Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on October 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Baker Draw Designated Shooting Area Shade Structure Installation

Closed
1240LT24R0052Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
SLED
Construction, CCSO Subsurface Water Intrusion
Solicitation # 2026-404
Collin County, Texas, has issued Invitation for Bid 2026-404 for the Construction, CCSO Subsurface Water Intrusion project. The contract involves providing all labor, supervision, materials, and equipment to repair moisture-related deterioration at the lower level of the south side of a building, following previous unsuccessful waterproofing attempts. The project has a probable construction cost of 200,000 dollars, and for evaluation purposes, a 100,000 dollar allowance for unknowns is added to all bids. The contract will be awarded to the lowest and best responsible bidder based on compliance with requirements, completion time, bidder qualifications, and proposed subcontractors. The selected contractor must provide a performance bond, payment bond, and a two-year maintenance bond within ten days of the award, and demonstrate acceptable insurance coverage 24 hours before starting work. Performance requirements include adhering to the Construction General permit TXR150000 and MS4 permits, as well as providing a trench safety plan sealed by a Texas Professional Engineer. All materials must be delivered in original, unbroken packaging and stored on raised platforms to prevent moisture exposure. The project timeline begins ten calendar days after the Notice to Proceed, and the contractor must submit a detailed progress chart prior to that notice. Compliance with E-Verify and ADA regulations is mandatory, and failure to pay stipulated wage rates will result in a penalty of 60 dollars per day per worker.
Construction and Projects

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 238190
New
SLED
Milpitas Sports Center Football Bleacher Replacement
Solicitation # 26-283
The City of Milpitas is soliciting bids for Project No. 3505, the Milpitas Sports Center Football Bleacher Replacement, located at 1325 E. Calaveras Blvd, Milpitas, California. This project requires a Class A licensed contractor to perform the demolition and replacement of existing football bleachers, along with comprehensive site improvements. The scope of work includes footing clearing, debris removal, earthwork, grading, erosion and sediment control, concrete work, electrical conduit routing and relocations, and the installation of fencing and gates. Additionally, the project mandates significant ADA upgrades to parking areas, restrooms, and access ramps. The engineer's estimate for the base bid is between $1.2 million and $1.4 million, with a required completion timeframe of 330 calendar days. Bids are due by 2:00 p.m. on November 19, 2026, and must be submitted using the City's official forms. Prospective bidders were required to attend mandatory pre-bid conferences on October 29 or November 3, 2026. Submissions must include a 10% bid security in the form of cash, a certified check, or a bid bond from a California admitted surety. The contract will be awarded to the lowest responsive and responsible bidder based on the total base bid alone. Awardees must comply with California prevailing wage laws for Santa Clara County and provide certifications regarding noncollusion, DIR registration, and workers' compensation. Progress payments will be made at 95% of the City's estimate, with a 5% retention, and processed within 30 days of receiving an acceptable invoice and updated CPM schedule.
Engineering (CIP)

POSTED

about 19 hours ago

DEADLINE

in 30 days
NAICS: 238190
New
SLED
RFP 2027-10192026 School Building Exterior Inspection, Repair & Restoration
Solicitation # 2027-10192026
Shenandoah County Public Schools is soliciting proposals for a firm-fixed-price, turnkey contract to provide inspection, investigation, repair, and restoration of exterior insulation and finish systems (EIFS) for schools throughout the division, beginning with Stonewall Jackson High School. The scope of work includes moisture testing, documenting deficiencies, and the full removal and replacement of EIFS systems, including the installation of air/water-resistive barriers, insulation boards, and compatible sealants. Additional requirements cover the restoration of covered entrance vestibules, door awnings, and commercial caulking systems. All work must adhere to manufacturer specifications and the detailed requirements outlined in the solicitation attachments. Proposals are due by November 6, 2026, and will be evaluated based on experience and past performance (40 points), the proposed project schedule and ability to minimize school disruptions (20 points), and proximity to Woodstock, VA (10 points). Awarded contractors must provide comprehensive general liability and workers' compensation insurance, undergo criminal background checks for personnel, and adhere to strict non-discrimination and student privacy policies. Payment is issued net thirty days following the approval of invoices for work completed. Final acceptance is contingent upon the system being watertight and the submission of all closeout documentation and warranties.
Shenandoah County Public Schools

POSTED

1 day ago

DEADLINE

in 17 days
NAICS: 238190
New
SLED
Miramar College Pool Deck Replacement And Replaster Project
Solicitation # HH26270599
The San Diego Community College District is soliciting bids for the Miramar College Pool Deck Replacement and Replaster Project under solicitation number HH26270599. The scope of work involves comprehensive repairs to the competition and recreation pools, including replastering walls and bottoms, repairing cracks at the north end, and ensuring proper drainage through the repair of perimeter slot drains. Additionally, the project requires the removal and replacement of pool deck coatings, deck and bottom tiles, and coping tiles, as well as the demolition of existing one-meter and three-meter diving board cement bases to install new diving platforms and grade beams. The project is governed by the California Uniform Public Construction Cost Accounting Act and requires compliance with Title 24 regulations and Division of State Architect oversight. Bids must be submitted electronically via the PlanetBids Portal by 2:00 p.m. on November 10, 2026. The contract will be awarded to the lowest responsive and responsible bidder who possesses a valid Class A or B license, including a C-53 Swimming Pool Contractor license. Required submission documents include a bid bond of at least ten percent of the bid amount, a site visit certification, and CARB compliance certification. Awardees must provide a baseline schedule within ten days of the Notice to Proceed and adhere to mandatory participation in an Owner Controlled Insurance Program administered by Keenan & Associates. The base bid includes a project allowance of 170,000 dollars, and the contractor is required to comply with California prevailing wage laws and certified payroll reporting.
San Diego Community College District

POSTED

1 day ago

DEADLINE

in 21 days
NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
FA8137 Afsc Pzioc

POSTED

4 days ago

DEADLINE

in 27 days

General Info

NAICS

238190 - Other Foundation, Structure, and Building Exterior Contractors

Place of Performance

Ault, CO, 80610, USA

Set-Aside

SBA

Documents

8

Amendment 0001 to Solicitation 1240LT24R0052

PDF, High priority: read this firstamendment
High

Baker Draw Designated Shooting Area Shade Structure Installation SOW

DOCX, High priority: read this first7 pages · sow
High

Forest Service FP-14 Construction Specifications

DOCX, High priority: read this first48 pages · specifications
High

General Decision Number C020240029 - Wage Determination (Colorado)

PDF, High priority: read this firstwage-determination
High

Shooting Range Shades Structure - Foundation and Roof Framing Plans

PDF, High priority: read this firstspecifications
High

Solicitation 12401T24R0052 - Baker Draw Shooting Area Shade Structure Installation

PDF, High priority: read this firstrfp
High

RFP Question and Answer Template

DOC, Low priority2 pages · q-and-a
Low

US Forest Service Contractor Experience Questionnaire

DOCX, Low priority2 pages · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Sep 2, 2024 to Sep 20, 2024. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA
Contacts
Elizabeth Ratcliff

Full Description

Show more
Update: Update: The U.S Forest Service CSA #8 hereby cancels the solicitation for Baker Draw Designated Shooting Area Shade Structure Installation that was originally issued on August 15, 2024 and for which proposals were due on September 20, 2024 due to lack of availability of funds, and for needed changes in the scope of the statement of work. Persuant to FAR 52.232-18 Availability of Funds" Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the avallability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made avallable to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer." in "Section I" of this solicitation. Interested vendors are encouraged to watch SAM.gov for future re-solicitation announcements once funds are available. NOTICE: This solicitation has been amended to extend the close date of this solicitation to 9/20/2024 12:00 PM MDT, please review ALL the new documents attached to this announcement. No bid bonds/offer guarantee will be required for this project. Project Title: Baker Draw Designated Shooting Area Shade Structure Installation The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete this project. Set Aside: Total Small Business Set-Aside (FAR 19.5) Magnitude: (b) Between $25,000 and $100,000. Location: County Road 96, Ault, CO 80610 (40.68348492181887, -104.46646484844645) Period of Performance: 60 Days After Notice to Proceed (NTP). Complete work no later than September 1st, 2025. Site Visit: No government escort. Offerors are urged and expected to inspect the site where the work will be performed. Contractor Questions Due No Later Than: 8/23/2024 12:00 PM MDT Use document titled "Contractor Questions and Answers Template" to write down your questions and send the document to elizabeth.ratcliff@usda.gov before 8/23/2024 12:00 PM MDT. Request for Proposal Solicitation Close Date: 9/20/2024 12:00 PM MDT Instructions to Bidders: See Section L. Evaluation/Award Factors: See Sections L&M.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Other Heavy and Civil Engineering Construction

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details
NAICS: 238990
New
Federal
Big Springs Horse Corral Replacement
Solicitation # 1240LT26Q0179
Solicitation 1240LT26Q0179 is a total small business set-aside for the Big Springs Horse Corral Replacement project located in the Westside Ranger District of the Caribou-Targhee National Forest in Caribou County, Idaho. The project requires the supply and installation of a 20 by 60 foot four-rail divided steel oil pipe corral with concrete post embedment. The contractor is responsible for all mobilization, clearing and grubbing, and the implementation of temporary traffic control measures, including closing local traffic and posting public notices for the duration of the work. There are two optional award items: the construction of one additional 20 by 60 foot corral and the installation of a hitching rail. The contract is a firm fixed price agreement with an estimated performance period from June 1, 2027, through July 31, 2027, allowing for 61 calendar days for completion. Award will be made to the lowest technically rated offeror with fair and reasonable pricing and acceptable or neutral past performance, evaluated via an experience questionnaire focusing on general construction and concrete work. Payment bonds are required for contracts exceeding 35,000 dollars. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave and minimum wage standards. Bids must be submitted to the USDA Forest Service by October 29, 2026.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 562910
New
Federal
Bunkhouse Asbestos Mitigation
Solicitation # 1240LT27Q0010
Solicitation 1240LT27Q0010 is a total small business set-aside for the removal and replacement of approximately 2,900 square feet of asbestos-containing building materials at three facility locations within the Rio Grande National Forest in Colorado. The scope of work includes the abatement of asbestos from ceilings, walls, windows, and flooring, followed by the installation of new materials such as drywall and wood flooring, and finishing the interior walls and ceilings with paint. Performance is scheduled to occur between October 30 and December 30, 2026. The project is estimated to have a value between 100,000 and 250,000 dollars. Award will be based on the best value to the government, with cost and price serving as the most important evaluation factor. Other critical requirements include the submission of a technical narrative and a record of past performance within the last three years. Contractors must provide 100 percent payment and performance bonds, as well as a bid bond equal to 20 percent of the total offer price. Additionally, the contractor is required to hire an independent third party for air clearance testing before renovation begins and must adhere to all applicable asbestos laws, OSHA regulations, and Davis-Bacon Act wage requirements. Quotations must be submitted via the specified Excel pricing format by the deadline of October 28, 2026.
Remediation Services

POSTED

6 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS