Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 15, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Automatic Switching Unit Replacement Program (ASU-R)

Closed
AFNWCFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 15 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 15 hours ago

DEADLINE

in about 1 month

General Info

NAICS

541330 - Engineering Services

Place of Performance

UT

Set-Aside

NONE

Documents

1

ASU-R+Draft+SOW.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8214 Afnwc Pzbb
Contacts2 people available
OfficeHILL AFB, UT, 84056-5837, USA
Office AddressHILL AFB, UT, 84056-5837, USA

Full Description

Show more
NOTICE: This is not a solicitation but rather a Sources Sought to determine potential sources for information and planning purposes only. The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, to assist in determining if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Classification Systems (NAICS) Code is 541330. As applicable, the contractor shall ensure that all applicable Commercial-Off-The-Shelf (COTS) IA and IA- enabled products comply with AFI 33-200, Information Assurance. Some of these products must be Committee on National Security Systems Policy 11 (CNSSP-11) compliant, requiring them to be validated by accredited labs under the National Information Assurance Partnership (NIAP) Common Criteria Evaluation and Validation Scheme or National Institute of Standards and Technology (NIST) Federal Information Processing Standards (FIPS) Cryptographic Module Validation Program (CMVP) as identified in the sections below. The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small businesses to include 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned small business concerns. The government requests that interested parties respond to this notice if applicable and identify your small business status to the identified NAICS code. If applicable, please provide any anticipated teaming arrangements, along with a description of similar services offered to the Government and to commercial customers for the past three years. Any responses involving teaming agreements should delineate between the work that will be accomplished by the prime and the work accomplished by the teaming partners. Program Details: Air Force Nuclear Weapons Center (AFNCW) has a requirement for the following: Design Solution: For equipment currently installed at the Hill Air Force Base (AFB) System Missile Integration Complex (SMIC) Installation and Testing: For solution in the SMIC Tech Data Package: Complete Data package for the Design Solution above (Gov. to retain full rights) User Level Training: Complete training suite for system at SMIC Random sample hardness testing: To be conducted through program lifecycle The primary components making up the backup Transfer Power System (TPS) will be as follows: Commercial Off The Shelf (COTS) in accordance with FAR 2.101 (b) (1)(2)(3)(4)(5)(6) or Commercial Off The Shelf (COTS), IAW, FAR "Commercially available off-the-shelf (COTS) item" 2.101 (b)(1)(2) Automatic Transfer Switch (ATS) (replaces the current Automatic Switching Unit (ASU) and Minuteman III Power Processor (MPP). Made by ASCO Diesel Electrical Unit (DEU) Made by Cummins Fuel Day Tank Made by Simplex Scope This SOW defines the services required to meet the deficiencies identified in the ASU-R program, and the deliverables essential for Production and Deployment (P&D) phase to include all required testing and training. The P&D phase follows the successful completion of Milestone C decision. The Air Force Nuclear Weapon Center (AFNWC) ICBM Systems Directorate (MMIII SD) at Hill Air Force Base (AFB), Utah provides the systems engineering and management of the ASU-R program. The Air Force Global Strike Command (AFGSC) operates the facilities which will receive the equipment provided by this program. Background The MMIII ASUs and Minuteman Power Processors (MPPs) currently in operation at active wing Launch Facilities (LFs) and Missile Alert Facilities (MAFs) require replacement. The ASUs and MPPs function to provide electrical standby power source transfer capability between the - normal commercial utility source and the standby Diesel Electric Unit (DEU). The ASU provides power source switching and generator relay control functions, while the MPP monitors and controls the ASU. The existing ASUs and MPPs are aging and no longer supportable. A modern Automatic Transfer Switch (ATS) will replace both the ASU and MPP, and combine them into one supportable unit. The ASU-R Program is intended to replace legacy hardware that has faced obsolescence with a Commercial-Off-The-Shelf (COTS) solution to provide a smaller logistical footprint and increased reliability. The new DEU is also a COTS solution providing the latest and most reliable diesel electric power generation. The EMD phase (as well as the follow-on SMIC TO contract) produced the engineering documentation required for the P&D phase, including equipment specifications, drawings, computer models, interface drawings, demolition and installation drawings, and Technical Orders (TO). In addition, the new equipment was installed at the Strategic Missile Integration Complex (SMIC) in order to facilitate further evaluation and testing. As a result of the SMIC Physical Configuration Audit (PCA), some additional testing was conducted along with a System Requirement Document review. The result of the testing and reviews identified significant missed requirements after the ASU-R EMD phase to be addressed with possible re-design, prior to Production and Deployment (P&D). The EMD phase as well as the follow-on SMIC TO contract produced the engineering documentation required for the P&D phase, including equipment specifications, drawings, computer models, interface drawings, demolition and installation drawings, Civil Engineering Manuals (CEM) and TOs. The Government intends to furnish this documentation to the Contractor at the start of the P&D program phase. Any information submitted by respondents to this sources sought synopsis is voluntary. This sources sought notice is not to be construed as a commitment by the Government, nor will the Government reimburse any costs associated with the submission of information in response to this notice. Respondents will not be individually notified of the results of any government assessments. The Government's evaluation of the capability statements received will factor into whether any forthcoming solicitation will be conducted as a full and open competition or as a set-aside for small businesses, or any particular small business designation (e.g. SDVOSB, HUBZone, 8(a), WOSB, VOSB, etc.). Capabilities package: All interested firms shall submit a capabilities package that explicitly demonstrates company capabilities-indicating as applicable: examples of commercial sales-and product specifications related to this effort. Also indicate if you are the manufacturer, or provide the name and size of the manufacturer of the product(s) you will be supplying. The solution must be a commercial product. Respondents are further required to indicate their status as a Foreign-owned/foreign-controlled firm and any contemplated use of foreign national employees on this effort. Include in your capabilities package your DUNS, Cage Code, System for Award Management expiration date, GSA contract number and expiration (if applicable), and any related specifications/drawings. Responses may be submitted electronically to the following e-mail address: christopher.walker.99@us.af.mil Section I: Relevant Experience This Sources Sought Synopsys is also being used to help the government fully identify the scope of this requirement. Please include in your response answers to the following: Describe your firm's experience in designing and producing backup Transfer Power Systems (TSP). What is your experience in working with testing systems during, and after installing equipment backup TPS's? Describe your experience installing, maintaining, and testing equipment in extreme weather conditions at remote locations. Please describe your experience relative to engineering, maintaining, troubleshooting and integrating complex systems / Federal, State, and Local Government approved subsystems. Please describe your experience relative to engineering, maintaining, troubleshooting and integrating mobile backup power transfer systems / Federal, State, and Local Government approved subsystems. If you plan to subcontract, what percentage and portion of the SOW will you subcontract and with whom? What experience does your company have with the following: generating, editing, reviewing, maintaining, and validating Drawings, Process Orders (PO's), Operating Instructions (OI's), Technical Orders (TO's) and Time Compliance Technical Orders (TCTO's)? Does the intention of the SOW make sense? If given the opportunity to respond to a Request for Proposal (RFP), would your firm respond? Section II: Technical Capability Describe your ability to manage sub-contractors, in terms of schedule, budget, and technical performance. What access do you have to government shared databases or how would you recommend to report and provide system data on a regular basis to the program office? What contract type would you think is appropriate for this the ASU-R program effort based on the requirements mentioned in the SOW? (Section 3 Requirements) What timeframe do you estimate your firm could complete the work described in the SOW? What potential risks do you see in terms of cost, schedule, and performance? For the potential risks mentioned above, how would you eliminate or mitigate those risks identified? Explain your ability to update information (e.g. Engineering Orders, Engineering Change Notices, and Engineering Change Orders) Finally, provide any recommendations, questions and/or concerns in regards to the Draft TRD and the Draft SOW. (Pages; use attached Comment Resolution Matrix)

More opportunities from Department Of Defense → FA8214 Afnwc Pzbb

Same awarding agency

NAICS: 336419
Federal
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
Solicitation # FA821426RB004
The Department of the Air Force, Air Force Nuclear Weapons Center, is soliciting the production and delivery of 25 flight test kit replenishment spares for the Flight Test, Telemetry, and Termination (FT3) Program. These kits, which consist of a Flight Destruct System and an Integrated Instrumentation System, directly support the Air Force Global Strike Command Minuteman III Intercontinental Ballistic Missile Force Development Evaluation Operational Test Launch Program. The government intends to award a Firm-Fixed-Price contract to The Boeing Company as a sole source, citing their unique technical data and infrastructure. The total estimated program value is approximately 955 million dollars, with a period of performance spanning from October 2027 through September 2035. The contractor is responsible for the assembly, testing, and just-in-time delivery of the kits to Vandenberg Space Force Base, California, precisely 120 days prior to scheduled launches, with the first delivery expected in January 2032. All hardware must comply with strict Range Commanders Council commonality standards and military packaging and marking specifications. The contract mandates rigorous quality control, including the submission of a Quality Assurance Program Plan and Acceptance Test Reports. Additionally, the contractor must adhere to stringent operations security, cybersecurity, and data rights requirements to protect critical information and ensure government access to necessary technical data.
Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

POSTED

about 2 months ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS