Backup Generator Installation and Entrance and Exit Driveway Construction for Sewer Lift Station 101 Harbor Development Permit No. 26-027
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the installation of a 100kW diesel backup generator at Sewer Lift Station 101 in Long Beach, California, to ensure uninterrupted operation during power outages. This includes the replacement of the existing manual transfer switch with an automatic transfer switch, integrating the new generator into the Port’s existing SCADA system for remote monitoring and control. Additional scope involves installing low voltage wiring to support the generator’s battery charger and heater systems, ensuring reliable cold-weather performance and consistent startup capability. Beyond the electrical upgrades, the project requires the construction of a gravel entrance and exit driveway through Harbor Scenic Drive to provide safe and accessible vehicular access to the facility. All work must comply with local regulations and environmental standards, given the facility’s critical role in wastewater infrastructure. The project is managed by the Port of Long Beach, with Tyler Hanks serving as the primary point of contact and Axl Cisneros as a supporting engineer, and was publicly posted in June 2026.
General Info
Agency
NAICS
Place of Performance
Long Beach, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
