construction, exterior finish materials and other parameters that shall impact construction costs. Seismic Zone and Soil Conditions. Evaluate seismic and soil conditions to establish foundation and structural system parameters. Utilities Requirements. Evaluate utility requirements including heating and cooling sources, estimate electrical loads, and water, etc. to establish utility parameters. Supporting Facility Requirements. Identify and quantify all facilities and requirements that are/or may not be included in the project unit costs. Interior finishes. Define parameters for interior finish materials and quality levels. The A/E shall perform all Architectural and Engineering services necessary for the preparation of construction contract plans and specifications (using English measurements), including supporting design analyses, construction cost estimates, etc. The work includes, but is not specifically limited to, studies, investigation, and design of supporting utilities and/or facilities, such as water supply, HVAC, electric service, exterior and/or security lighting, storm drainage, communications and information systems and general site improvements. DESIGN DEVELOPMENT PHASES: The work shall be accomplished in two phases: Phase I shall include Site Investigation, Asbestos and LBP Surveys, Cost Studies, and Conceptual scheme; Phase II shall include 35%, 65%, 95% and 100% submissions. The project must be accomplished within the Construction Cost Limitation (CCL) indicated in the design work order. If the cost estimate, at any time, exceeds this amount, the A/E shall provide recommendations to reduce the project cost to within the CCL. Definitions: The following definitions are provided to aid in the preparation of the SF 330: "Relevant Project" is defined as Title I services specifically associated with constructing a single-story, masonry-type facility. �Title I Services� include services related to a specific construction project and consist of conducting field surveys and investigations to obtain design data and preparing contract plans, specifications, cost estimates, and estimated construction periods of performance. Title I services may include all aspects of design such as preparation and/or review of contract plans, specifications, design analyses, calculations, scheduling, cost estimates, Building Information Modeling (BIM), design-build conceptual designs, interior design for furniture and equipment, energy modeling and Life Cycle Cost Analyses, seismic retrofit design, building commissioning services and preparation of operating and design manuals. Title I efforts also encompass Other A-E services required to support and develop design work, including planning and programming, seismic assessments, program management, project scoping, studies, investigations, evaluations, consultations, interior facility functional/relational offices compatibility studies, value engineering, topographic survey services, geotechnical services, and hazardous materials assessments. "Completed projects" are defined as those in which the firm's performance of the task for which it was hired were completed within the past five (5) years or is 80 percent complete for Title I services specifically associated with constructing a single-story, masonry-type facility. Do not list an IDIQ contract as an example of a �completed project�. Instead, list the relevant completed task order(s) or single/standalone contract. C. SELECTION CRITERIA. SF 330s will be evaluated to determine the most highly qualified firm. Evaluating Past Performance may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member actually performing the work under this contract. Projects not performed by the office/branch/individual team member will be excluded from evaluation consideration. The selection criteria are listed below in descending order of importance. Selection Criteria 5 will be evaluated on an acceptable/unacceptable basis. PROFESSIONAL QUALIFICATIONS: (a) Technical competence of individual design team members to design similar repair, alteration, and new construction projects. (b) Knowledge of multi-discipline design projects through recent design experience. (c) Knowledge of Department of Defense design criteria through recent design experience, with knowledge of Air Force design criteria being preferred. (d) Professional registration of each discipline's lead engineer. It is preferred that key personnel hold current professional registration in South Carolina. (e) Knowledge and application of the minimum DOD Antiterrorism Standards for Buildings. (f) Knowledge and application of sustainable design principles, including prescribing the use of recovered materials and achieving waste reduction and energy efficiency in site, facility, and landscape design. It is preferred that key personnel hold current LEED certification. SPECIALIZED EXPERIENCE (a) Recent multi-discipline experience of the proposed design team, including consultants, in designing repair, alteration and new construction projects to Department of Defense criteria. (b) Experience must include design of constructing a single-story, masonry-type facility, in-depth knowledge of Unified Facility Guide Specifications for masonry construction, knowledge of Unified Facilities Criteria (UFC) 1-200-01. General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 PERFORMANCE (a) Recent past performance on contracts with DOD and private industry with respect to cost control, management, regulatory compliance, complexity/quality of work and compliance with performance schedules. Recent past performance on DOD contracts is preferred to private industry. (b) Incorporation and use of design Quality Control/Quality Assurance processes to assure fully coordinated, technically accurate plans, specifications, cost estimates and RFP documents. LOCATION (a) Knowledge of probable site conditions and local requirements that can affect projects. (b) Knowledge of the local permitting processes and the ability to obtain required permits. (c) Geographic location of key personnel to ensure timely response to requests for on-site support. (d) Interested firms must be located within 250 miles driving distance of Joint Base Charleston, SC. VOLUME OF DOD WORK (a) Firms will be evaluated on the volume of work previously awarded to the firm by DOD within the past 12 months with the objective of effecting an equitable distribution of contracts among qualified AE firms. D. OTHER. Ombudsman: An Ombudsman has been appointed to hear concerns from potential firms during the submittal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the Contracting Officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate Government personnel. When requested, the Ombudsman will maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of AE submittals or elsewhere in the acquisition process. Interested parties are invited to contact the appointed Agency Ombudsman: Mrs. Susan Madison AFICC OL AMC 510 POW/MIA Scott AFB, IL 62225-5022 Phone: (618) 229-0267 Fax: (618) 256-5724 Email: susan.madison@us.af.mil

More opportunities from Department Of Defense → FA4418 628 Cons Pk

Same awarding agency

NAICS: 236220
New
Federal
Facility Enhancement and Maintenance IDIQ
Solicitation # FA441827R0001
Solicitation FA441827R0001 is a multi-year, Firm Fixed-Price, Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for Facility Enhancement and Maintenance services at Joint Base Lindsey Graham, South Carolina. This small business set-aside requirement covers three primary service areas: floor covering removal and replacement, application of protective coatings including painting and water blasting, and miscellaneous like-in-kind repairs to mechanical, electrical, and plumbing systems. The contract structure includes a base ordering period from December 15, 2026, to December 14, 2027, with four subsequent option years and a final six-month extension. Work is performed via individual task orders, and the government intends to award a target of two contracts while establishing an on-ramp pool of up to three additional offerors. The award will be based on a competitive best-value source selection where past performance is considered significantly more important than price. Proposals must be submitted electronically via DOD SAFE by November 5, 2026, and must include a price proposal and past performance information. Technical requirements mandate a Quality Control Manager with at least five years of experience and adherence to Unified Facilities Criteria for protective coatings. Contractors are responsible for providing all labor, materials, and equipment, and must comply with specific security requirements for base access and cybersecurity standards under DFARS 252.204-7012. Invoicing is processed through the Wide Area WorkFlow system, and all work carries a minimum one-year warranty.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
Federal
JB Charleston Multiple Award Construction Contract
Solicitation # FA441826R0009
The JB Charleston Multiple Award Construction Contract (MACC) 2.0 is a competitive solicitation (FA441826R0009) set aside for HUBZone and Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The contract establishes a vehicle for new construction, alteration, repair, and demolition services, as well as design-build capabilities, across various locations including the Air Base, Weapons Station, and other associated sites. The overall contract capacity is 400 million dollars over a period of performance spanning five years and six months, with individual task orders generally valued between 1 million and 30 million dollars. Award decisions are based on a best value tradeoff technique, where past performance is weighted significantly more than price. The evaluation process utilizes a seed project, specifically the repair of Dormitory B.464, to determine pricing. The seed project involves comprehensive renovations and seismic upgrades, including HVAC, plumbing, and electrical improvements. Proposals must be submitted electronically via DoD SAFE, and the current deadline has been extended to October 28, 2026, at 12:00 PM EDT. Contractors are required to adhere to strict quality control and safety standards, including compliance with USACE EM 385-1-1 and the Davis-Bacon Act. Key administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing and the submission of performance and payment bonds for each task order. The contract also includes on-ramp and off-ramp procedures to manage contractor performance and maintain competition throughout the contract lifecycle.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS