This Solicitation opportunity from Government of Canada was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Arts, Culture and Status of Women - Request for Proposal - Reynolds Museum - Concrete Floor in Storage Building

Closed
AB-2026-03516Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the engineering and construction of a 60 by 180 foot concrete floor slab within an existing storage building, alongside a 18 by 20 foot concrete driveway approach pad outside the front overhead door. All organic material must be removed from the slab area, followed by the placement of a minimum six-inch compacted crushed stone aggregate subbase of ¾-inch minus material, which the contractor is fully responsible for grading and installing. A six-mil polyethylene vapor barrier is to be laid over the subbase, with all seams and penetrations overlapped by at least eight inches and sealed with Tuck Tape or an equivalent product. The concrete slab itself must be a minimum of six inches thick, made with a 32 MPa mix, classified as C-2 exposure, containing 5 to 8 percent air entrainment, and incorporating fiber reinforcement to mitigate shrinkage cracking. The aggregate size is specified at ¾ inch, with #4 rebar placed on 16 to 18 inch centers and covered by at least two inches of concrete above the top of the bars. The finish requires power troweling on the primary area and a light broom finish at all man door entrances, while control joints must be cut to a depth of 1.5 to 2 inches. The contractor must supply their own portable generator and lighting due to the lack of available electrical power and interior lighting on site. All necessary permits are the contractor’s responsibility, and the concrete supplier must be a Certified Production Facility through Concrete Alberta. An engineering report for the floor design must also be submitted prior to construction.

General Info

Construct 60x180 ft concrete slab and 18x20 ft driveway with 6-inch subbase, vapor barrier, 32 MPa fiber-reinforced concrete, rebar, and proper finishes.

Agency

Government of Canada → Arts, Culture and Status of WomenView Agency

NAICS

238110 - Poured Concrete Foundation and Structure Contractors View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Arts, Culture and Status of Women
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Arts, Culture and Status of Women
View Agency Profile
Office AddressN/A
Contacts
Brian ManningContracting Authority

Full Description

Show more
Engineering and construction of a 60 x 180 ft (18.28 x 54.86M) concrete floor slab for an existing storage building with a concrete driveway approach pad outside of the existing front building overhead door 18 x 20 ft (5.48 x 6.1m) • Subgrade preparation requires all organic material to be removed from slab area. • Minimum of 6” (15.25 cm) of compacted ¾” (20mm) minus crushed stone aggregate subbase. • Contractor will be responsible for all sub-base grading and aggregate placement. • Layer of minimum 6 mil poly barrier over prepared compacted gravel base. • All poly seams and penetrations overlapped a minimum of 8” (20cm) with the joints sealed with Tuck Tape or comparable product. • A minimum of 6” (15.25 cm) concrete slab thickness. • Minimum 32 mPa concrete mix. • C-2 exposure class concrete, 5-8% air entrapment. • Fiber reinforcement added to concrete to control shrinkage. • Concrete mix of ¾” (20mm) aggregate size. • #4 rebar spaced at 16”-18” (40-45cm) on center spacing. • A minimum of 2” (5cm) of concrete coverage over top of rebar. • Power trowel finish on the main floor area with a light broom finish at man door entrances. • Control cuts in floor slab must be 1.5” – 2” (3.8-5 cm) deep. • As there is no electrical power close to the work site, the contractor will need to supply their own portable generator if required. • There are no lights inside of the structure, the contractor will need to supply their own lights if required. • Contractor is responsible for obtaining all necessary permits (if required). • Contractor’s preferred concrete supplier must be a Certified Production Facility through Concrete Alberta. • Engineering report for the floor must be provided.