This Solicitation opportunity from Washington was posted on February 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Barrel Vault Recaulking
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract, issued by the Washington State Convention Center (SCC) under solicitation number 550-0226-1, covers the removal and replacement of the interior caulking and backer rod on the barrel-vault glazing system located in the skybridge at the SCC’s Arch facility in King County, Washington. The scope entails complete removal of existing materials, thorough cleaning and preparation of the joints, and installation of new backer rod matching the existing profile, followed by application of GE UltraGlaze SSG4000 structural silicone sealant—the original product used in 2001. The work includes approximately 416 glass panels on the barrel vault, with site access and work schedule restrictions to accommodate a major event and specific removal deadlines. Performance is required to meet all contract specifications, prevailing wage laws, safety regulations, and apprenticeship utilization mandates where applicable, with substantial completion targeted by August 5, 2026. Procurement is conducted as a competitive public works solicitation with bids submitted electronically via SCC’s Bonfire Hub portal, with a mandatory pre-bid meeting and clear deadlines set for vendor discussion and bid submission. Award will be based on Lowest Price Technically Acceptable criteria, evaluating responsiveness to specification compliance, bidder responsibility, and adherence to legal wage and labor practices. While Minority- and Women-Owned Business Enterprise (MWBE) participation is encouraged, it is not mandatory or scored. The contract incorporates state law as governing, imposes record retention, bonding and insurance requirements, and restricts assignment without owner consent. Inspection and acceptance occur at the project site under SCC oversight, with the Owner empowered to reject nonconforming work and verify compliance with ASTM and Canadian standards for sealants and installation quality. The contract documentation includes general terms and conditions specifically crafted for SCC facilities construction but lacks federal FAR clauses or detailed contract line item pricing, indicating a localized procurement process with flexible fill-in provisions awaiting finalization.
General Info
Place of Performance
Set-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Three Double Pane Glass replacements units 2Open now, due in 13 days
- Glass, Glazing, & Mirror ServicesOpen now, due in 30 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (11)
See All 11 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from Washington State Convention Center
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS