Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Arlington CDBG Project Water Meters Replacements

Closed
PE-66925-NONST-2026-000000003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

General Info

Documents

5

Addendum No. 002 - CDBG Project No. 24p-x-019-2-6372

PDF, High priority: read this firstamendment
High

Build America, Buy America (BABA) Requirements for CDBG Infrastructure Projects

PDF, High priority: read this first2 pages · special-notice
High

City of Arlington CDBG Project 24p-x-019-2-6372 Addendum No. 001

PDF, High priority: read this firstamendment
High

City of Arlington - Water Meter Replacement (CDBG No. 24p-x-019-2-6372)

PDF, High priority: read this firstifb
High

Invitation to Bid for Water Meter Replacement in Arlington, GA

PDF, High priority: read this first1 page · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66925 ARLINGTON, PE-66925-NONST-2026-000000003 to PE-66925-NONST-2026-000000003.

Deadline changed

Response deadline changed from Nov 6, 2025 to Oct 23, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Arlington
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Arlington
Office AddressN/A

Full Description

Show more
The City of Arlington, Georgia will accept sealed bids on the work below at Jimmie C. Harpe Community Center, 31 Martin Luther King Drive, Arlington, Georgia 39813 until 2:00 p.m. local time, October 23, 2025 at which time and place all bids will be publicly opened and read aloud. Project Title: Water Meter Replacement CDBG No. 24p-x-019-2-6372 CITY OF ARLINGTON ARLINGTON, CALHOUN AND EARLY COUNTY, GEORGIA The project consists of: Replacement of approximately 512 - ¾¿ water meters, 4 - 1¿ water meters, 17 ¿ 2¿ water meters, 3 ¿ 2 1/2¿ water meters and 1 - 4¿ water meters with remote read water meters and system for operation. The specifications and other contract documents may be examined at: SOWEGA Engineering, LLC 158 East Lee Street Dawson, Georgia 39842 Copies may be obtained at the office of SOWEGA Engineering, LLC, P.O. Box 735, Dawson, Georgia 39842, upon payment of $250.00 for each set. No refunds will be made. The Owner reserves the rights to waive any and all informalities, to reject any and all bids, and to disregard all nonconforming, nonresponsive, unbalanced or conditioned bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. All bids will remain subject to acceptance for 60 days after the actual date of the opening thereof. City of Arlington 567 Pioneer Road N. E. Arlington, Georgia 39813

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS