Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Virginia was posted on October 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

As-Built Surveying and Documentation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Town of Blacksburg in Virginia is seeking a subcontractor for an As-Built Surveying and Documentation project. The primary objective of this contract is to conduct professional as-built surveying of installed manholes and sewer lines to ensure all infrastructure is accurately mapped. The selected contractor will be responsible for delivering precise, CAD-compatible drawings necessary for final project acceptance. Interested parties must submit their responses by the deadline of November 14, 2024, under NAICS code 541370.

General Info

Blacksburg seeks a subcontractor for sewer as-built surveying and CAD documentation by November 14.

Documents

This scope was carved out of IFB 1187-24.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

IFB 1187-24 Lucas Drive Sanitary Sewer Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Professional Land SurveyorOpen now, due in 17 days
  • Subsurface Utility Locating ServicesOpen now, due in 16 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Town of Blacksburg
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia → Town of Blacksburg
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct as-built surveying of installed sewer lines and manholes; deliver accurate CAD-compatible drawings for final acceptance.

More opportunities from Virginia → Town of Blacksburg

Same awarding agency

NAICS: 237110
SLED
IFB 1231-26 Northside Park Pump Station Force Main Relocation
Solicitation # 1231-26
The Town of Blacksburg, Virginia, is soliciting bids for the Northside Park Pump Station Force Main Relocation (Project No. C80093), a stipulated price construction contract. The project aims to increase the pump station capacity from 195 gpm to 490 gpm through the installation of 4,706 linear feet of 8-inch PVC and HDPE force main, 382 linear feet of 8-inch PVC gravity sewer, and 114 linear feet of 8-inch ductile iron gravity sewer. Additional work includes replacing 482 linear feet of gravity sewer via pipe bursting, installing four new manholes, and constructing three combination air/vacuum relief vaults. Bids are due by November 17, 2026, at 1:00 PM, and will be awarded to the apparent low bidder based on the total of estimated quantities and unit prices. The project is funded solely by Town funds, meaning there are no Buy American or MBE/WBE participation requirements, and the work is exempt from retail sales and use taxes. Performance is expected to be substantially complete within 335 days, with a specific requirement for partial substantial completion of Station 10+00 to 26+40 within 120 days. The contractor must provide a 5% bid bond, as well as performance and payment bonds upon agreement. Work must comply with the Town of Blacksburg Sanitary Sewer System Standards, Virginia Erosion and Sediment Control Law, and OSHA regulations. Payment will be made via monthly progress applications, with final payment issued within 30 days of the final application's receipt from the Engineer.
Water and Sewer Line and Related Structures Construction

POSTED

12 days ago

DEADLINE

in about 6 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS