Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on April 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Barnaby Run Sewer Replacement/Rehabilitation

Closed
101597State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and SWPPP, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveying, traffic control, and preconstruction video. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation for this project, specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

34 minutes ago

DEADLINE

in 2 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to bidding terms. Bidders must provide a bid bond, performance and payment bonds, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with MWBE requirements, including the submission of a Good Faith Efforts Form and Table A, is mandatory for responsiveness. Contract administration is managed by Willis Engineers on behalf of the City of Belmont. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payment is processed monthly via applications for payment reviewed by the engineer.
Don Moorhead Construction, Inc.

POSTED

34 minutes ago

DEADLINE

in 14 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the replacement of motor control center components, and improvements to electrical and instrumentation systems. Other key tasks include lead abatement, metals fabrication, painting, coatings, the installation of slide gates, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses, as well as DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, ahead of the project bid date on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

34 minutes ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Washington Suburban Sanitary Commission (WSSC) is soliciting sealed bids for the Barnaby Run Sewer Replacement/Rehabilitation project, which involves the repair, rehabilitation, or replacement of approximately 0.82 miles of defective sewer mains and laterals in the Oxon Run Basin, Prince George's County, Maryland. This work includes the installation of around 4,257 linear feet of cured-in-place pipe (CIPP) lining and the rehabilitation or replacement of eighteen manholes. The project is funded through a Maryland Department of the Environment State Revolving Fund (MDE SRF) Loan, which imposes specific federal and state compliance requirements, including adherence to Davis-Bacon prevailing wage rates, the mandatory use of American Iron and Steel (AIS) products, and compliance with the Build America Buy America Act (BABA). Contractors are required to submit certifications confirming the use of AIS and BABA-compliant materials and construct an MDE/EPA-approved project sign on-site. This solicitation emphasizes strict compliance with contractual provisions defined under Maryland’s Water Quality and Drinking Water Revolving Loan Funds, which include a broad range of mandates such as non-discrimination, safety regulations, anti-kickback laws, and prevailing wage enforcement. The contract documents incorporate EPA guidance on AIS and BABA to ensure contractors align with federal financial assistance program requirements. The project bids must be submitted electronically through WSSC’s eProcurement Portal by the specified deadline, and late submissions will not be accepted. Points of contact for the project include Steven Jackson, the Project Manager, and Ardelle Knight, the Procurement Specialist. This procurement not only addresses critical infrastructure upgrades in Prince George’s County but also reinforces federal and state policy goals around labor standards, material sourcing, and environmental compliance.

General Info

WSSC seeks bids for sewer rehab in Prince George's, requiring AIS, BABA, Davis-Bacon compliance.

Documents

15

American Iron and Steel (AIS) Material Checklist Memorandum

PDF, High priority: read this firstspecial-notice
High

Barnaby Run Sewer Replacement/Rehabilitation IFB 101597

PDF, High priority: read this firstifb
High

Barnaby Run Sewer Replacement/Rehabilitation Solicitation 101597

PDF, High priority: read this firstrfp
High

Build America Buy America Act Implementation Procedures for EPA Office of Water

PDF, High priority: read this firstimplementation-procedures
High

Build America Buy America Act Supplemental Q&A for EPA Office of Water

PDF, High priority: read this first3 pages · q-and-a
High

Contract CKCMH7427B22 Barnaby Run Sewer Rehabilitation

PDF, High priority: read this firstcontract-document
High

Contract Drawings for ESA Sewer Facilities Rehabilitation CKCMH7427B22

PDF, High priority: read this firstcontract-drawings
High

ESA Task Order 18-35 Oxon Run Phase II Sewer Facilities Rehabilitation Contract Drawings

PDF, High priority: read this firstcontract-drawings
High

Maryland Water Quality and Drinking Water Revolving Loan Fund Contract Provisions

PDF, High priority: read this first61 pages · contract-provisions
High

Special Provisions for Sewer and Water Main Work

PDF, High priority: read this firstspecial-provisions
High

Utility Patch Details - Maryland DOT SHA Standards MD 578.01

PDF, High priority: read this firstspecifications
High

WSSC Standard Specification Incorporation

PDF, High priority: read this firstsow
High

WSSC Temporary Right of Entry Agreement for Sewer Repair Program

PDF, High priority: read this firstcontract-document
High

Mid-Atlantic Purchasing Team Intergovernmental & Cooperative Purchasing Clause

PDF, Low prioritycooperative-purchasing-clause
Low

PCD Tracking Sheet - Manhole Work and Permitting

PDF, Low prioritytracking-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 3, 2026 to May 21, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → Procurement Office
Contacts2 people available
OfficeLaurel, MD, 20707, USA
Organization / AgencyMaryland → Procurement Office
Office AddressLaurel, MD, 20707, USA
Contacts
Steven JacksonProject Manager
Ardelle KnightBuyer/Procurement Specialist

Interested Companies (43)

Rivers Construction GroupJessup, MD
Geiger Pump and EquipmentAston, PA
Insituform TechnologiesChesterfield, Missouri

See All 43 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Project Title . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO Response Submission Time on Response Submission Date . Late responses will not be accepted. The project consists of the repair, rehabilitation, or replacement of 0.82 miles of defective sewer mains and laterals utilizing 4257 LF (0.8 miles) of cured-in-place pipe (CIPP) lining and eighteen (18) manholes located in the Oxon Run Basin, Prince George's County, Maryland. The Project is MDE SRF Loan funded. The applicable State Insert titled Requirements and Contract Provisions for the Treatment Works Projects Financed through the Maryland Water Quality Loan Fund and the Maryland Drinking Water Revolving Loan Fund, Department of the Environment, State of Maryland, and other requirements are incorporated in the contract documents. The bidders should make note of the special additional requirements imposed through the use of this funding such as but not limited to the use of Davis-Bacon Wage Rates, the use of American Iron and Steel (AIS) products, the use of American made manufactured products and construction materials as mandated by the Build America Buy America Act (BABA), the submission of AIS and BABA material certifications to WSSC Water, and installation of the MDE/ EPA project sign. The EPA final guidance documents for AIS and BABA are incorporated in these contract documents for reference.

More opportunities from Maryland → Procurement Office

Same awarding agency

NAICS: 624190
SLED
FY27 Building a Cecil County Community Health Worker Workforce
Solicitation # CCHD-2027-006
Solicitation CCHD-2027-006, titled FY27 Building a Cecil County Community Health Worker Workforce, is a cost reimbursement request for proposals issued by the Maryland Procurement Office. The initiative seeks to fund the hiring of up to two Community Health Workers per offeror, with a maximum annual funding limit of 62,500 dollars per worker. Eligible applicants include non-profit organizations with 501(c)(3) status, local government agencies, and specific health care or clinical entities, such as FQHCs and rural health clinics. To be eligible, offerors must be physically located in Cecil County and serve its residents. The initial period of performance begins on or before December 1, 2026, and ends on June 30, 2027, with the possibility of four one-year renewal terms based on funding and performance. Proposals are due by November 9, 2026, and must be submitted via email with a specific subject line. Evaluation is based on a weighted scale: the Scope of Work Questionnaire accounts for 80 percent, the budget for 15 percent, and the organizational description for 5 percent. Awardees will be selected based on the most favorable proposals, with funding available for between one and eight offerors. Required documentation includes a proposal cover page, a budget that excludes indirect costs, a proposal affidavit, a certificate of insurance, and a legal action summary covering the past five years. Contractors must also certify corporation registration, tax payment, and maintain a drug and alcohol-free workplace.
Other Individual and Family Services

POSTED

7 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS