This Solicitation opportunity from Department Of Defense was posted on September 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BAFS Flight Line Debris and Restoration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation FA521526R0013 is a firm-fixed-price contract set aside for small businesses, issued by the 766th Enterprise Sourcing Squadron for the Department of the Air Force. The project focuses on flight line debris clearance and restoration at Bellows Air Force Station in Waimanalo, Hawaii. The primary objective is the removal and proper disposal of vehicles, tires, scrap metal, asphalt piles, and DRMO assets, as well as the clearing and mulching of approximately 7 to 17 acres of invasive vegetation, specifically ironwood trees. This effort supports the 2025 Bellows AFS Integrated Natural Resource Management Plan and is critical for eliminating fire hazards and ensuring the route is safe for emergency first responders transporting critical patients. The scope of work is divided into specific zones, with a primary completion deadline for the red outlined area of February 1, 2027, and overall project completion by May 1, 2027. Contractors are required to provide a comprehensive work plan, including a health and safety plan, and must comply with all federal, state, and local environmental laws. Award eligibility is based on technical capability and delivery schedule, evaluated on an acceptable or unacceptable basis, with pricing determined to be fair and reasonable. The contract incorporates various FAR and DFARS clauses, including Service Contract Act wage determinations for Hawaii and specific security requirements for base access.
General Info
Agency
NAICS
Place of Performance
Waimanalo, HI, 96795, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients.
These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels.
*AMENDMENT 0006*
- Changes made to PWS
- POC added to RFP
Reference the attached documents:
Attachment 1 PWS_BAFS_FLIGHTLINE _9.03.26
Attachment 6 RFP_9.03.26
Point of contact:
Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167
Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170
Contracting Officer: Brianna Davis: brianna.davis.6@us.af.mil 808-789-3171
More opportunities from Department Of Defense → FA5215 766 Ess Pkp
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
