Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Justice was posted on September 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B & F Project 24Z1AIT Building 1 Interior Upgrade Sprinkler System

Closed
15B11124Q0000022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

Department Of Justice → Fci MemphisView Agency

NAICS

333998 - All Other Miscellaneous General Purpose Machinery ManufacturingView NAICS

Place of Performance

Bartlett, TN, 38134, USA

Set-Aside

SBA

Documents

(1)

Upgrade+Sprinkler+System.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fci Memphis
Contacts2 people available
OfficeMEMPHIS, TN, 38134, USA
Organization / Agency
Department Of Justice → Fci Memphis
View Agency Profile
Office AddressMEMPHIS, TN, 38134, USA

Full Description

Show more
The FCI Memphis is a facility with a rated capacity of 862 low-security inmates within a secure perimeter fence. The Building I was previously utilized in a factory setting when FPI(Federal Prison Industries) used the building. The sprinkler system of Building I will need some upgrades due to the change of use for an inmate programming unit. The contractor will provide labor, equipment, and materials needed to complete the project at Building I. The work includes, but is not limited to the following: 1. The contractor will furnish and install a new backflow preventer at the base of the wet pipe system. 2. The contractor will remove existing pendant fire sprinkler heads and drops throughtout the openceiling with rotating existing pipe upward for new tees and sprinkler heads. 3. The contractor will disconnect and cap the 2-inch fire sprinkler line through the wall for the adjacent building that is being demolished. 4. The classrooms and restrooms will need the fire sprinkler heads replaced and fitted for new grid/sheetrock ceilings. See the attached approved drawings of the layout. 5. Install new fire sprinkler piping above grid/sheetrock ceilings in restrooms to add fire sprinkler coverage and adjust fire sprinkler heads for proper clearances. 6. Install sway braces, retainer straps, and flexible couplings to protect the system piping from damage due to earthquakes in accordance with NFPA 13. 7. Test all new fire sprinkler systems in accordance with NFPA 13.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS