This Sources Sought opportunity from Department Of Defense was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
B926 OSI Flooring
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a full carpet replacement with Luxury Vinyl Tile (LVT) for the Office of Special Investigations (OSI) section in building B926. In addition to replacing carpet with LVT, approximately 230 square feet of carpet tile will also be replaced with new carpet tile. The scope includes the demolition of a wall separating two existing rooms. Work must be performed in phases to ensure the security of the area remains intact throughout the project. All activities are required to comply with the provided Statement of Work, Concept Design Drawings, and applicable Air Force regulations and standards. This opportunity is designated as a Total Small Business Set-Aside under NAICS code 236220 and is being conducted by the Department of Defense, specifically the 14th Construction Logistics Agency based in Columbus, Mississippi. It is important to note that this posting is for sources sought and market research only, with no contract award to be made from this solicitation. Key contacts for this opportunity are Jaelin Bankhead and Daniel Stilts, and responses are due by June 4, 2026.
General Info
Agency
NAICS
Place of Performance
Columbus, MS, 39710, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full carpet replacement with Luxury Vinyl Tile (LVT) for the Office of Special Investigations (OSI) section of B926. The project also includes the approximate replacement of 230 sqft of carpet tile with carpet tile, and the demolition of a wall between two existing rooms. This work will have to be done in phases to maintain security of the area. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
This is a sources sought and for market research purposes only. No award will be made off this posting.
