Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on September 10, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BALANCING MACHINE

Awarded
FA8101-08-Q-0067Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

N/A

Contract Value

$52,665

NAICS

332212 - Hand and Edge Tool Manufacturing

Place of Performance

7858 5th St., STE 1, Tinker, OK, 73145, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 9:00 PM UTC to 10:00 PM UTC on Aug 19, 2008. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Michelle P. SythContract Specialist

Full Description

Show more
PURCHASE A NEW BALANCE MACHINE WITH THE FOLLOWING FEATURES AND COMPONENTS: 1. The balance machine model: a base on floor. 2. The machine to support a minimum weight of rotor: 98 lb. 3. The machine to support a minimum weight per pedestal: 50 lb. 4. The machine to support a minimum diameter of rotor over bed: 20 inches. 5. The machine to support a minimum diameter of rotor over belt tensioner: 18 inches. 6. The machine to support a maximum length of rotor between bearing centers: 20 inches. 7. The machine to support a minimum distance between support bearing centerlines with belt drive inboard: 3.0 inches. 8. Sensitivity: Less than or equal 0.3 gmm/kg. 9. Accuracy (displacement of C.G): Less than or equal 10 micro inch. 10. Unbalance reduction ratio: 95% 11. Rated power of motor: AC motor with frequency drive, minimum 1Hp (0.75 KW) with minimum speed of 1200 rpm, dynamic braking, speed regulation +/-1%. 12. The machine to use an available on-site power source: 480VAC, 3 phase, 60Hz. 13. Inboard endless loop belt quantities: Minimum 3 ea. 14. Width of the belt: 0.5 inches. 15. Minimum one set of two end thrusts. 16. Minimum one set of two safety arms with negative load rollers. 17. Belt guide and belt tensioner, pneumatically or manually operated. 18. Photocell assembly with mounting bracket. 19. A safety shroud with inside lights required to prevent operator to contact a spinning rotor accidently and also to block small objects possibly ejected during the machine operation. 20. Electrical Cabinet, Computer with Control Console: - Operation System: Windows base software. - Ability to add additional Microsoft software drivers. - Minimum 2 USB ports. - Minimum 512KB RAM. - Color touch screen display monitor. - Minimum 1.5GHz or faster CPU. - DVD and CD-RW drives. - Minimum 1 serial port. - Minimum 80GB hard drive. - Emergency stop, start-stop switch, speed control potentiometer, internal power supply and transformer, all housed in and on an enclosure. 21. A LaserJet printer with ink cartridge(s) inside. 22. A turnkey machine installation which includes the following requirements: - Disconnect current electrical service from the existing balance machine. - Disconnect current shop air supply from the existing balance machine. - Remove and transport the existing balance machine to designated disposal location within the building.214. - Uncrate, transport to site, installation, leveling, anchoring and grouting of the new balance machine including all material. - Hookup the available electrical service, 480V, 3 ph, 60 Hz to the new balance machine. - Hookup the compressed air to the new machine if the machine is designed for the air operation. 23. Two days on site training for the use of the machine, preventive maintenance, and safety instruction must be provided by an experienced service engineer. 24. Options: Tools, calibration equipment and balance master if applicable. Numbered Note 1 is applicable

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS