Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bale Slough - Bear Creek Restoration Project - Group B

Closed
FC 26-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 9 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

This contract pertains to the Bale Slough – Bear Creek Restoration Project located just east of State Highway 29 in Napa County, California. The scope of work includes demolition, excavation, and removal of organic material, followed by grading activities. The project also involves constructing biotechnical stabilization structures and habitat features, installing and maintaining native vegetation, and implementing erosion control measures to support environmental restoration efforts in the area. The solicitation, identified as FC 26-02, was posted on May 1, 2026, with a response deadline set for June 4, 2026. It is managed by the Public Works department of Napa County, with key contacts including Jeremy Sarrow, Watershed and Flood Control Manager, and Ross Murphy, Assistant Engineer. The project’s location is in California, and the work is overseen by local government officials focusing on watershed and flood control improvements. Interested parties can access further information and submit responses through the designated procurement portal.

General Info

Bale Slough restoration project: demolition, grading, biotechnical stabilization, native planting, erosion control.

Documents

15

Bale Slough Bear Creek - Group B Plans

PDF, High priority: read this firstspecifications
High

Bale Slough - Bear Creek Restoration Project Group B Location Map

PDF, High priority: read this firstspecifications
High

Bale Slough Bear Creek Restoration Project Group B Technical Specifications

PDF, High priority: read this first100 pages · specifications
High

EPIMS-NAP23604 R3 - Bale Slough Bear Creek Restoration Agreement

PDF, High priority: read this firstcontract-document
High

FC 2602 - Bale Slough Bear Creek Restoration Project Group B

PDF, High priority: read this first59 pages · ifb
High

FC 26-02 Bale Slough Bear Creek Restoration Project - Prevailing Wage Rates

PDF, High priority: read this first1 page · wage-determination
High

FC26-02 Bale Slough/Bear Creek Tributary Restoration Project - Contract for Construction

DOC, High priority: read this first3 pages · contract-document
High

AGRICULTURAL_BERM_DETAIL.pdf

PDF, Low priority1 page · other
Low

Bale Slough Bear Creek Restoration Project - Site Meeting Location

PDF, Low priority1 page · special-notice
Low

Bale Slough-Bear Creek Tributary Restoration Project - CWA 401 Certification

PDF, Low priority15 pages · award
Low

FC 26-01 Bale Slough - Bear Creek Restoration Project Group B Site Walk Sign-in Sheet

PDF, Low priorityother
Low

FC26-02 Bale Slough/Bear Creek Tributary Restoration Project - Bid Bond

DOCX, Low priority2 pages · bid-bond
Low

FC26-02 Bale Slough/Bear Creek Tributary Restoration Project - Bond Templates

DOCX, Low priority2 pages · other
Low

SPN-2022-00032 Bale Slough-Bear Creek Restoration Project

PDF, Low priority4 pages · award
Low

SITE_10_WORK_AREA_LIMITS.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts2 people available
OfficeNapa, CA, 94559, USA
Organization / AgencyCalifornia → Public Works
Office AddressNapa, CA, 94559, USA
Contacts
Jeremy SarrowWatershed and Flood Control Manager
Ross MurphyAssistant Engineer

Interested Companies (66)

EntramPORT CHARLOTTE, FL
Hanford Applied Restoration & ConservationSan Rafael, CA

See All 66 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The project is in a segment of Bale Slough – Bear Creek located just east of State Highway 29 in Napa County. The work will consist of demolition, excavation and off haul of organic material, grading, construction of biotechnical stabilization structures and habitat features, installation and maintenance of native plants, and deployment of erosion control measures.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT
Solicitation # IFB No. PW-0332
The HSIP Cycle 11 and 12 Unsignalized Crossing Improvement Project, managed by the City of Santa Cruz Public Works Department, involves comprehensive roadway and pedestrian safety enhancements across five specific locations. The scope of work includes the installation of concrete curbs, gutters, curb ramps, roadway signs, pedestrian activated beacons, and thermoplastic striping and pavement markings. Work must be performed in accordance with the 2025 State of California Department of Transportation Standard Specifications, City Standard Specifications, and ADA standards. The project is divided into Cycle 11, covering Laurel Street at Blackburn Street, Broadway at Pennsylvania Avenue, and Seabright Avenue at Logan Street, and Cycle 12, covering High Street at Cardiff Place and Soquel Avenue at Poplar Avenue. This solicitation is an Invitation for Bids with a response deadline of November 5, 2026. The contract will be awarded to the lowest responsible and licensed bidder based on the City's estimated quantities of work. The successful contractor must complete the project within 50 working days and provide Faithful Performance and Labor and Material bonds each equal to 100 percent of the contract price within 10 calendar days of the award. Key administrative requirements include compliance with Department of Industrial Relations prevailing wage laws, the submission of a DIR Compliance Affidavit, and adherence to the City of Santa Cruz Quality Assurance Program. Payment terms include a 10 percent retention on the estimated value of work performed and a 20 percent retention on unused materials delivered.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 562111
New
SLED
Request for Proposals for Services Related to the City of Tustin's Solid Waste Management Franchise Agreement
Solicitation # Requests for Proposals
The City of Tustin is seeking proposals for an exclusive ten-year Solid Waste Management Franchise Agreement to provide collection services for garbage, recyclable materials, organic waste, and construction and demolition debris. The selected contractor will be responsible for the collection, transportation, and delivery of materials to city-approved facilities, ensuring strict compliance with flow-control requirements and state mandates, including SB 1383 for organic waste diversion. The contract requires the contractor to provide specific color-coded and labeled containers, with new carts manufactured from at least twenty percent recycled material. Performance is monitored through strict reliability and quality standards, including a requirement to commence new customer service within seven business days. Proposals are evaluated on a 100-point scale based on service rates, financial ability, qualifications, and customer service reliability, though the city is not obligated to select the lowest bidder. Financial requirements include a one million dollar performance bond, a twenty-five thousand dollar security check, and proof of assets covering start-up and three months of operating costs. The agreement includes a structured pricing model for residential, multi-family, and commercial services, alongside specific fees for solicitation and annual administration. Awardees must adhere to ADA compliance for on-premises collection and maintain rigorous safety and regulatory standards as overseen by the Director of Public Works.
Solid Waste Collection

POSTED

6 days ago

DEADLINE

in 3 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS