B369 Boiler
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract seeks the provision of a new NTI model LX-600 hydronic gas boiler with a minimum capacity of 600,000 BTU input and at least a 4:1 turndown ratio. The boiler must feature an ASME stainless steel heat exchanger, be floor-mounted, and include a factory-installed ASME relief valve. It is required to have 95% combustion efficiency, a 4-inch exhaust vent and fresh air intake, an outdoor sensor, CSD-1 controls, an integrated electronic touchscreen controller, and a factory-installed condensate trap along with a condensate drain kit. The physical dimensions must not exceed 24 inches in width, 47.5 inches in depth, and 55 inches in height, with specific water and gas connections located on the left-hand side and air inlet/exhaust connections either on the top or left-hand side. The contractor must provide a comprehensive warranty covering all new materials for at least one year. The government will only accept quotes that comply with an attached competition-restricting memo, emphasizing adherence to specified contractual conditions. This solicitation is a total small business set-aside under NAICS code 332410 and is posted by the Department of Defense, specifically the office at Offutt Air Force Base, Nebraska. Quotes are due by June 17, 2026, at 11:00 AM CST, with primary and secondary points of contact provided for inquiries. The place of performance is listed as St Columbans, Nebraska.
General Info
Agency
NAICS
Place of Performance
St Columbans, NE, 68113, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The scope of work is to provide a new NTI model LX-600 boiler; 600,000 BTU input, with ASME SS heat exchanger, floor-mount, factory-provided ASME relief valve, at least 4 to 1 turn down, 95% combustion efficiency, 4” exhaust vent and 4” fresh air intake, with outdoor sensor, CSD-1 controls, integrated electronic controller with touch screen access, and factory-installed condensate trap and included condensate drain kit.
The hydronic gas boiler must be at least 600 MBH capacity, with at least 4:1 turndown on natural gas, and dimensions no larger than 24"wide x 47.5"deep(long) x 55" high, with water (2") and gas (1") connections along the left-hand length side and air inlet/exhaust (4") connections along the top or left-hand length side.
The Contractor shall provide at least a 1-year comprehensive warranty on all new materials.
The government will only accept quotes providing a product in accordance with the attached restricting competition memo.
Quotes due 17 June 2026 11:00 AM CST
