This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Badger Hill Seed Orchard Well

Awarded
127EAW26Q0058Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This is a Firm Fixed Price solicitation for the construction of a well at the Badger Hill Seed Orchard within the Eldorado National Forest in California, issued as a combined synopsis and Request for Quotation under FAR Part 12 for commercial items. The acquisition is a Total Small Business Set-Aside with a NAICS code of 237110 and a size standard of $45 million, open only to responsible small business concerns. The work includes site preparation, drilling, installation of casing and pumping systems with a solar power component, water line installation, system testing, cleanup, and final acceptance, all in compliance with ASTM, MUTCD, EPA, and California plumbing standards. The estimated contract value ranges from $25,000 to $100,000, and performance must be completed within 60 calendar days after receipt of the Notice to Proceed, with all work finalized and invoiced by December 1, 2026. The contract requires adherence to strict environmental and safety protocols, including spill prevention, erosion control, fire safety measures, and compliance with the Davis-Bacon Act wage determinations for Eldorado County. A site visit is not organized, and the offeror assumes all risk from inadequate site inspection. The solicitation mandates submission of four required materials via email: a completed and signed SF-1442, the Schedule of Items, a technical approach narrative not exceeding five pages, and a bid guarantee submitted as a cashier’s check or Standard Form 24, with the original mailed directly to the contracting officer. Electronic submissions must be in Word or PDF format; no external links or zip files are permitted. Key personnel including a Project Manager, Superintendent, Quality Control Manager, Safety Manager, and after-hours emergency contact must be designated and approved. Fire safety requirements are stringent due to the high-risk wildfire environment, necessitating fuel clearance, restricted smoking, electric-only blasting caps, 24/7 emergency contact availability, and immediate reporting of any fire within 15 minutes. All work must be inspected at the destination by the Contracting Officer or designated COR, with acceptance contingent on conformance to specifications, successful testing, and certification. Payment will be processed exclusively through the Invoice Processing Platform (IPP), and the contract includes clauses for performance and payment bonds, Buy American compliance, Differing Site Conditions, and whistleblower protections. Technical merit is the primary evaluation criterion, with award to the highest technically rated offeror whose price is fair and reasonable and whose past performance is

General Info

U.S. USDA seeks small business quotes for Badger Hill Seed Orchard Well project in California, due September 1, 2026.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

CA, USA

Set-Aside

SBA

Documents

10

Badger Hill Solar Well Project Drawings

PDF, High priority: read this firstdrawings
High

Contract Administration Data for USDA Forest Service Projects

PDF, High priority: read this firstcontract-administration-data
High

Davis-Bacon Act Wage Determination CA20260007 for Eldorado County

PDF, High priority: read this firstwage-determination
High

Fire Plan for Contract Area C04

PDF, High priority: read this firstfire-plan
High

RFI Form for Solicitation 127EAW26Q0058 Badger Hill Seed Orchard Well

DOCX, High priority: read this firstrfi
High

Schedule of Items for Badger Hill Seed Orchard Well

DOCX, High priority: read this firstschedule-of-items
High

Solicitation 127EAW26Q0058 Badger Hill Seed Orchard Well

PDF, High priority: read this firstrfq
High

Specifications for Trenching, Backfill, and Vertical Irrigation Well Drilling

PDF, High priority: read this firstspecifications
High

Statement of Work for Badger Hill Seed Orchard Well Installation

PDF, High priority: read this firstsow
High

Badger Hill Orchard Directions and Clone Bank Location

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 6 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Office AddressAlbuquerque, NM, 871023498, USA
Contacts

Full Description

Show more

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.


Solicitation number 127EAW26Q0058 is issued as a Request for Quotation (RFQ) for Badger Hill Seed Orchard Well at Eldorado National Forest, California.


This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.


The applicable North American Industry Classification Standard Code is 237110 - Water and Sewer Line and Related Structures Construction. The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

IMPORTANT NOTES:
Please refer to the "Quote Submission Requirements" section in attachment 1 for detailed instructions on submitting your quote, including all required documents and information.

All Requests for Information (RFI's) shall be submitted to the Contracting Officer no later than August 24, 2026, at 11:00 AM Pacific Time.

An organized site visit will not be held.


In no event shall failure to inspect the site constitute grounds for a claim after award.

More opportunities from Department Of Agriculture → Csa Southwest 6 Usda-Fs

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS