Atkinson Lane Integrated Flood Management and Watershed Restoration Project - Phase II – Stormwater BMP Bioswale and Wetland Enhancement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Watsonville is implementing Phase II of the Atkinson Lane Integrated Flood Management and Watershed Restoration Project, focusing on the construction of a vegetated bioswale and wetland retention basin. This initiative aims to enhance water quality within the Atkinson Wetland Complex through stormwater capture and infiltration, while simultaneously reducing flood risk by improving the complex's ability to attenuate floods. The project involves grading, the installation of erosion control, and the integration of the bioswale into the city's existing storm drain system via an 18 inch pipe. To ensure ecological integrity, the project includes revegetation with native wetland and riparian plants and the restoration of all temporarily impacted areas. The project is funded by a 545,000 dollar grant from the Regional Water Management Foundation and is targeted for construction in the summer of 2027. It is being executed in collaboration with Phase I Habitat Enhancement and operates under a Categorical Exemption for small habitat restoration projects. To protect native wildlife and their habitats, the city will implement strict protective measures, including worker training, pre-work surveys, and daily monitoring. Primary coordination is managed by the CDD Director for the City of Watsonville and the Senior Conservation Project Manager from Watsonville Wetlands Watch.

General Info

Watsonville's 545,000 dollar flood management project builds a bioswale and wetland by 2027.

Agency

California → City of Watsonville

Place of Performance

Atkinson Lane and Freedom Boulevard, Watsonville, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Watsonville
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Watsonville
Office AddressN/A
Contacts
Juliette RobinsonSenior Conservation Project Manager

Full Description

Show more
The proposed project includes construction of a vegetated bioswale and wetland retention basin and revegetation with native plants. The bioswale has been designed to improve water quality within the existing Atkinson Wetland Complex through stormwater capture and infiltration while also providing flood-risk reduction by enhancing the ability of the wetland complex to attenuate floods. The bioswale will tie into the City’s storm drain system at the outfall of an existing 18” storm drain pipe. Work will involve grading to create the new swale and retention basin, revegetation with native wetland and riparian plants, and installation of erosion control. Phase II construction will be implemented in collaboration with the Phase I Habitat Enhancement. All temporarily impacted areas will be restored with native plants upon project completion. Protective measures including worker training, surveys prior to work commencement, and daily monitoring will be implemented to ensure that project activities will not result in adverse impacts on any native wildlife species or their habitats.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and utilizes EJCDC standard forms for its contracting requirements. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a bid bond, evidence of authority to do business in North Carolina, and documentation of good faith efforts to meet MBE and WBE participation goals, which are set at 10 percent combined for the state and approximately 10.9 percent for MBE and 10.4 percent for WBE per EPA goals. Performance and payment bonds, as well as proof of insurance, are required. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Technical requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additional tasks encompass electrical and instrumentation upgrades, rehabilitation of reactor mixers and aerators, motor control center component replacement, sluice and slide gate modifications, and general excavation and surveying. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities, with a specific emphasis on DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and trucking, are due by November 17, 2026, with the final bid date set for November 18, 2026. Any exceptions to standard subcontract forms must be submitted as redlines alongside the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS