Arroyo Simi Bridge Scour Mitigation Project (Streambed Alteration Agreement, No. EPIMS-VEN-33011-R5)
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
NAICS
N/A
Place of Performance
Moorpark, CASet-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A
Contacts
Full Description
Show more
The California Department of Fish and Wildlife has executed Streambed Alteration Agreement No. EPIMS-VEN-33011-R5, pursuant to Section 1602 of the Fish and Game Code to the Southern California Regional Rail Authority, as represented by Aaron Azevedo.
The whole of the Arroyo Simi Four Bridges Scour Mitigation Project involves the installation of scour countermeasures at four railroad bridges that pass over Arroyo Simi Creek. Scour countermeasures for each bridge include the following, removal and in-kind replacement with rock slope protection and extension of riprap at the bridge abutments; extension of concrete casings around existing steel piles at each pier; installation of filter fabric at the bottom of the channel below riprap apron; backfill of native soil over riprap; and restoration of impacted areas upon completion of construction. The existing single-track configuration at each bridge location would remain upon implementation of the proposed scour countermeasures. Prior to construction, the proposed access road will be graded, vegetation within the project area will be removed, and any remnant concrete collars, piles, caps, footings, and existing rock slope protection will be removed. The project will utilize equipment such as excavators, loaders, haul trucks, water trucks, concrete pumper trucks, chainsaws, generators and pumps, and a backhoe with a hydraulic hammer. A water diversion will be needed to complete the proposed work.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS