This Solicitation opportunity from Pennsylvania was posted on March 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The City of Lancaster, Pennsylvania, is soliciting bids for the 2026 ADA Curb Ramps Project, solicitation number B820-26-03. The project scope involves the replacement of existing curbs and sidewalks and the construction of ADA-compliant curb ramps at various city locations to improve accessibility and safety. The work includes specific technical requirements for pavement restoration, utility trench repair, and the installation of truncated domes, with updated specifications increasing standard sidewalk width from 48 to 60 inches. The project is funded in part through a Community Development Block Grant from the US Department of Housing and Urban Development.
Bids must be submitted online via PennBid by April 27, 2026, at 11:00 AM. The City will select the lowest responsible bidder based on a combination of price, quality of services, past performance, and technical resources. Contractors are required to comply with non-discrimination laws and L&I prevailing wage rates. Technical execution must adhere to the City of Lancaster Streets and Sidewalks Ordinance and PennDOT Publication 408 specifications. Contractors are further mandated to provide pre-construction photographic and video documentation of all work areas and manage traffic flow and utility disruptions to minimize public impact.
General Info
Lancaster bids for 2026 ADA curb ramp and sidewalk construction due April 27.
PDF, High priority: read this firstwage-determination
HighAI Summary for 2026 ADA Curb Ramp Project Prevailing Wages Rates: This document is a prevailing wages project rates determination for the 2026 ADA Curb Ramp Project in the City of Lancaster, Lancaster County. Issued by the Bureau of Labor Law Compliance, it includes detailed hourly wage rates, fringe benefits, and total compensation for various labor classifications such as asbestos workers, boilermakers, carpenters, electricians, and operators. The rates are effective as of various dates from 2023 to 2027, with the determination date of March 4, 2026, and contract award date of May 18, 2026. The document serves as a critical reference for wage compliance on this highway-related construction project.
XLSX
XLSX, High priority: read this firstspecifications
HighAI Summary for 2026 ADA Project Curb and Sidewalk Construction Specifications Addendum 1: This document, dated February 2026, provides supplemental curb and sidewalk construction specifications for the City of Lancaster. It outlines general requirements, material standards, construction procedures, and special requirements to ensure public health, safety, and compliance with local and federal codes including ADA guidelines. The document includes permit requirements, construction standards, and references to relevant city codes and state specifications. It serves as a technical guide for contractors and city personnel involved in curb and sidewalk projects under the 2026 ADA Project, ensuring adherence to minimum standards and best practices.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 2026 ADA Ramp Project Addendum #1 - Standard General Conditions: This document is Addendum #1 for the 2026 ADA Ramp Project, providing the Standard General Conditions of the Contract. It defines key terms used in the contract such as Addenda, Agreement, Bid, Change Order, City, Contract, Contractor, Contract Price, Contract Times, Engineer/Architect, and others. The addendum clarifies contractual definitions and procedural elements essential for bidding and contract execution. It serves as a foundational reference for the contractual relationship between the City of Lancaster and the Contractor, ensuring mutual understanding of terms and conditions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 2026 ADA Ramp Project Addendum 1 - Technical Specifications: This document is Addendum 1 for the 2026 ADA Ramp Project, providing detailed technical specifications and a summary of work. It outlines the project description involving replacement of ADA ramps and sidewalk installation at various city locations, contractor use of premises, work sequence requirements, and special conditions such as utility service disruptions and restoration responsibilities. The addendum includes site-specific information, contractor obligations for storage and traffic management, and requirements for pre-construction photographic and video documentation. The document aims to guide contractors on project execution, compliance with ADA guidelines, and coordination with city authorities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2026 ADA Ramp Project Technical Specifications Addendum #1: This document is an addendum to the 2026 ADA Ramp Project technical specifications. It includes a detailed summary of work covering project description, location, contractor's use of premises, work sequence, and special requirements. The project involves replacement of ADA ramps and sidewalk installation at various city locations. It outlines contractor responsibilities such as storage, traffic flow maintenance, utility service management, and restoration. The document also mandates pre-construction photographic and video documentation to record existing site conditions. The addendum ensures compliance with federal ADA guidelines and city regulations, emphasizing minimizing public disruption and safety during construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2026 ADA Ramp Project Technical Specifications Addendum 1: This document is an addendum to the 2026 ADA Ramp Project technical specifications. It includes a summary of work covering project description, location, contractor's use of premises, work sequence, and special requirements. The project involves replacement of ADA ramps and sidewalk installation at various city locations. It outlines contractor responsibilities for site use, storage, traffic flow, utility service disruptions, and restoration. The document also mandates pre-construction photographic and video documentation of work areas. This addendum provides detailed technical and procedural guidance essential for project execution.
XLSX
XLSX, High priority: read this firstsow
HighAI Summary for 2026 ADA Ramp Project Technical Specifications and Summary of Work: This document is a Statement of Work (SOW) for the 2026 ADA Ramp Project, detailing the technical specifications and summary of work. It includes a project description focused on replacing ADA ramps and installing sidewalks related to city paving projects. The document specifies project locations with detailed street and work limits, contractor use of premises, work sequencing to minimize disruption, and special requirements such as utility service management, safety measures, and documentation obligations. It also mandates pre-construction photographic and video documentation. The document is essential for contractors to understand project scope, site conditions, and operational constraints.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2026 Public Right-of-Way Bureau Specification and Detail Summary: This document provides a summary of changes to the 2026 Public Right-of-Way Bureau Specification and Detail, focusing on revisions to curb and sidewalk specifications, details, and street details. Key updates include increasing the standard sidewalk width from 48in to 60in, new drainage requirements, clarifications on expansion around utilities, and changes to detectable warning surfaces and tree root trimming guidelines. Street details were also updated with new utility trench repair and base repair cross sections, revised pavement marking requirements, and removal of certain crosswalk detail types. The document serves as an informational overview of specification and detail revisions for public right-of-way construction and maintenance.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 01 for B820-26-03 2026 ADA Curb Ramps Project: This document is Addendum No. 01 for the B820-26-03 2026 ADA Curb Ramps Project solicitation. It extends the bid submission deadline to April 27, 2026, and the question deadline to April 21, 2026. The addendum updates the project scope by adding additional ramps, revises the bid package and bid tab, and updates the location map. Federal funding requirements and related clauses have been removed, including Davis-Bacon wage rates, though L&I wage rates remain. The document also includes minutes from a non-mandatory prebid meeting held on April 8, 2026, detailing project schedules, specifications, and instructions for submitting questions. This addendum is critical for bidders to understand changes to submission deadlines, project scope, and contract terms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 1 for B820-26-03 2026 ADA Curb Ramps Project: This document is Addendum No. 01 for the B820-26-03 2026 ADA Curb Ramps Project solicitation. It extends the bid submission deadline to April 27, 2026, and the question deadline to April 21, 2026. The addendum updates the project scope by adding additional ramps, revises the bid package and bid tab, and updates the location map. Federal funding requirements and related clauses have been removed, including Davis-Bacon wage rates, though L&I wage rates remain. The document also includes minutes from a non-mandatory prebid meeting held on April 8, 2026, detailing project schedules, specifications, and instructions for submitting questions. This addendum is critical for bidders to understand changes to submission deadlines, project scope, and contract terms.
XLSX
XLSX, High priority: read this firstbid-tab
HighAI Summary for B1 - 2026 ADA Project Bid Tab Addendum #1: This document is an addendum #1 to the bid tab for the 2026 ADA Project, detailing pricing and quantities for curb and sidewalk notice work, mobilization, traffic control, general conditions, standard unit pricing for various construction tasks, and contingency items. It includes line items with descriptions, units of measure, quantities, and placeholders for unit prices and totals. The document also provides location-specific details for ADA ramp locations and associated construction quantities. Revisions with Addendum #1 are highlighted in red.
XLSX
XLSX, High priority: read this firstbid-tab
HighAI Summary for B1 - 2026 ADA Project Bid Tab Addendum 1: This document is the bid tabulation for the 2026 ADA Project, including Addendum 1 revisions. It details the pricing structure for various parts of the project such as mobilization, traffic control, curb and sidewalk work, standard unit pricing for multiple project areas, and contingency items. Quantities and unit prices are listed for items like curb construction, pavement restoration, concrete ramps, sidewalks, truncated domes, and other related construction tasks. The document also includes location-specific notes and quantities for ADA ramp locations and related construction elements. The bid tab reflects updates made in Addendum 1, indicated in red, and provides a comprehensive cost breakdown for the project scope.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for B820-26-03 2026 ADA Curb Ramps Project Request for Bids: This document is a Request for Bids (RFB) for the 2026 ADA Curb Ramps Project issued by the City of Lancaster, PA. It includes the solicitation number B820-26-03 and sets the bid submission deadline for April 27, 2026, at 11:00 AM. The project involves construction of ADA compliant curb ramps, replacement of curbs, sidewalks, and related work at various city locations. The document contains detailed project descriptions, locations, bid instructions, required forms, contract documents, and compliance requirements including performance and payment bonds, non-discrimination laws, and federal/state regulations. It also references funding from a Community Development Block Grant (CDBG) from HUD. The document serves as the primary solicitation for contractors to submit competitive bids for the project.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for B820-26-03 2027 Addendum No. 1 ADA Curb Ramps Project: This document is Addendum No. 1 for the 2027 ADA Curb Ramps Project, revising the 2026 Public Right-of-Way Bureau Specification and Detail. It includes changes to curb and sidewalk specifications such as increasing standard sidewalk width from 48 to 60 inches, drainage requirements, expansion around utilities, and removal of replaceable detectable warning surfaces. It also updates curb and sidewalk details, including new and revised detail sheets for sidewalk additions and downspout drains. Street details were added and revised, including utility trench repair, base repair cross section, pavement compaction testing, and updated pavement marking requirements. The addendum clarifies and updates technical specifications and construction details relevant to the project.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for B820-26-03 2027 Addendum No. 1 ADA Curb Ramps Project: This document is Addendum No. 1 for the B820-26-03 2027 ADA Curb Ramps Project. It serves as an amendment to the original solicitation or contract, providing updates or changes to the project requirements or specifications. The addendum is critical for contractors to review to ensure compliance with the latest project details.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for C01 - Standard General Conditions of the Contract: This document titled 'Standard General Conditions of the Contract' defines key terms and terminology used in the contract between the City of Lancaster and the Contractor. It includes definitions for terms such as Agreement, Architect, Bid, Change Order, Claim, Contract Price, Contract Times, Contractor, Engineer/Architect, and others. The document serves as a foundational reference for understanding the contractual obligations, roles, and procedures applicable to the project. It is essential for interpreting the contract documents and ensuring compliance with the contract's requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for C01 - Standard General Conditions of the Contract - Pavement Restoration Notes: This document titled 'C01 - Standard General Conditions of the Contract' contains detailed pavement restoration notes and street repair details. It includes specific instructions on milling and overlay requirements based on surface disturbance, compaction testing, and compliance with PennDOT Publication 408 specifications. The document is revised as of 2/18/26 and issued by the City of Lancaster Bureau of Engineering, Department of Public Works. It provides technical guidance for utility trench repair, base roadway repair, mill & overlay, level & overlay, and street reconstruction details.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for C03 - 2026 ADA Tech Specs Addendum #1: This document is an addendum to the 2026 ADA Technical Specifications, specifically identified as Addendum #1. It includes detailed provisions from Chapter 262 of the City of Lancaster Code concerning streets and sidewalks. The content covers general provisions, definitions, regulations on snow emergencies, nuisances, curb and sidewalk construction and maintenance, street excavations, and streetscape district standards. The addendum outlines the authority, applicability, and responsibilities of property owners and the City regarding sidewalks, curbs, and streets, including enforcement and penalties. It serves to update or clarify technical specifications related to ADA compliance and city infrastructure standards.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for C03 - 2026 ADA Tech Specs Addendum 1 - Subcontractor Interest Instructions: This document is Addendum 1 to the C03 - 2026 ADA Technical Specifications. It provides instructions for subcontractors interested in participating in the project through the PennBid platform. The addendum outlines a 5-step process for subcontractors to register, find the project, and submit their interest using the Prime/Subcontractor Form tab. It also explains how submitted contact information will be publicly displayed to facilitate connections between prime contractors and subcontractors. The document emphasizes that once submitted, contact information cannot be edited except through the vendor profile. This addendum is critical for subcontractor engagement and project participation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for C04 - Curb and Sidewalk Specs 2026: This document titled 'C04 - Curb and Sidewalk Specs 2026' appears to be a specifications document related to curb and sidewalk construction or modification for the year 2026. It includes 26 pages and references a location map for the 2026 ADA Ramp Project, indicating it contains technical details and requirements for compliance with ADA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CDBG Labor Standards Chapter - April 2017: This document is Chapter 16 of a manual providing detailed labor standards requirements for construction work funded by Community Development Block Grant (CDBG) programs, dated April 2017. It covers federal labor laws applicable to CDBG-funded projects including the Davis-Bacon Act, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, and Section 3 of the Housing and Urban Development Act. The chapter outlines responsibilities of grantees and contractors, bidding and contracting requirements, wage rate decisions, and compliance procedures. It also references additional HUD guides and resources for ensuring adherence to labor standards in federally assisted construction projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Lancaster Street Details Paving 2026: This document titled 'Street Details Paving' from the City of Lancaster Bureau of Engineering, Department of Public Works, dated 2/18/26, provides detailed pavement restoration notes and construction requirements. It outlines conditions for mill and overlay work, compaction testing, and material compliance with PennDOT Publication 408. The document includes various repair detail drawings such as utility trench repair, base roadway repair, mill & overlay, level & overlay, and street reconstruction details. It serves as a technical specification for street paving and restoration work within the city.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Curb and Sidewalk Construction Specifications February 2026: This document titled 'Curb and Sidewalk Construction Specifications' dated February 2026 provides detailed supplemental construction standards and guidelines for curbs and sidewalks in the City of Lancaster. It includes general requirements, material specifications, construction procedures, and special requirements to ensure public health, safety, and welfare. The specifications supplement local ordinances and incorporate applicable state and federal codes such as ADA and PROWAG. Key content covers permits and fees, construction details, material standards, and design criteria for curbs, sidewalks, pedestrian ramps, and driveway aprons. The document aims to guide construction, repair, replacement, and maintenance of curbs and sidewalks to meet minimum standards and promote community aesthetics and safety.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Curb and Sidewalk Details 2026 - James & Cherry Midblock Crossing: Concept drawing (Alternative 2) for the James & Cherry midblock crossing, produced by the Bureau of Engineering, Department of Public Works. The document specifies proposed bus stop locations, high-visibility crosswalks, daylighting transitions, and curb ramp modifications.
PDF
PDF, Low priorityspecifications
LowAI Summary for C05 - 2026 Summary of C&S Specification and Street Detail Revisions: This document titled 'C05 - 2026 Summary of C&S Specification, C&S and Street Detail Revisions' appears to be related to specifications and revisions for construction and street details for the year 2026. The content includes a location map for the 2026 ADA Ramp Project. The document likely summarizes changes or updates to construction and street specifications relevant to this project.
PDF
PDF, Low priorityother
LowAI Summary for C06 - Curb and Sidewalk Details 2026: The document titled 'C06 - Curb and Sidewalk Details 2026' consists of 3 pages. No readable content or specific procurement information is available from the provided data.
PDF
PDF, Low priorityordinance
LowAI Summary for City of Lancaster Streets and Sidewalks Ordinance Chapter 262 April 2017: This document is the City of Lancaster's Streets and Sidewalks Ordinance, Chapter 262, adopted by the City Council and dated April 2017. It contains 34 pages detailing regulations and provisions related to streets, sidewalks, curbs, and related infrastructure within the city. The ordinance includes general provisions, definitions, snow emergency rules, nuisances and obstructions, curb and sidewalk regulations, street excavations, and streetscape district standards. It establishes authority, applicability, enforcement, penalties, and responsibilities of property owners for maintenance and repair. The document serves as a regulatory framework to promote health, safety, and welfare through coordinated development and infrastructure maintenance.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for PennBid Instructions for Interested Subcontractors: This document provides instructions for subcontractors interested in participating in a project via PennBid. It outlines a 5-step process to register, find the project named 'Urban,' and submit interest as a subcontractor through the Prime/Subcontractor Form tab. The document explains that submitted contact information will be publicly listed to facilitate connections between vendors. It also notes that certain profile fields are pulled automatically and cannot be edited after submission, with instructions to update these fields in the vendor profile. The document is 2 pages long and serves as guidance for subcontractor engagement rather than a solicitation or contract.
Ref. #: City of Lancaster, Lancaster County There will be a non-mandatory virtual pre-bid conference held Wednesday, April 8, 2026, VIA MICROSOFT TEAMS at 11:00 AM. Please use the following information for access:
Meeting ID: 274 763 292 326 21
Passcode: yZ7kZ9ih PUBLIC NOTICE
B820-26-03 2026 ADA Curb Ramps Project
CITY OF LANCASTER, PA The City of Lancaster, PA will receive bids online for the 2026 ADA Curb Ramps Project until April 22, 2026, at 11:00AM at which time they shall be opened electronically and publicly on PennBid’s website. In general, the work under this contract consists of the replacement of existing curbs, sidewalks and associated work related to the construction of ADA compliant curb ramps. All documents and solicitation details are available online at no cost on PennBid- http://pennbid.bonfirehub.com. The successful bidder shall be required to comply with all applicable laws protecting individuals from discrimination. The Project and contract are subject to certain requirements, including to make payment of certain minimum salaries and wages and compliance with all provisions of the Steel Products Procurement Act, and other applicable requirements of federal and state law as specifically set forth in Article 26 of the Instructions to Bidders. Additionally, the Project is being funded in part through a Community Development Block Grant (CDBG) from the US Department of Housing and Urban Development (HUD). The City will determine who is the lowest responsible bidder upon the basis of the bids submitted. The lowest responsible bidder need not be the bidder submitting the lowest dollar amount. The City may consider the quality of services supplied, responsiveness of the bidder, past performance of the bidder, compatibility of the bidder’s processes with other City services and the bidder’s ability to handle the volume of work proposed. Further, consideration will be given to such matters as contractor integrity, compliance with public policy, record of past performance, and financial and technical resources as specifically set forth in the Instructions to Bidders. The City reserves the right to reject the bid of any bidder not possessing satisfactory qualifications. The City reserves the right to reject any or all bids and re-advertise if the best interest of the City will thereby be promoted. The City also reserves the right to waive technical defects if in its judgment, the interest of the City shall so require. The City further reserves the right to waive any informalities in the bids received and reject any or all bids for any reason whatsoever. Included in its right to reject bids, is the right for the City, in its sole discretion, to reject bids which are deemed by the City to be incomplete, conditional, or obscure, or which contain additions, erasures, alterations, omissions or irregularities of any kind.
More opportunities from Pennsylvania → Lancaster County
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.