Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation

Active
1697-001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation project is a general construction contract issued by the Department of Economic Development for the State of Vermont. The scope of work involves comprehensive improvements to the water system at 339 Carter Street in Barnet, Vermont, including modifications to the water treatment building, component upgrades, SCADA integration, relocation of existing components, underground piping, and associated site work. The project is funded in part through the Vermont Drinking Water State Revolving Fund and is managed by MSK Engineers. Bids must be submitted by December 3, 2026, at 2:00pm local time to the Barnet Town Hall or via the specified mailing address. Awardees are required to provide bid security and both performance and payment bonds totaling 100 percent of the contract price. The contract is subject to several federal mandates, including the Davis-Bacon Act for wage rates, Disadvantaged Business Enterprise requirements, and the Build America, Buy America Act and American Iron and Steel provisions, which mandate that iron, steel, and construction materials be produced in the United States. Additionally, the project adheres to prohibitions on certain telecommunications and video surveillance services or equipment.

General Info

Construction contract for PFAS mitigation and water system improvements in Barnet, Vermont.

Documents

1

Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation - Advertisement for Bids

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
Improvements to the water system, including water treatment building modifications, water treatment component upgrades, SCADA integration, relocation of existing components, underground piping, and associated site work in accordance with the contract plans and specifications.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Vermont → Department of Economic Development

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS