Battery Energy Storage System (BESS) Supply and Integration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the supply, installation, and commissioning of a battery energy storage system with a minimum capacity of 13.5 kWh, designed to enhance grid resilience in alignment with stringent national safety and performance standards including NEC 2023, NFPA 855, IEEE 1547, and UL 1741. The system must be fully integrated into the local grid infrastructure, ensuring reliable operation under diverse load and emergency conditions, and must be delivered with a comprehensive ten-year warranty covering both equipment and performance. All work is subject to strict compliance with technical specifications and safety protocols required for utility-scale energy storage deployment. The solicitation is classified as a subcontract under NAICS code 335912 and is managed by the Vermont office of the Department of Economic Development. The proposal deadline is August 5, 2026, at 10:00 AM, and all submissions must be made through the designated public portal. While no specific location is listed for performance, the system is intended for deployment within Vermont to support regional grid stability. Interested parties are directed to the official bid preview link for submission guidelines and additional procedural details, though no set-aside provisions or point of contact information is provided in the solicitation data.
General Info
Agency
NAICS
Place of Performance
VT, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Vermont → Department of Economic Development
Same awarding agency
